International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-T : SG 11 : Meeting Documents� Recently posted�-� Search Meeting Documents
ITU-T�SG 11� ALL�(2021-07-15)�

ITU-T�SG 11

Protocols and test specifications

Study Period 2017

Meeting� from 2021-07-15 to 2021-07-16

held in E-Meeting

Collective Letters��Documents / Contributions

Number
Title Source AI/Question
Date
[ 15 ]
Virtual meeting of Working Parties 1/11, 2/11 and 3/11, 15-16 July 2021 � ITU-T SG11 2021-04-14

Contributions��Documents / Contributions

Number
Title Source AI/Question
Date
[ 618 ]

Withdrawn by submitter
N/A � 2021-06-23
[ 617 ]

Withdrawn by submitter
N/A � 2021-06-23
[ 616 ]

Withdrawn by submitter
N/A � 2021-06-22
[ 615 ]

Withdrawn by submitter
N/A � 2021-06-16

Temporary Documents��Documents / Contributions

Number
Title Source AI/Question
Date
[ 114-WP1 ]
New work items (WP1/11 virtual meeting, 16 July 2021) � TSB Q5/11, Q4/11, Q3/11, Q2/11, Q1/11 2021-07-14
[ 113-WP1 ]
Output - baseline text for a new work item Technical Report TR-NCDP "Session layer network coding protocol for multicast data transmission" (e-meeting, 7-16 July 2021) � Editors Q2/11 2021-07-14
[ 112-WP1 ]
Output - baseline text for a new work item Q.QKDN_profr "Quantum key distribution networks - Protocol framework" (e-meeting, 7-16 July 2021) � Editors Q2/11 2021-07-14
[ 111-WP1 ]
Output - draft new Recommendation ITU-T Q.PRO-Trust: "Signalling procedures and protocols for enabling interconnection between trustable network entities in support of existing and emerging networks" (e-meeting, 7-16 July 2021) � Editors Q2/11 2021-07-14
[ 110-WP1 ]
Output - draft Recommendation ITU-T Q.IMT2020-SAO: "Requirement, framework and protocols for signalling network analyses and optimization in IMT-2020" (e-meeting, 7-16 July 2021) � Editors Q2/11 2021-07-14
Currently viewing 5 of 114� documents related to this meeting (more...)

Reports��Documents / Contributions

Number
Title Source AI/Question
Date
[ 49 ]
(Rev.1)
Report of Working Party 3/11 "Conformance and interoperability testing" (virtual, 16 July 2021) � ITU-T Study Group 11 Q16/11, Q14/11, Q13/11, Q12/11 2021-04-14
[ 48 ]
Report of Working Party 2/11 "Control and management protocols for IMT-2020" (virtual, 15 July 2021) � ITU-T Study Group 11 Q8/11, Q7/11, Q6/11 2021-04-14
[ 47 ]
Report of Working Party 1/11 "Signalling requirements and protocols for emerging telecommunications networks" (virtual, 16 July 2021) � ITU-T Study Group 11 Q5/11, Q4/11, Q3/11, Q2/11, Q1/11 2021-04-14

Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� TSB EDH
Updated :�2025-1-25