International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-T : SG 9 : Meeting Documents� Recently posted�-� Search Meeting Documents
ITU-T�SG 9� ALL�(2021-01-26)�

ITU-T�SG 9

Broadband cable and TV

Study Period 2017

Meeting� from 2021-01-26 to 2021-01-26

held in E-Meeting

Collective Letters��Documents / Contributions

Number
Title Source AI/Question
Date
[ 8 ]
Meeting of Working Party 1/9; fully virtual meeting, 26 January 2021 (0900 to 1030 hours) � TSB Q4/9, Q2/9, Q1/9 2020-11-17

Contributions��Documents / Contributions

Number
Title Source AI/Question
Date
[ 152 ]
(Rev.1)
Proposal to consent draft new Recommendation J.rfip-switching-req "Requirements of RF/IP switching system" � Japan Cable Laboratories Q1/9 2021-01-13
[ 151 ]
(Rev.1)
Proposal to consent draft new Recommendation J.cable-rf-ip "Requirements of cable network for RF and IP secondary distribution of television programmes" � Japan Cable Laboratories Q1/9 2021-01-12

Temporary Documents��Documents / Contributions

Number
Title Source AI/Question
Date
[ 987-GEN ]
(Rev.1)
LS/o on AAP Consent of draft new Recommendation ITU-T J.481 (ex J.cable-rf-ip) and J.482 (ex J.rfip-switching-req) [to ETSI TC Cable, ITU-T Q13/SG16, CableLabs, SCTE] � Rapporteur Q1/9 Q1/9 2021-01-21
[ 986-GEN ]
LS/o/r on start of new draft Recommendations J.rfip-switching "RF/IP adaptive video distribution scheme over cable television networks" (reply to SG16-LS195) [to ITU-T SG16] � Rapporteur Q1/9 Q1/9 2021-01-21
[ 985-GEN ]
LS/o/r on the current text of new draft Recommendations J.cable-rf-ip "Requirements of cable network for RF and IP secondary distribution of television programmes" (reply to SG16-LS196) [to ITU-T SG16] � Rapporteur Q1/9 Q1/9 2021-01-21
[ 984-GEN ]
LS/o on withdrawal of IEEE Std 802.1D-2004 [to CableLabs] � Rapporteur Q1/9 Q1/9 2021-01-21
[ 983-GEN ]
Output - draft new Recommendation ITU-T J.rfip-switching-arch "Architecture and functional specification of RF/IP switching system" (E-meeting, 20 January 2021) � Editor J.rfip-switching-arch Q1/9 2021-01-21
Currently viewing 5 of 25� documents related to this meeting (more...)

Reports��Documents / Contributions

Number
Title Source AI/Question
Date
[ 21 ]
Report of Working Party 1/9 meeting (E-meeting, 26 January 2021) � Acting Chairman WP1/9 Q4/9, Q2/9, Q1/9 2021-01-27

Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� TSB EDH
Updated :�2025-1-9