Number� |
Date
|
Source
|
Title
|
� |
Number� |
Posted |
Size
|
� |
� |
[ 109 ]�
|
2024-12-11 |
WP 5A
� |
Liaison statement to Working Parties 1B, 5C and 6A - Working document towards a preliminary draft new Report ITU-R M.[AUDIO-PMSE_LMS]
�
� |
�
|
[ 109 ]��-�English�-� Word |
2024-12-11 [10:47]�
|
47'194� bytes |
� |
� |
[ 107 ]�
|
2024-11-13 |
Acting Chair, WP 6A
� |
Report of the meeting of Working Party 6A (Geneva, 4-16 November 2024)
�
� |
�
|
[ 107 ]�Chapter 5�-�English�-� Word |
2024-12-10 [10:24]�
|
49'726� bytes |
Meeting report from Sub-Working Group 6A-5 (Other issues)
� |
�
|
[ 107 ]�Chapter 1�-�English�-� Word |
2024-12-09 [15:35]�
|
69'459� bytes |
Meeting Report from Sub-Working Group 6A-1 (Television)
� |
�
|
[ 107 ]�Part 2�-�English�-� Word |
2024-12-09 [15:08]�
|
34'695� bytes |
� |
�
|
[ 107 ]�Part 1�-�English�-� Word |
2024-12-09 [15:08]�
|
42'813� bytes |
� |
�
|
[ 107 ]��-�English�-� Word |
2024-12-09 [15:08]�
|
123'719� bytes |
Report of the meeting of Working Party 6A (Geneva, 5 - 13 November 2024)
� |
�
|
[ 107 ]�Chapter 3�-�English�-� Word |
2024-12-09 [14:57]�
|
57'790� bytes |
Meeting Report from Sub-Working Group 6A-3 (WRC-27 agenda items and sharing)
� |
�
|
[ 107 ]�Chapter 4�-�English�-� Word |
2024-12-09 [14:38]�
|
42'089� bytes |
Meeting report from Sub-Working Group 6A-4 (Protection)
� |
�
|
[ 107 ]�Chapter 2�-�English�-� Word |
2024-12-09 [12:18]�
|
50'330� bytes |
Meeting Report from Sub-Working Group 6A-2 "Sound and Multimedia"
� |
�
|
[ 107 ]�Chapter 1 - Annex 5�-�English�-� Word |
2024-11-27 [09:24]�
|
38'452� bytes |
Terms of Reference for a Working Party 6A Rapporteur Group to review Study Group 6 documentation on digital terrestrial broadcasting systems - "DTB Doc review"
� |
�
|
[ 107 ]�Chapter 3 - Annex 11�-�English�-� Word |
2024-11-19 [16:50]�
|
38'075� bytes |
Continuation of Rapporteur Group to undertake WRC-27 studies related to Working Party 6A
� |
�
|
[ 107 ]�Chapter 2 - Annex 10�-�English�-� Word |
2024-11-19 [16:35]�
|
21'088'701� bytes |
Working document towards a preliminary draft revision of Report ITU-R BS.2384 - Implementation considerations for the introduction and transition to digital terrestrial sound and multimedia broadcasting
� |
�
|
[ 107 ]�Chapter 2 - Annex 9 - Part 1�-�English�-� Word |
2024-11-19 [13:52]�
|
9'123'691� bytes |
� |
�
|
[ 107 ]�Chapter 2 - Annex 9�-�English�-� Word |
2024-11-19 [13:49]�
|
11'481'409� bytes |
Working document towards a preliminary draft revision of ITU-R Handbook - HF broadcasting system design
� |
�
|
[ 107 ]�Chapter 2 - Annex 8�-�English�-� Word |
2024-11-19 [11:56]�
|
43'488� bytes |
Preliminary draft revision of Recommendation ITU-R BS.1114-12 - Systems for terrestrial digital sound broadcasting to vehicular, portable and fixed receivers in the frequency range 30-3 000 MHz
� |
�
|
[ 107 ]�Chapter 2 - Annex 7�-�English�-� Word |
2024-11-19 [11:46]�
|
135'089� bytes |
Preliminary draft revision of Recommendation ITU-R BS.1514 - System for digital sound broadcasting in the broadcasting bands below 30 MHz
� |
�
|
[ 107 ]�Chapter 2 - Annex 6�-�English�-� Word |
2024-11-19 [11:32]�
|
264'985� bytes |
Preliminary draft revision of Recommendation ITU-R BS.705 - HF transmitting and receiving antennas characteristics and diagrams
� |
�
|
[ 107 ]�Chapter 1 - Annex 1�-�English�-� Word |
2024-11-19 [11:14]�
|
26'934'613� bytes |
Preliminary draft new Report ITU-R BT.[NETWORK PLANNING TMMB-L] - Terrestrial multimedia mobile broadcasting System L network planning and evaluation
� |
�
|
[ 107 ]�Chapter 1 - Annex 4�-�English�-� Word |
2024-11-19 [11:00]�
|
93'931� bytes |
Working document towards preliminary draft revision of Recommendation ITU-R BT.1877-3 - Error-correction, data framing, modulation and emission methods and selection guidance for second generation digital terrestrial television broadcasting systems
� |
�
|
[ 107 ]�Chapter 1 - Annex 3�-�English�-� Word |
2024-11-19 [10:58]�
|
149'339� bytes |
Working document towards a preliminary draft revision of Report ITU-R BT.2295-4 - Digital terrestrial broadcasting systems
� |
�
|
[ 107 ]�Chapter 1 - Annex 2�-�English�-� Word |
2024-11-19 [10:54]�
|
12'389'347� bytes |
[Working document towards] Preliminary draft revision of Report ITU-R BT.2343-9 - Collection of field trials of ultra high definition television over digital terrestrial television broadcasting networks
� |
� |
[ 108 ]�
|
2024-11-27 |
ITU-D SG1 - Q3/1
� |
Liaison statement from ITU-D Study Group 1 Question 3/1 to ITU-T Study Groups, ITU-R Working Parties, APT ASTAP and ETSI - ITU-D Study Group 1 Question 3/1 - The use of telecommunications/ICTs for disaster risk reduction and management
�
� |
�
|
[ 108 ]��-�English�-� Word |
2024-11-27 [16:41]�
|
37'761� bytes |
� |
� |
[ 36 ]�
|
2024-03-01 |
Chair, SG 6
� |
Proposed organization of the work of Study Group 6
�
� |
�
|
[ 36 ]�Revision 4�-�English�-� Word |
2024-11-18 [11:05]�
|
36'158� bytes |
� |
� |
[ ADM�15 ]�
|
2024-11-13 |
SG 6, WPs 6A/6B/6C
� |
Provisional schedules of 2025/2026 meetings of Study Group 6 and its Working Parties
�
� |
�
|
[ ADM�15 ]��-�English�-� Word |
2024-11-13 [18:09]�
|
37'663� bytes |
� |
� |
[ 106 ]�
|
2024-11-13 |
Director, BR
� |
Final list of participants - Working Party 6A (Geneva, 4-16 November 2024)
�
� |
�
|
[ 106 ]��-�English�-� PDF (acrobat) |
2024-11-13 [17:25]�
|
144'810� bytes |
� |
� |
[ ADM�14 ]�
|
2024-11-13 |
Acting Chair, WP 6A
� |
Agenda for the Closing Plenary Meeting of Working Party 6A - Wednesday, from 1400 to 1515, 1545 to 1700 hours (Geneva time) (Physical meeting with remote participation) (Room H)
�
� |
�
|
[ ADM�14 ]��-�English�-� Word |
2024-11-13 [09:38]�
|
39'477� bytes |
� |
� |
[ ADM�9 ]�
|
2024-10-29 |
SG 6, WPs 6A, 6B & 6C
� |
Tentative schedule for Working Parties 6A, 6B and 6C, and Study Group 6
�
� |
�
|
[ ADM�9 ]�Revision 2�-�English�-� Word |
2024-11-11 [08:11]�
|
50'560� bytes |
� |
� |
[ 105 ]�
|
2024-11-08 |
WP 6C
� |
Reply liaison statement to ITU-R Working Party 6A (copy to ITU-R Working Party 6B)
�
� |
�
|
[ 105 ]��-�English�-� Word |
2024-11-08 [16:15]�
|
45'018� bytes |
� |
� |
[ ADM�13 ]�
|
2024-11-08 |
Acting Chair, WP 6A
� |
Draft agenda for the second Plenary meeting of Working Party 6A - Friday, 8 November 2024, 1045-1200 hours (Geneva time) (Physical meeting with remote participation) (Room C)
�
� |
�
|
[ ADM�13 ]��-�English�-� Word |
2024-11-08 [09:48]�
|
33'242� bytes |
� |
� |
[ ADM�12 ]�
|
2024-11-01 |
Acting Chair, WP 6A
� |
Work structure and assignment of documents
�
� |
�
|
[ ADM�12 ]�Revision 1�-�English�-� Word |
2024-11-05 [10:45]�
|
36'921� bytes |
� |
� |
[ 104 ]�
|
2024-11-04 |
BR, Study Groups Department
� |
List of documents issued (Documents 6A/40 - 6A/104)
�
� |
�
|
[ 104 ]��-�English�-� Word |
2024-11-04 [15:21]�
|
47'151� bytes |
� |
� |
[ INF�2 ]�
|
2024-07-05 |
Chair, SG 6
� |
Functions of the Study Group 6 Vice-Chairs and Working Parties Chairs
�
� |
�
|
[ INF�2 ]�Revision 1�-�English�-� Word |
2024-11-04 [08:40]�
|
53'276� bytes |
� |
� |
[ ADM�11 ]�
|
2024-11-01 |
Acting Chair, WP 6A
� |
Draft agenda for the first Plenary meeting of Working Party 6A - Tuesday, 5 November 2024, 0930 hours (Geneva time) (Physical meeting with remote participation) (Tower, Room C)
�
� |
�
|
[ ADM�11 ]��-�English�-� Word |
2024-11-01 [15:04]�
|
39'086� bytes |
� |
� |
[ 103 ]�
|
2024-11-01 |
RG on SAB/SAP Issues
� |
Report for Working Party 6A block meeting of November 2024
�
� |
�
|
[ 103 ]�Part 1�-�English�-� Excel 2007 |
2024-11-01 [10:44]�
|
68'718� bytes |
� |
�
|
[ 103 ]��-�English�-� Word |
2024-11-01 [10:44]�
|
563'028� bytes |
� |
� |
[ ADM�10 ]�
|
2024-10-31 |
Chair, SG 6
� |
Proposed treatment of contributions submitted to multiple Working Parties
�
� |
�
|
[ ADM�10 ]��-�English�-� Word |
2024-11-01 [13:26]�
|
41'641� bytes |
� |
Results: 36 total items.
� |
Multiple Document Download:�Formats and Languages to be included (when available):