International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-T : SG 5 : Meeting�2018-09-11�: Contributions� Recently posted�-� Search Meeting Documents
ITU-T�SG 5� C�(2018-09-11)�

ITU-T�SG 5

Environment, climate change and circular economy

Study Period 2017

Meeting� from 2018-09-11 to 2018-09-21

held in Switzerland [Geneva]

Other Meetings : 2021-11-302021-05-112020-10-192020-05-112019-09-162019-05-132018-05-212018-03-052017-11-132017-05-15

Results:132 total items.
Result page:� 1 - 2 - 3 �-�Next Next
Contributions��Documents / Contributions

Number
Title Source AI/Question
Date
[ 409 ]
New versions v 8.32 and 8.64 of the software "EMF-estimator" � National Institute of Telecommunications (Poland) , Orange Polska S.A. (Poland) Q3/5 2018-08-30
[ 408 ]
Baseline document L.EW 2020 Guideline on Implementing the E-waste Reduction Target of the Connect2020 Agenda � Argentina , Egypt , Huawei Technologies Co., Ltd. (China) Q7/5 2018-08-30
[ 407 ]
Proposed table of content for a proposed new work item on "A methodology for improving, assessing and scoring the sustainability performance of office buildings" � MJRD Assessment Inc. (Canada) Q6/5 2018-08-30
[ 406 ]
Proposed new work item on draft Recommendation ITU-T L.xxx on A Methodology for improving, assessing and scoring the sustainability performance of office buildings � MJRD Assessment Inc. (Canada) Q6/5 2018-08-30
[ 405 ]
Proposed baseline text for proposed new draft Recommendation ITU-T K.Workers_safety � Wavecontrol, S.L. (Spain) Q3/5 2018-08-30
[ 404 ]
Proposed input to draft recommendation L.CEM Criteria for evaluation of the environmental impact of mobile phones by Apple, Huawei and BRS during the interim period May- September 2018 � Egypt Q7/5 2018-08-30
[ 403 ]
BRS's additions to the draft L.EW Connect 2020 during the Interim period May- September 2018 � Egypt Q7/5 2018-08-30
[ 402 ]
Baseline document for draft Recommendation ITU-T L.ER Guidelines and Certification schemes for e- Waste Recyclers � Egypt Q7/5 2018-08-30
[ 401 ]
(Rev.1)
Proposed draft for L.ENST2 based on ETSI version and e-meetings � Orange Q6/5 2018-08-29
[ 400 ]
(Rev.1)
Proposal of new work item on Carbon Neutrality for organisations in the ICT sector � Orange Q9/5 2018-08-29
[ 399 ]
(Rev.1)
Proposal of new work item : rare metals criticality index � Orange Q9/5 2018-08-29
[ 398 ]
(Rev.1)
Proposal of new work item on the impact of ICT on biodiversity � Orange Q9/5 2018-08-29
[ 397 ]
(Rev.1)
Proposal of new work item TCFD � Orange Q9/5 2018-08-29
[ 396 ]
(Rev.1)
Proposal of a new work item, Supplement on ICT sector 2 degrees trajectory � Orange Q9/5 2018-08-29
[ 395 ]
(Rev.1)
Complement to L.MAE, a 2 degrees scenario for network operators � Orange Q9/5 2018-08-29
[ 394 ]
Variants of IEEE 802.3 Ethernet Standard implementations � Bourns Limited Q2/5 2018-08-29
[ 393 ]
L.MAAP: Information regarding a new study on the relation between CO2 emissions of countries and their ICT maturity � Telefon AB - LM Ericsson (Sweden) Q9/5 2018-08-29
[ 392 ]
L.MAAP: Principles and proposed content � Telefon AB - LM Ericsson (Sweden) Q9/5 2018-08-29
[ 391 ]
L.1450 next steps: A trajectory for the ICT sector for 2030 in line with Carbon Law � Telefon AB - LM Ericsson (Sweden) Q9/5 2018-08-29
[ 390 ]
Circular Economy related policy and standardization - the case of Europe � Telefon AB - LM Ericsson (Sweden) Q7/5 2018-08-29
[ 389 ]
(Rev.1)
L.1450, L.1410: Application of Recommendations in new study on the global Energy and Carbon Footprints of the ICT sector � Telefon AB - LM Ericsson (Sweden) Q9/5, Q6/5 2018-08-29
[ 388 ]
(Rev.1)
Proposed new work item on draft Recommendation ITU T L.ICT_CE "ICT response to circular economy � Communications Authority of Kenya (CA) , Argentina , Huawei Technologies Co., Ltd. , Spain , Telecommunications and Post Regulatory Authority (Sudan) , Uganda Communications Commission (UCC) Q9/5, Q7/5, Q6/5 2018-08-29
[ 387 ]
(Rev.1)
Proposed new work item on draft new Recommendation ITU T L.Env_KPI_network-arch "Environmental KPI for network architecture � Argentina , Huawei Technologies Co., Ltd. , Telecommunications and Post Regulatory Authority (Sudan) Q9/5, Q7/5, Q6/5 2018-08-29
[ 386 ]
MOV terms - Annotated IEC 61051-1 ed. 3 review � Bourns Limited Q2/5 2018-08-29
[ 385 ]
(Rev.1)
Electro Magnetic Field from Mobile Communications Base stations - Monitoring, Compliance and Public Awareness Mechanism. � India , Ministry of Communications Q3/5 2018-08-29
[ 384 ]
(Rev.1)
5G EMF Survey at the 5G Innovation Centre, Southport Australia � Telefon AB - LM Ericsson (Sweden) , Telstra Corporation Ltd. Q3/5 2018-08-29
[ 383 ]
(Rev.1)
ITU-T K91. Suppl. 4 (10/2015) - Electromagnetic field considerations in smart sustainable cities - 5G update � GSMA , Telstra Corporation Ltd. Q3/5 2018-08-29
[ 382 ]
(Rev.1)
K.Supp-5G - Radiofrequency Electromagnetic field (RF-EMF) compliance assessments for 5G wireless networks � Telefon AB - LM Ericsson (Sweden) , Nokia Corporation (Finland) , Telstra Corporation Ltd. Q3/5 2018-08-29
[ 381 ]
(Rev.1)
The 3rd Draft new Recommendation ITU-T K.wire-line_emc � Huawei Technologies Co., Ltd. Q4/5 2018-08-29
[ 380 ]
Added the requirements for SSI powered by up to 400V IT d.c. system in ITU-T K.psp � Huawei Technologies Co., Ltd. Q1/5 2018-08-29
[ 379 ]
Some revision suggestions for ITU-T K.psp "Protection of small-size telecommunication installations with poor earthing conditions" � Huawei Technologies Co., Ltd. Q1/5 2018-08-29
[ 378 ]
The fifth draft of K.psp "Protection of small-size telecommunication installations with poor earthing conditions" � China Unicom Q1/5 2018-08-29
[ 377 ]
(Rev.1)
Comments and proposed changes to K.44 � Cisco Systems, Inc. Q2/5 2018-08-28
[ 376 ]
(Rev.1)
ITU-T Rec. L.1310 (07/2017) Energy efficiency metrics and measurement methods for telecommunication equipment �
Huawei Technologies Co., Ltd. , Telefon AB - LM Ericsson (Sweden) Q6/5 2018-08-28
[ 375 ]
(Rev.1)
L.1310, "Energy efficiency metrics and measurement methods for telecommunication equipment", Proposed updates on definition of energy efficiency metrics and test methodologies for wireless access technologies � Huawei Technologies Co., Ltd. , Telefon AB - LM Ericsson (Sweden) Q6/5 2018-08-28
[ 374 ]
Proposal for a new work item on Supplement to K.45 "Technical rationale of resistibility of telecommunication equipment installed in the access and trunk networks against lightning" � Nippon Telegraph and Telephone Corporation (NTT) Q2/5 2018-08-28
[ 373 ]
Proposal for a new work item on Supplement to K.20 "Technical rationale of resistibility of telecommunication equipment installed in a telecommunication centre against lightning" � Nippon Telegraph and Telephone Corporation (NTT) Q2/5 2018-08-28
[ 372 ]
Proposal for a new work item on Supplement to K.21 "Technical rationale of resistibility of telecommunication equipment installed in customer premises against lightning" � Nippon Telegraph and Telephone Corporation (NTT) Q2/5 2018-08-28
[ 371 ]
(Rev.1-2)
Re-comments on TD523 and draft K.vss � Nippon Telegraph and Telephone Corporation (NTT) Q1/5 2018-08-28
[ 370 ]
(Rev.1)
Recommendation ITU-T L.GAL2 - Interface for power management in NFV environments "Green Abstraction Layer 2" � Orange (France) , Consorzio Nazionale Interuniversitario per le Telecomunicazioni CNIT (Italy) Q6/5 2018-08-28
[ 369 ]
(Rev.1)
EMF extrapolation method of 5G radio stations for compliance assessment � Korea (Rep. of) Q3/5 2018-08-28
[ 368 ]
(Rev.1)
EMF level monitoring and information platform for various radio stations � Korea (Rep. of) Q3/5 2018-08-28
[ 367 ]
Introduction on the RF EMF warning signage applied in Korea � Korea (Rep. of) Q3/5 2018-08-28
[ 366 ]
(Rev.1)
K.52 "Guidance on complying with limits for human exposure to electromagnetic fields": New version of the software K.52 calculator � Orange Polska S.A. Q3/5 2018-08-28
[ 365 ]
Comparison of the exclusion zones in front of the mobile base station antennas caused by the different RF EMF exposure limits � Orange Polska S.A. Q3/5 2018-08-28
[ 364 ]
(Rev.1-2)
Evaluation of the EMF strength for verifying the compliance with guidelines inside the subway train � Korea (Rep. of) , Electronics and Telecommunications Research Institute (ETRI) (Korea (Rep. of)) Q3/5 2018-08-28
[ 363 ]
Comparison of measurement and numerical prediction results of EMF strength in the vicinity of radiocommunication stations � Korea (Rep. of) Q3/5 2018-08-28
[ 362 ]
Proposal of updating L.green_mgm_DC with a control function � Korea (Rep. of) Q6/5 2018-08-28
[ 361 ]
Proposed third draft of new Recommendation K.spdsafe "Guidance on safety relating to the use of surge protective devices and surge protective components in telecommunication terminal equipment" � Nippon Telegraph and Telephone Corporation (NTT) (Japan) Q2/5 2018-08-28
[ 360 ]
Comments on earthing conditions of power feeding systems in K.20, K.21 and K.44 � Nippon Telegraph and Telephone Corporation (NTT) (Japan) Q2/5 2018-08-28
Results:132 total items.
Result page:� 1 - 2 - 3 �-�Next Next
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� TSB EDH
Updated :�2025-1-10