Delayed Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 49 ]
�
� |
New Study Issues about Impact of network based RFID and WSN on NGN
�
� |
ETRI (Electronics and Telecommunications Research Institute)
� |
ALL/11
� |
2005-04-21 |
|
[ 48 ]
�
� |
Proposed Amendment 1 to ITU-T Recommendation Q.2630.3 AAL Type 2 Signalling Protocol (Capability Set 3)
�
� |
United States of America
� |
4/11, 3/11
� |
2005-04-21 |
|
[ 47 ]
�
� |
Proposed Amendment 5 to ITU-T Recommendation Q.2931
�
� |
United States of America
� |
4/11, 3/11
� |
2005-04-21 |
|
[ 46 ]
�
� |
Proposed Changes to TRQ Q.IEPS
�
� |
United States of America
� |
4/11, 3/11
� |
2005-04-21 |
|
[ 45 ]
�
� |
Documentation and Approval for IEPS Phase 2 Protocol Enhancements
�
� |
United States of America
� |
4/11, 3/11
� |
2005-04-21 |
|
[ 44 ]
�
� |
Consideration on the proposal of D15 "Network Interconnection Using SIP"
�
� |
NTT Comware Corporation
� |
3/11
� |
2005-04-20 |
|
[ 43 ]
�
� |
NCI protocol identification and proposal
�
� |
CATR of MII, China Mobile, Siemens
� |
5/11
� |
2005-04-20 |
|
[ 42 ]
�
� |
CCI protocol evaluation and proposal
�
� |
Ministry of Information Industry, People's Republic of China
� |
5/11
� |
2005-04-20 |
|
[ 41 ]
�
� |
SCI protocol evaluation and proposal
�
� |
Ministry of Information Industry, People's Republic of China
� |
5/11
� |
2005-04-20 |
|
[ 40 ]
�
� |
Proposal to initiate a SG 11 work item to develop discovery protocol for Network Attachment Control and Signalling Requirements in NGN environment
�
� |
Korea (Republic of)
� |
7/11
� |
2005-04-20 |
|
[ 39 ]
�
� |
Proposed initiation of a Q.7/11 work item to develop Network Attachment Control and Signalling Requirements for Emerging Access Technologies
�
� |
Korea (Republic of)
� |
7/11
� |
2005-04-20 |
|
[ 38 ]
�
� |
Proposed initiation of a Q.7/11 work item to develop Network Access Security Aspect in Attachment Control and Signalling
�
� |
Korea (Republic of)
� |
7/11
� |
2005-04-20 |
|
[ 37 ]
�
� |
Proposed initiation of a Q.7/11 work item to develop Signalling Requirement and Architecture of Network Attachment Control.
�
� |
Korea (Republic of)
� |
7/11
� |
2005-04-20 |
|
[ 36 ]
�
� |
Alternative Proposals for IPv4/v6 Support in BICC
�
� |
LM Ericsson
� |
4/11, 3/11
� |
2005-04-20 |
|
[ 35 ]
�
� |
Draft New Q.1950 Annex G for IEPS BICC calls
�
� |
LM Ericsson
� |
4/11, 3/11
� |
2005-04-20 |
|
[ 34 ]
�
� |
ATM Virtual Trunks for MPLS control plane interworking
�
� |
United States of America
� |
4/11
� |
2005-04-19 |
|
[ 33 ]
�
� |
Reference Model for MPLS control plane interworking
�
� |
United States of America
� |
4/11
� |
2005-04-19 |
|
[ 32 ]
�
� |
Proposed work item on MPLS control plane interworking (mplscpi)
�
� |
United States of America
� |
4/11
� |
2005-04-19 |
|
[ 31 ]
�
� |
NGN Directory Interworking Framework
�
� |
VeriSign, Inc.
� |
5/11, 2/11, 1/11
� |
2005-04-19 |
|
[ 30 ]
�
� |
Questions/points for clarification TRQ.ncap2
�
� |
Siemens
� |
5/11
� |
2005-04-19 |
|
[ 29 ]
�
� |
Request for enhancement of ISUP/BICC to support the control of voice enhancement
�
� |
Siemens
� |
3/11
� |
2005-04-19 |
|
[ 28 ]
�
� |
Proposal to solicit additional guidance from SG 12 re: Y.1541
�
� |
Nortel Networks (Canada)
� |
3/11
� |
2005-04-15 |
|
[ 27 ]
�
� |
Conformance Tests for the "Interworking between H.225 and ISDN User Part functions and protocol of Signaling System No. 7." (H.246 Annex C)
�
� |
Telekom Austria AG
� |
8/11
� |
2005-04-15 |
|
[ 26 ]
�
� |
Conformance Tests for the "Interworking between Session Initiation Protocol (SIP) and Bearer Independent Call Control Protocol or ISDN User Part" (Q.1912.5)
�
� |
Telekom Austria AG
� |
8/11
� |
2005-04-15 |
|
[ 25 ]
�
� |
Future of the Focus group on NGN
�
� |
France
� |
ALL/11
� |
2005-04-14 |
|
[ 24 ]
�
� |
Draft new Recommendation Q.tt1 "Methods of testing and model network architecture for NGN technical means testing as applied to public telecommunication networks"
�
� |
Telecommunication Administration of the Russian Federation
� |
8/11
� |
2005-04-11 |
|
[ 23 ]
�
� |
Recommendations on the modernization of rural telephone networks on the basis of using SIP-Technologies
�
� |
Telecommunication Administration of the Russian Federation
� |
6/11
� |
2005-04-11 |
|
[ 22 ]
�
� |
Future of NGN FG
�
� |
Australia
� |
ALL/11
� |
2005-04-11 |
|
[ 21 ]
�
� |
Proposal to initiate a SG 11 work item to develop Interworking Requirements to support Q.1980.1
�
� |
Nortel Networks (Canada)
� |
3/11
� |
2005-04-11 |
|
[ 20 ]
�
� |
Review of Q.1980.1 from a security point of view
�
� |
Nortel Networks (Canada)
� |
3/11
� |
2005-04-11 |
|
[ 19 ]
�
� |
Obligations Resulting from WTSA-04 Resolution 50
�
� |
Canada
� |
ALL/11
� |
2005-04-11 |
|
[ 18 ]
�
� |
Proposed template for draft Recommendation Y-MPLS control plane interworking
�
� |
Nortel Networks (Canada)
� |
4/11
� |
2005-04-11 |
|
[ 17 ]
�
� |
Proposal to extend the current suite of Y-MPLS interworking documents
�
� |
Canada
� |
4/11
� |
2005-04-11 |
|
[ 16 ]
�
� |
See Contribution no.2
�
� |
N/A
� |
ALL/11
� |
2005-02-16 |
Results:34 total items.
� |
Multiple Document Download:�Formats and Languages to be included (when available):