Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 148 ]
�
� |
Reply liaison statement to Working Party 7D - Studies under WRC-27 agenda item 1.10
�
� |
WP 5C
� |
AI1.10
� |
2024-12-13 |
|
[ 147 ]
�
� |
Liaison statement to Working Party 7D - WRC-27 agenda item 1.16
�
� |
WP 5A
� |
AI1.16
� |
2024-12-12 |
|
[ 146 ]
�
� |
Liaison statement to Working Party 7D (copy for information to Working Parties 4A and 4C) - WRC-27 agenda item 1.16
�
� |
WP 5B
� |
AI1.16
� |
2024-11-29 |
|
[ 145 ]
�
� |
Reply liaison statement to ITU-T Study Group 15 on the role of powerline telecommunications in home-networking (copy to ITU-T Study Group 5 and ITU-R Working Parties 1A, 5C, 6B, 7A and 7D for information)
�
� |
WP 6A
� |
� |
2024-11-18 |
|
[ 144 ]
�
� |
Liaison statement to Working Party 4A (copy to Working Parties 3M, 4B, 4C, 5A, 5B, 5C, 5D, 7B, 7C and 7D) - WRC-27 agenda item 1.6
�
� |
WP 6A
� |
AI1.6
� |
2024-11-18 |
|
[ 143 ]
�
� |
Liaison statement to Working Party 5C (copy to Working Parties 3J, 3M, 4A, 4B, 4C, 5A, 5B, 7C and 7D) - WRC-27 agenda item 1.10
�
� |
WP 6A
� |
AI1.10
� |
2024-11-18 |
|
[ 142 ]
�
� |
Liaison statement to Working Party 7C (copy to Working Parties 3L, 3M, 4C, 5A, 5B, 5C, 5D, 7B and 7D) - WRC-27 agenda item 1.17
�
� |
WP 6A
� |
AI1.17
� |
2024-11-18 |
|
[ 141 ]
�
� |
Reply liaison statement to Working Party 5C (copy to Working Parties 4A, 4B, 5A, 5B, 7C and 7D for information) - Studies under WRC-27 agenda item 1.10
�
� |
WP 4C
� |
� |
2024-11-12 |
|
[ 140 ]
�
� |
Reply liaison statement to Working Party 7D - Relevant technical information to support studies under WRC-27 agenda item 1.16 documenting FSS characteristics in some frequency bands - WRC-27 agenda item 1.16
�
� |
WP 4A
� |
AI1.16
� |
2024-11-08 |
|
[ 139 ]
�
� |
Reply liaison statement to Working Parties 7C and 7D on agenda item 1.18 - WRC-27 agenda item 1.18
�
� |
WP 4A
� |
AI1.18
� |
2024-11-08 |
|
[ 138 ]
�
� |
Reply liaison statement to Working Parties 3J, 3K and 3M (copy to Working Parties 5A, 5B, 5C, 5D, 7C and 7D for information) - Information to support studies under WRC-27 agenda item 1.1
�
� |
WP 4A
� |
AI1.1
� |
2024-11-07 |
|
[ 137 ]
�
� |
Reply liaison statement to Working Party 5B (copy for information to Working Parties 4A, 5A, 5C, 7C and 7D) - Relevant technical information to support studies in preparation of WRC-27 agenda item 1.8
�
� |
WP 4C
� |
AI1.8
� |
2024-10-22 |
|
[ 136 ]
�
� |
Reply liaison statement to Working Party 7B (copy to Working Parties 3L, 3M, 4A, 4B, 5A, 5B, 5C, 5D, 7C and 7D) - WRC-27 agenda item 1.11
�
� |
WP 4C
� |
AI1.11
� |
2024-10-22 |
|
[ 135 ]
�
� |
Reply liaison statement to Working Parties 3L, 3M, 4A, 4B, 5A, 5B, 5C, 6A, 7B, 7C and 7D (copy to Working Party 5D) - WRC-27 agenda item 1.13
�
� |
WP 4C
� |
AI1.13
� |
2024-10-22 |
|
[ 134 ]
�
� |
Reply liaison statement to Working Party 7D - WRC-27 agenda item 1.16
�
� |
WP 5D
� |
AI1.16
� |
2024-10-15 |
|
[ 133 ]
�
� |
Accumulation of 2% data losses in the frequency band 15.35-15.4 GHz that is allocated to radio astronomy and other passive services on a primary basis and subject to RR No. 5.340 (copy to Working Party 7D)
�
� |
Scientific Committee on Frequency Allocations for Radio Astronomy and Space Science (IUCAF)
� |
AI1.7
� |
2024-09-19 |
|
[ 132 ]
�
� |
Liaison statement to Working Party 5B (copy to Working Parties 3J, 3K, 3M, 4A, 4C, 5A, 5C and 7D for information) - Additional information on passive sensors in the EESS for WRC-27 agenda item 1.8
�
� |
WP 7C
� |
AI1.8
� |
2024-10-01 |
|
[ 131 ]
�
� |
Reply liaison statement to ITU-R Working Party 3J (copied for information to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 7A, 7C and 7D) - Response to Working Party 3J questions related to WRC-27 agenda item 1.15
�
� |
WP 7B
� |
AI1.15
� |
2024-09-30 |
|
[ 130 ]
�
� |
Liaison statement to Working Parties 3J, 4A, 4C, 5A, 5B, 5C, 5D, 7A, 7C and 7D - Report on progress of activities relating to WRC-27 agenda item 1.15
�
� |
WP 7B
� |
AI1.15
� |
2024-09-30 |
|
[ 129 ]
�
� |
Reply liaison statement to Working Party 5D on WRC-27 agenda item 1.7 (copy to Working Parties 3K, 3M, 4A, 4C, 5A, 5B, 5C, 7C and 7D)
�
� |
WP 7B
� |
AI1.7
� |
2024-09-30 |
|
[ 128 ]
�
+Ann.1-19� |
Report of the meeting of Working Party 7D (Almaty, Kazakhstan, 17-26 September 2024)
�
� |
Acting Chair, WP 7D
� |
� |
2024-09-27 |
|
[ 127 ]
�
� |
Final list of participants - Working Party 7D (Almaty, Kazakhstan, 17-26 September 2024)
�
� |
Director, BR
� |
� |
2024-09-27 |
|
[ 126 ]
�
� |
Reply liaison statement to Working Party 7B (copy to Working Parties 3J, 4A, 4C, 5A, 5B, 5C, 5D, 7C and 7D for information) - Information on the standard frequency and time signal service with regards to WRC-27 agenda item 1.15 on lunar communications
�
� |
WP 7A
� |
AI1.15
� |
2024-09-23 |
|
[ 125 ]
�
� |
List of documents issued (Documents 7D/41 - 7D/125)
�
� |
BR, Study Groups Department
� |
� |
2024-09-16 |
|
[ 124 ]
�
� |
Implementation of the Radio Quiet Zones Database
�
� |
Director, BR
� |
� |
2024-09-06 |
|
[ 123 ]
�
� |
Updates to working document towards a preliminary draft new Recommendation ITU-R RA.[GEOVLBI] - Guidance to administrations regarding geodetic very long baseline interferometry networks
�
� |
United States
� |
� |
2024-09-05 |
|
[ 122 ]
�
� |
Updates to working document towards a preliminary draft revision of Report ITU-R RA.2188-1 - Power flux-density and e.i.r.p. levels potentially damaging to radio astronomy receivers
�
� |
United States
� |
� |
2024-09-05 |
|
[ 121 ]
�
� |
Finalization of the draft new Report ITU-R RA.[RAS-IMT-COMPAT-43-GHZ] - Possible coordination and protection measures for stations of the Radio Astronomy Service operating in the 42.5-43.5 GHz allocation and IMT systems operating in the 37-43.5 GHz mobile service allocation
�
� |
United States
� |
� |
2024-09-05 |
|
[ 120 ]
�
� |
Working document towards a preliminary draft revision Report of ITU-R RA.2126 - Techniques for mitigation of radio frequency interference in radio astronomy
�
� |
United States
� |
� |
2024-09-05 |
|
[ 119 ]
�
� |
Working document towards a preliminary draft new Report ITU-R RA.[NGSO-RAS-RQZ] - Coexistence measures between non-GSO satellite systems and RAS stations in the Radio Quiet Zones supporting the Square Kilometre Array (SKA) and the Atacama Large Millimeter/submillimeter Array (ALMA)
�
� |
United States
� |
AI1.16
� |
2024-09-05 |
|
[ 118 ]
�
� |
Reply liaison statement to Working Party 4A - Relevant technical information to support studies under WRC-27 agenda item 1.16 documenting FSS characteristics in some frequency bands
�
� |
United States
� |
AI1.16
� |
2024-09-05 |
|
[ 117 ]
�
� |
Working document towards a preliminary draft revision of Recommendation ITU-R RA.479-5 - Protection of frequencies for radioastronomical measurements in the Shielded zone of the Moon
�
� |
United States
� |
� |
2024-09-05 |
|
[ 116 ]
�
� |
Updates to working document towards a preliminary draft new Report ITU-R RA.[SZM] - Radio astronomy facilities on the Moon
�
� |
United States
� |
� |
2024-09-05 |
|
[ 115 ]
�
� |
Proposed draft reply liaison statement to Working Party 5D - Relevant technical information to support studies under WRC-27 agenda item 1.7
�
� |
United States
� |
AI1.7
� |
2024-09-05 |
|
[ 114 ]
�
� |
Proposed draft elements on conference preparatory meeting Report on WRC-27 agenda item 1.16
�
� |
Germany
� |
AI1.16
� |
2024-09-05 |
|
[ 113 ]
�
� |
Proposed draft elements on the working plan on WRC-27 agenda item 1.16
�
� |
Germany
� |
AI1.16
� |
2024-09-05 |
|
[ 112 ]
�
� |
Reply liaison statement to Working Party 4A - Information to support studies under WRC-27 agenda item 1.16
�
� |
Germany
� |
AI1.16
� |
2024-09-05 |
|
[ 111 ]
�
� |
Radio astronomy antenna pattern above 76 GHz for WRC-27 agenda items 1.16 and 1.18
�
� |
France
� |
AI1.18, AI1.16
� |
2024-09-05 |
|
[ 110 ]
�
� |
Proposed working document toward recognition of international Radio Quiet Zone
�
� |
France
� |
AI1.16
� |
2024-09-05 |
|
[ 109 ]
�
� |
Proposals on the working document towards a preliminary draft new Recommendation ITU-R RA.[GEOVLBI] - Guidance to administrations regarding geodetic very long baseline interferometry networks
�
� |
Germany
,
Switzerland
� |
� |
2024-09-05 |
|
[ 108 ]
�
� |
Draft CPM text for WRC-27 agenda item 1.16
�
� |
Egypt
,
Saudi Arabia
� |
AI1.16
� |
2024-09-05 |
|
[ 107 ]
�
� |
Proposals to the working document towards a preliminary draft new Report ITU-R RA.[IMT-6GHZ]
�
� |
Russian Federation
� |
� |
2024-09-05 |
|
[ 106 ]
�
� |
Proposed revision of work plan proposal for WRC-27 agenda item 1.18 on resolves 2 of Resolution 712 (WRC-23)
�
� |
Korea (Rep. of)
� |
AI1.18
� |
2024-09-05 |
|
[ 105 ]
�
� |
SKAO white paper on WRC-27 agenda item 1.16
�
� |
Square Kilometre Array Observatory (SKAO)
� |
AI1.16
� |
2024-09-04 |
|
[ 104 ]
�
� |
Working document towards a preliminary draft new Report ITU-R RA.[UEMR] - Unintended electromagnetic radiation from space systems into RAS frequency bands
�
� |
Square Kilometre Array Observatory (SKAO)
,
Committee on Radio Astronomy Frequencies
� |
� |
2024-09-04 |
|
[ 103 ]
�
� |
Elements regarding Earth-based RAS protection towards a draft reply liaison statement to 7B on technical information to support the studies for WRC-27 agenda item 1.15
�
� |
Square Kilometre Array Observatory (SKAO)
� |
AI1.15
� |
2024-09-04 |
|
[ 102 ]
�
� |
Updates to working document towards a preliminary draft new Report ITU-R RA.[RAS 6-7 GHZ] - Compatibility calculations between stations of the terrestrial component of IMT in the band 6 425-7 125 MHz and RAS in the band 6 650-6 675.2 MHz
�
� |
Committee on Radio Astronomy Frequencies
,
Square Kilometre Array Observatory (SKAO)
� |
� |
2024-09-04 |
|
[ 101 ]
�
� |
Draft reply liaison statement to 4C on technical information to support the studies for WRC-27 agenda items 1.13
�
� |
Committee on Radio Astronomy Frequencies
,
Square Kilometre Array Observatory (SKAO)
� |
AI1.13
� |
2024-09-04 |
|
[ 100 ]
�
� |
Reply liaison statement to Working Party 4A - Information to support studies under WRC-27 agenda items 1.1 and 1.3
�
� |
Committee on Radio Astronomy Frequencies
,
Square Kilometre Array Observatory (SKAO)
� |
AI1.3
� |
2024-09-04 |
|
[ 99 ]
�
� |
Updates to working document towards a preliminary draft new Recommendation ITU-R RA.[IMT-6GHZ] - Methods to address the determination of the protection area around existing RAS stations from IMT stations in the frequency band 6 650-6 675.2 MHz
�
� |
Committee on Radio Astronomy Frequencies
,
Square Kilometre Array Observatory (SKAO)
� |
� |
2024-09-04 |
Results:148 total items. Result page:�
1 -
2 -
3
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):