International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : R23-WP7D Recently posted�-� Search Meeting Documents
ITU-R�R23-WP7D�Meeting Documents
Max # of documents displayed/page:
Results: 37 total items.
Number Date Source Title Questions�
Number� Posted Size
[ 148 ] 2024-12-13 WP 5C � Reply liaison statement to Working Party 7D - Studies under WRC-27 agenda item 1.10 � AI1.10 �
[ 148 ]��-�English�-� Word 2024-12-13 [13:52]� 35'212� bytes
[ 147 ] 2024-12-12 WP 5A � Liaison statement to Working Party 7D - WRC-27 agenda item 1.16 � AI1.16 �
[ 147 ]��-�English�-� Word 2024-12-12 [09:11]� 33'303� bytes
[ 146 ] 2024-11-29 WP 5B � Liaison statement to Working Party 7D (copy for information to Working Parties 4A and 4C) - WRC-27 agenda item 1.16 � AI1.16 �
[ 146 ]��-�English�-� Word 2024-11-29 [13:49]� 52'650� bytes
[ 145 ] 2024-11-18 WP 6A � Reply liaison statement to ITU-T Study Group 15 on the role of powerline telecommunications in home-networking (copy to ITU-T Study Group 5 and ITU-R Working Parties 1A, 5C, 6B, 7A and 7D for information) � N/A �
[ 145 ]��-�English�-� Word 2024-11-19 [09:36]� 34'059� bytes
[ 144 ] 2024-11-18 WP 6A � Liaison statement to Working Party 4A (copy to Working Parties 3M, 4B, 4C, 5A, 5B, 5C, 5D, 7B, 7C and 7D) - WRC-27 agenda item 1.6 � AI1.6 �
[ 144 ]��-�English�-� Word 2024-11-19 [09:02]� 37'740� bytes
[ 143 ] 2024-11-18 WP 6A � Liaison statement to Working Party 5C (copy to Working Parties 3J, 3M, 4A, 4B, 4C, 5A, 5B, 7C and 7D) - WRC-27 agenda item 1.10 � AI1.10 �
[ 143 ]��-�English�-� Word 2024-11-19 [09:14]� 37'104� bytes
[ 142 ] 2024-11-18 WP 6A � Liaison statement to Working Party 7C (copy to Working Parties 3L, 3M, 4C, 5A, 5B, 5C, 5D, 7B and 7D) - WRC-27 agenda item 1.17 � AI1.17 �
[ 142 ]��-�English�-� Word 2024-11-19 [09:04]� 39'070� bytes
[ 141 ] 2024-11-12 WP 4C � Reply liaison statement to Working Party 5C (copy to Working Parties 4A, 4B, 5A, 5B, 7C and 7D for information) - Studies under WRC-27 agenda item 1.10 � N/A �
[ 141 ]��-�English�-� Word 2024-11-12 [11:44]� 33'429� bytes
[ 136 ] 2024-10-22 WP 4C � Reply liaison statement to Working Party 7B (copy to Working Parties 3L, 3M, 4A, 4B, 5A, 5B, 5C, 5D, 7C and 7D) - WRC-27 agenda item 1.11 � AI1.11 �
[ 136 ]��-�English�-� Word 2024-10-22 [11:12]� 36'737� bytes
[ 140 ] 2024-11-08 WP 4A � Reply liaison statement to Working Party 7D - Relevant technical information to support studies under WRC-27 agenda item 1.16 documenting FSS characteristics in some frequency bands - WRC-27 agenda item 1.16 � AI1.16 �
[ 140 ]��-�English�-� Word 2024-11-08 [14:59]� 37'877� bytes
[ 139 ] 2024-11-08 WP 4A � Reply liaison statement to Working Parties 7C and 7D on agenda item 1.18 - WRC-27 agenda item 1.18 � AI1.18 �
[ 139 ]��-�English�-� Word 2024-11-08 [14:09]� 51'858� bytes
[ 138 ] 2024-11-07 WP 4A � Reply liaison statement to Working Parties 3J, 3K and 3M (copy to Working Parties 5A, 5B, 5C, 5D, 7C and 7D for information) - Information to support studies under WRC-27 agenda item 1.1 � AI1.1 �
[ 138 ]��-�English�-� Word 2024-11-07 [14:19]� 36'117� bytes
[ 137 ] 2024-10-22 WP 4C � Reply liaison statement to Working Party 5B (copy for information to Working Parties 4A, 5A, 5C, 7C and 7D) - Relevant technical information to support studies in preparation of WRC-27 agenda item 1.8 � AI1.8 �
[ 137 ]��-�English�-� Word 2024-10-22 [11:29]� 32'646� bytes
[ 135 ] 2024-10-22 WP 4C � Reply liaison statement to Working Parties 3L, 3M, 4A, 4B, 5A, 5B, 5C, 6A, 7B, 7C and 7D (copy to Working Party 5D) - WRC-27 agenda item 1.13 � AI1.13 �
[ 135 ]��-�English�-� Word 2024-10-22 [10:52]� 42'757� bytes
[ 134 ] 2024-10-15 WP 5D � Reply liaison statement to Working Party 7D - WRC-27 agenda item 1.16 � AI1.16 �
[ 134 ]��-�English�-� Word 2024-10-15 [14:19]� 35'712� bytes
[ 128 ] 2024-09-26 Acting Chair, WP 7D � Report of the meeting of Working Party 7D (Almaty, Kazakhstan, 17-26 September 2024) � N/A �
[ 128 ]��-�English�-� Word 2024-10-22 [14:32]� 84'428� bytes Report on the September 2024 meeting of Working Party 7D - (Almaty, Kazakhstan, with online participation, 17-25 September 2024) �
[ 128 ]�Annex 19�-�English�-� Word 2024-10-11 [11:34]� 48'548� bytes List of output (TEMP) documents (Documents 7D/TEMP/25 - 7D/TEMP/54) �
[ 128 ]�Annex 17�-�English�-� Word 2024-10-03 [08:34]� 56'152� bytes Updates to working document towards a preliminary draft revision of Report ITU-R RA.2188-1 - Power flux-density and e.i.r.p. levels potentially damaging to radio astronomy receivers �
[ 128 ]�Annex 18�-�English�-� Word 2024-10-02 [15:04]� 15'728'751� bytes Working document towards a preliminary draft new Recommendation/Report ITU-R RA.[IMT-6GHZ] - Methods to address the determination of the protection area around existing RAS stations from IMT stations in the frequency band 6 650-6 675.2 MHz �
[ 128 ]�Annex 11�-�English�-� Word 2024-10-02 [14:20]� 587'051� bytes Elements for use in studies between the radio astronomy service (RAS) and active services above 71 GHz, and meta analysis of the studies �
[ 128 ]�Annex 15�-�English�-� Word 2024-10-02 [12:02]� 55'793� bytes Working document towards a preliminary draft revision of Recommendation ITU-R RA.479-5 - Protection of frequencies for radioastronomical measurements in the Shielded zone of the Moon �
[ 128 ]�Annex 16�-�English�-� Word 2024-10-02 [12:01]� 6'664'436� bytes Working document towards a preliminary draft new Report ITU-R RA.[UEMR] - Unintended electromagnetic radiation from space systems into RAS frequency bands �
[ 128 ]�Annex 13�-�English�-� Word 2024-10-02 [11:52]� 6'713'029� bytes Working document towards a preliminary draft revision of Report ITU-R RA.2126 - Techniques for mitigation of radio frequency interference in radio astronomy �
[ 128 ]�Annex 14�-�English�-� Word 2024-10-02 [11:49]� 2'060'420� bytes Working document towards a preliminary draft new Report ITU-R RA.[SZM] - Radio astronomy facilities on the Moon �
[ 128 ]�Annex 10�-�English�-� Word 2024-10-01 [17:08]� 46'878� bytes Working document towards a preliminary draft new Report ITU-R RA.[szm-freq] - Preferred frequency bands for radio astronomy facilities on the Moon �
[ 128 ]�Annex 12�-�English�-� Word 2024-10-01 [16:47]� 113'087� bytes Working document towards preliminary draft new Report ITU-R RA.[RECEIVER-RESILIENCE] - Resilience of radio astronomy receivers �
[ 128 ]�Annex 7�-�English�-� Word 2024-10-01 [16:33]� 195'829� bytes Working document toward a preliminary draft Revision of Recommendation ITU-R RA.1513 - Levels of data loss to radio astronomy observations and percentage of time criteria resulting from degradation by interference for frequency bands allocated to the radio astronomy service on a primary basis �
[ 128 ]�Annex 9�-�English�-� Word 2024-10-01 [16:12]� 149'785� bytes Working document towards a preliminary draft new ITU-R Report - Sharing above 71 GHz in response to Resolution 731 (Rev.WRC-23) �
[ 128 ]�Annex 8�-�English�-� Word 2024-10-01 [15:37]� 45'914� bytes Preliminary draft new Recommendation ITU-R RA.[GEOVLBI] - Guidance to administrations regarding geodetic very long baseline interferometry networks �
[ 128 ]�Annex 6�-�English�-� Word 2024-10-01 [15:30]� 63'750� bytes Working document toward preliminary draft revision of Recommendation ITU-R RA.1631 - Reference radio astronomy antenna pattern to be used for compatibility analyses between non-GSO systems and radio astronomy service stations based on the epfd concept �
[ 128 ]�Annex 4�-�English�-� Word 2024-10-01 [15:24]� 46'005� bytes Working document towards a preliminary draft new Report ITU-R [RAS-SAT 71-235 GHz] - Compatibility between RAS and active satellite services in the 71-235 GHz range �
[ 128 ]�Annex 5�-�English�-� Word 2024-10-01 [15:23]� 38'198� bytes Workplan proposal for WRC-27 agenda item 1.18 on resolves 2 of Resolution 712 (WRC-23) �
[ 128 ]�Annex 3�-�English�-� Word 2024-10-01 [14:54]� 37'583� bytes Workplan for WRC-27 agenda item 1.16 - Implementation of Resolution 681 (WRC-23) �
[ 128 ]�Annex 2�-�English�-� Word 2024-10-01 [14:53]� 39'374� bytes Working document towards a preliminary draft new [Recommendation/Report/Resolution] [IRQZ] - [International Radio Quiet Zones on Earth] �
[ 128 ]�Annex 1�-�English�-� Word 2024-10-01 [14:51]� 991'403� bytes Working document towards a preliminary draft new Report ITU-R RA.[NGSO-RAS-RQZ] - Coexistence Measures between non-GSO satellite systems and RAS stations in the Radio Quiet Zones supporting the Square Kilometre Array (SKA) and the Atacama Large Millimeter/submillimeter Array (ALMA) �
[ 133 ] 2024-09-19 Scientific Committee on Frequency Allocations for Radio Astronomy and Space Science (IUCAF) � Accumulation of 2% data losses in the frequency band 15.35-15.4 GHz that is allocated to radio astronomy and other passive services on a primary basis and subject to RR No. 5.340 (copy to Working Party 7D) � AI1.7 �
[ 133 ]��-�English�-� Word 2024-10-09 [13:47]� 44'967� bytes
[ 132 ] 2024-10-01 WP 7C � Liaison statement to Working Party 5B (copy to Working Parties 3J, 3K, 3M, 4A, 4C, 5A, 5C and 7D for information) - Additional information on passive sensors in the EESS for WRC-27 agenda item 1.8 � AI1.8 �
[ 132 ]��-�English�-� Word 2024-10-01 [11:13]� 47'243� bytes
Results: 37 total items.
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages Yes
Formats doc pdf zip �+�Other formats
Languages (maximum 2) E F S A C R �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2024-12-13