Work item | Question | Equiv. Num. | Status | Timing | Approval process | Version | Liaison relationship | Subject / Title | Priority |
K.5G-Lightning | Q1/5 | | Under study | 2025 | AAP | New | - | Practical guide for lightning protection, earthing and bonding, and safety consideration of 5G radio base station | Medium |
K.pids | Q1/5 | | Under study | 2025 | AAP | New | - | Practical guidance for protection of the indoor distribution system for mobile communication in large-scale physical buildings | Medium |
K.20_Revision | Q2/5 | | Under study | 2025 | AAP | Rev. | - | Resistibility of telecommunication equipment installed in a telecommunication centre to overvoltages and overcurrents | Medium |
K.21_Revison | Q2/5 | | Under study | 2025 | AAP | Rev. | - | Resistibility of telecommunication equipment installed in customer premises to overvoltages and overcurrents | Medium |
K.117 | Q2/5 | | Under study | 2025 | AAP | Rev. | IEEE 802.3 Ethernet working group | Primary protector parameters for the surge protection of equipment Ethernet ports | Medium |
K.147 | Q2/5 | | Under study | 2025 | AAP | Rev. | IEEE 802.3 Ethernet working group | Protection of digital ports connected to balanced pairs of conductors | Medium |
K.ecl | Q2/5 | | Under study | 2024 | AAP | New | IEEE SPDC WG 3.6.3 | Surge protective component application guide - Electronic Current Limiters | Medium |
K.gm | Q2/5 | | Under study | 2024 | AAP | New | IEEE PES Surge Protective Devices Committee, Working Group 3.6.1/2 Protective components | Performance Parameters and Test Methods for Hybrid Integrated Circuits Containing a Gas Discharge Tube (GDT) and a Metal-Oxide Varistor (MOV) | Medium |
K.isolators | Q2/5 | | Under study | 2024 | AAP | New | - | Integrated circuit isolators for telecommunications use | Low |
K.Suppl.25 | Q2/5 | | Under study | 2025 | Agreement | Rev. | IEEE 802.3 Ethernet Working Group | Long reach single twisted-pair Ethernet resistibility testing | Medium |
K.supple_tov | Q2/5 | | Under study | 2025-10 | Agreement | New | - | Protection of ICT Equipment with DC Power Supply against Transient Overvoltage (TOV) | Medium |
K.91 | Q3/5 | | Under study | 2025 | AAP | Rev. | ITU-R, ITU-D, IEC TC106 | Guidance for assessment, evaluation and monitoring of human exposure to radio frequency electromagnetic fields | Medium |
K.113 | Q3/5 | | Under study | 2025 | AAP | Rev. | ITU-R, ITU-D | Generation of radio-frequency electromagnetic field level maps | Medium |
K.AI&EMF | Q3/5 | | Under study | 2025 | AAP | New | - | EMF evaluation method using artificial intelligence in vicinity of 5G NR (IMT-2020) base station | Medium |
K.calibr | Q3/5 | | Under study | 2026 | AAP | New | ITU-R, ITU-D, IEC TC106 | Calibration for equipment for the EMF assessment | Medium |
K.devices | Q3/5 | | Under study | 2025 | AAP | New | ITU-R, ITU-D, IEC TC106, IEEE TC34 | RF-EMF exposure assessment of wireless communication devices operating close to the human body | Low |
K.reflection | Q3/5 | | Under study | 2025 | AAP | New | ITU-R, ITU-D, IEC TC106 | Impact of the metallic structures for the EMF exposure level | Medium |
K.Small | Q3/5 | | Under study | 2025 | AAP | New | - | Small base stations - impact on the overall exposure level | Medium |
K.Suppl.MethDataEMF | Q3/5 | | Under study | 2025 | AAP | New | ITU-D SG2 Question 7/2, ITU-R Working Party 1C | Guidance on Methodologies for RF-EMF Assessments and Responding to Public Concerns regarding human exposure to RF-EMF from Telecommunication Installations | Medium |
K.DMEI | Q4/5 | | Under study | 2025 | AAP | New | ITU-R WP5D, WP1A/B | Determination and mitigation of electromagnetic compatibility issues for 5G network under tropospheric duct effect | Medium |