Number |
Category |
Group |
Title |
66/1
|
(S3)
|
WP1A |
Methods and algorithms for frequency planning
Note - Suppressed on 27/10/08 (CACE/463)
|
202-2/1
|
(S2)
|
WP1C |
Identification and measurement of various interference sources to analogue and digital radiocommunications systems (according to their originating mechanism and interference effect)
Note - Suppressed on 26/01/10 (CACE/498)
|
205-2/1
|
(S2)
|
WP1B |
Long-term strategies for spectrum utilization
|
206/1
|
(S2)
|
WP1B |
Strategies for economic approaches to national spectrum management and their financing
Note - Suppressed on 23/09/11 (CACE/550 )
|
207/1
|
(S2)
|
WP1B |
Assessment, for spectrum planning and strategic development, of the benefits arising from the use of the radio spectrum
Note - Suppressed on 27/10/08 (CACE/463)
|
208-1/1
|
(S2)
|
WP1B |
Alternative methods of national spectrum management
|
209-1/1
|
(S2)
|
WP1B |
Parameters of radio systems and equipment required for spectrum management and the efficient use of the radio spectrum
Note - Suppressed on 23/09/11 (CACE/550 )
|
210-4/1
|
(S3)
|
WP1A |
Wireless power transmission
|
211/1
|
(C2)
|
WP1A |
Unwanted emissions
Note - Suppressed on 27/10/08 (CACE/463)
|
212/1
|
(C1)
|
WP1A |
Development of method(s) for the determination of the coordination area around earth stations
Note - Suppressed on 27/10/08 (CACE/463)
|
213/1
|
(S2)
|
WP1B |
Technical and operating parameters and spectrum requirements for short-range devices
Note - Suppressed on 27/10/08 (CACE/463)
|
214/1
|
(S2)
|
WP1C |
Monitoring of digital broadcasting signals
Note - Suppressed on 13/11/12 (CACE/593 )
|
215/1
|
(S2)
|
WP1C |
Monitoring of the radio coverage of land mobile networks to verify compliance with a given license
Note - Suppressed on 26/01/10 (CACE/498)
|
216-1/1
|
(S2)
|
WP1B |
Spectrum redeployment as a method of national spectrum management
|
217/1
|
(S2)
|
WP1A |
Compatibility between short range devices operating within the band 59-64 GHz and industrial, scientific and medical (ISM) applications operating in the band 61-61.5 GHz
Note - Suppressed on 27/10/08 (CACE/463)
|
218-1/1
|
(S2)
|
WP1C |
Techniques for measurement of radiation from high data rate telecommunication systems using wired electrical power supply
Note - Suppressed on 23/09/11 (CACE/550 )
|
219/1
|
(S2)
|
WP1C |
Remote access to radio monitoring equipment of other administrations
Note - Suppressed on 25/01/11 (CACE/523)
|
220-1/1
|
(S2)
|
WP1A |
Identification and characterization of various interference sources to analogue and digital radiocommunication systems (according to their originating mechanism and interference effect)
Note - Suppressed on 26/01/10 (CACE/498)
|
221-2/1
|
(S2)
|
WP1A |
Compatibility between radiocommunication systems and high data rate telecommunication systems using wired electrical power supply
|
222/1
|
(S2)
|
WP1A |
Definition of the spectral properties of transmitter emissions
|
223/1
|
(S2)
|
WP1B |
Guidance on the regulatory framework for national spectrum management
Note - Suppressed on 27/10/08 (CACE/463)
|
224/1
|
(C1)
|
WP1B |
Technical convergence with respect to terrestrial fixed, mobile, and broadcasting interactive multimedia applications and the associated regulatory environment
Note - Suppressed on 24/08/15 (CACE/751)
|
225/1
|
(S2)
|
WP1C |
Inspection of radio stations to verify compliance with licence parameters
Note - Suppressed on 26/01/10 (CACE/498)
|
226/1
|
(S1)
|
WP1B |
Spectrum management framework related to the introduction of ultra-wideband devices
Note - Suppressed on 27/10/08 (CACE/463)
|
227/1
|
(S1)
|
WP1A |
Compatibility between ultra-wideband devices and radiocommunication services
Note - Suppressed on 27/10/08 (CACE/463)
|
228/1
|
(C1)
|
WP1A |
Possibility and relevance of including in the Radio Regulations frequency bands above 3 000 GHz
Note - Suppressed on 27/10/08 (CACE/463)
|
229/1
|
(C1)
|
WP1B |
Improving the international spectrum regulatory framework
Note - Suppressed on 27/10/08 (CACE/463)
|
230/1
|
(S2)
|
WP1C |
Improved measurement methods for unwanted emissions of primary radars using magnetrons
Note - Suppressed on 23/09/11 (CACE/550)
|
231/1
|
(S2)
|
WP1C |
Measuring technique for measuring the noise floor in radio applications
Note - Suppressed on 26/01/10 (CACE/498)
|
232/1
|
(S2)
|
WP1C |
Methods and techniques used in space radio monitoring
|
233-1/1
|
(S3)
|
WP1C |
Measurement of spectrum occupancy
Note - Suppressed on 28/09/17 (CACE/836)
|
234/1
|
(S2)
|
WP1C |
Alternative techniques for radiolocation determination
Note - Suppressed on 23/09/11 (CACE/550 )
|
235/1
|
(S3)
|
WP1C |
Spectrum monitoring evolution
|
236/1
|
(S3)
|
WP1A |
Impact on radiocommunication systems from wireless and wired data transmission technologies used for the support of power grid management systems
|
237/1
|
(S3)
|
WP1A |
Technical and operational characteristics of the active services operating in the range 275-1 000 GHz
|
238/1
|
(S2)
|
WP1A |
Characteristics for use of visible light for broadband communications
|
239/1
|
(S3)
|
WP1C |
Electromagnetic field measurements to assess human exposure
|
240/1
|
(S2)
|
WP1B |
Assessment of spectrum efficiency and economic value
|
241/1
|
(S3)
|
WP1B |
Methodologies for assessing or predicting spectrum availability
|
242/1
|
(S3)
|
WP1B |
Spectrum management framework for the introduction of Ground- and Wall- Penetrating Radar (GPR/WPR) imaging systems
|
243/1
|
(S3)
|
WP1A |
Impact of unintentional radio frequency energy generated by electrical or electronic apparatus to the radiocommunication services
|