International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-T : SG05 : Meeting�2009-05-25�: Contributions� Recently posted�-� Search Meeting Documents
ITU-T�SG05� C�(2009-05-25)�

ITU-T�SG05

ICT and climate change

Study Period 2009

Meeting� from 2009-05-25 to 2009-05-29

held in Switzerland [Geneva]

Other Meetings : 2012-10-082012-04-112011-09-202011-04-272010-11-232010-10-012010-04-122010-01-192009-10-122008-11-24

Results:22 total items.
Contributions��Documents / Contributions

Number
Title Source AI/Question
Date
[ 39 ]
Comments and suggestions for an automatic long term EMF measurement system � Swisscom Ltd. Q3/5 2009-05-19
[ 38 ]
Draft Revision of Rec. K.30rev/K.ocp � Bourns Inc. Q13/5 2009-05-19
[ 37 ]
Proposed new question and their related Study Groups on 'Energy Saving Requirements for ICTs over the lifecycle' � BT , FT , Telecom Italia QALL/5 2009-05-15
[ 36 ]
Proposed new question and their related Study Groups on 'ICTs for GHG abatement in buildings' � BT QALL/5 2009-05-15
[ 35 ]
Proposed new question and their related Study Groups on 'ICTs for GHG reduction by travel substitution' � BT QALL/5 2009-05-15
[ 34 ]
Proposed new question and related Study Groups on 'Technologies for Carbon Labelling over the Lifecycle" � BT , NSN Germany QALL/5 2009-05-15
[ 33 ]
Determination of Relevant Measurement Points � ANATEL, Brazil Q3/5 2009-05-15
[ 32 ]
Inputs from Brazil to K.Guide � ANATEL, Brazil Q3/5 2009-05-15
[ 31 ]
Working document toward draft new Recommendation K.guide � Telekomunikacja Polska, Poland Q3/5 2009-05-14
[ 30 ]
Editorial errors in ITU-T Recommendation K.52 � Telekomunikacja Polska, Poland Q3/5 2009-05-14
[ 29 ]
Comparison between measurement and calculations of the EMF � Telekomunikacja Polska, Poland Q3/5 2009-05-14
[ 28 ]
A proposal on the structure of a new WP for climate change issues � Republic of Korea QALL/5 2009-05-14
[ 27 ]
Field experiments to confirm the error rate by deviated potential probe positioning in the fall-of-potential earth resistance measurement method � Republic of Korea Q6/5 2009-05-14
[ 26 ]
Test results on conductive coupling effects when measure induced voltage on telecommunication line near a.c. traction line with AT feeding system in Korea � KT, Korea Q9/5 2009-05-14
[ 25 ]
Proposal of measurement time reduction for exposure assessment � Republic of Korea Q3/5 2009-05-14
[ 24 ]
Proposed new questions and their related Study Groups on ICT and Climate Change � NTT , BT , FT , Fujitsu QALL/5 2009-05-14
[ 23 ]
Proposed test condition for PTN immunity test � ZTE Corporation Q12/5 2009-05-14
[ 22 ]
Proposal for Recommendation K.guide: Calculation and measurements for exposure assessment of adaptive antennas � China Mobile Communications Corp. Q3/5 2009-05-14
[ 21 ]
Conducted electromagnetic environment research in home networking � MIIT, China Q8/5 2009-05-14
[ 20 ]
Test results of "Broadband impulsive conducted disturbances" � CIAJ Q8/5 2009-05-14
[ 19 ]
Measurement time for EMF exposure assessment � Thailand Q3/5 2009-05-14
[ 18 ]
Automatic Long Term EMF Measurement System � Germany Q3/5 2009-04-08
Results:22 total items.
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� TSB EDH
Updated :�2025-2-19