Num�ro� |
Date
|
Source
|
Titre
|
Questions�
|
� |
Num�ro� |
Mise � disposition |
Taille
|
� |
� |
� |
[ 152 ]�
|
2024-11-28 |
Chair, WP 5C
� |
Report on the thirty first meeting of Working Party 5C (Geneva, 19-28 November 2024)
�
� |
N/A
� |
�
|
[ 152 ]��-�English�-�Word |
2025-01-02 [15:40]�
|
1'148'242� octets |
Report of the thirty first meeting of Working Party 5C (Geneva, 19-28 November 2024)
� |
�
|
[ 152 ]�Annex 3.4�-�English�-�Word |
2024-12-18 [08:31]�
|
41'410� octets |
Terms of Reference of the Working Party 5C Correspondence Group on developing a new version of the ITU Handbook on Digital Radio-Relay Systems
� |
�
|
[ 152 ]�Annex 5�-�English�-�Word |
2024-12-17 [09:09]�
|
1'108'875� octets |
General Matters - Summary of documents addressed
� |
�
|
[ 152 ]�Annex 3�-�English�-�Word |
2024-12-13 [14:30]�
|
56'053� octets |
Meeting Report of Working Group 5C-3 - General Aspects and HF Systems
� |
�
|
[ 152 ]�Annex 3.2�-�English�-�Word |
2024-12-13 [12:38]�
|
398'741� octets |
Preliminary draft revision to Recommendation ITU-R F.1762 - Characteristics of enhanced applications for high frequency (HF) radiocommunication systems
� |
�
|
[ 152 ]�Annex 2.4�-�English�-�Word |
2024-12-13 [11:08]�
|
177'318� octets |
Working document on sharing studies under agenda item 1.10
� |
�
|
[ 152 ]�Annex 2�-�English�-�Word |
2024-12-13 [10:14]�
|
59'688� octets |
Meeting Report of Working Group 5C-2 - Sharing, compatibility aspects and WRCs issues
� |
�
|
[ 152 ]�Annex 3.3�-�English�-�Word |
2024-12-13 [09:07]�
|
471'595� octets |
Preliminary draft revision of Recommendation ITU-R F.1821-0 - Characteristics of advanced digital high frequency (HF) diocommunication systems
� |
�
|
[ 152 ]�Annex 4�-�English�-�Word |
2024-12-13 [08:59]�
|
62'313� octets |
Detailed work plans for individual deliverables
� |
�
|
[ 152 ]�Annex 3.1�-�English�-�Word |
2024-12-13 [08:47]�
|
17'645'813� octets |
Preliminary draft revision to Recommendation ITU-R F.699-8 - Reference radiation patterns for fixed wireless system antennas for use in coordination studies and interference assessment in the frequency range from 100 MHz to 86 GHz
� |
�
|
[ 152 ]�Annex 2.2�-�English�-�Word |
2024-12-12 [16:56]�
|
2'526'779� octets |
Preliminary draft new Report ITU-R F.[EESS-PROTECTION] - Studies on unwanted emission levels outside the allocated bands for FS systems operating in frequency bands from 94.1 GHz to 174.8 GHz for the protection of EESS (passive) operating in adjacent bands where footnote RR No. 5.340 applies
� |
�
|
[ 152 ]�Annex 1.5�-�English�-�Word |
2024-12-12 [16:45]�
|
162'487� octets |
Working document towards a preliminary draft new Report ITU-R F.[FS.CHAR.450-1 000 GHZ] - Technical and operational characteristics of the fixed service applications operating in the frequency range 450-1 000 GHz
� |
�
|
[ 152 ]�Annex 2.3�-�English�-�Word |
2024-12-12 [16:14]�
|
5'921'034� octets |
Working document towards preliminary draft new Report ITU-R F.[SHARING_STUDY_FS_ARNS] - Coexistence study between airborne stations in the radionavigation service and stations in the fixed service in the band 31.8-33.4 GHz
� |
�
|
[ 152 ]�Annex 1�-�English�-�Word |
2024-12-12 [16:06]�
|
49'738� octets |
Meeting Report of Working Group 5C-1 - Spectrum, applications and technology aspects
� |
�
|
[ 152 ]�Annex 1.4�-�English�-�Word |
2024-12-12 [15:55]�
|
8'855'257� octets |
Working document towards a preliminary draft revision of Report ITU-R F.2323-2 - Fixed service use and future trends
� |
�
|
[ 152 ]�Annex 2.1�-�English�-�Word |
2024-12-12 [15:48]�
|
106'263� octets |
Working document towards preliminary draft revision of Recommendation ITU-R F.1571 - Mitigation techniques for use in reducing the potential for interference between airborne stations in the radionavigation service and stations in the fixed service in the band 31.8-33.4 GHz
� |
�
|
[ 152 ]�Annex 1.3�-�English�-�Word |
2024-12-12 [15:48]�
|
177'428� octets |
Preliminary draft new Recommendation ITU-R F.[W-BAND] - Radio-frequency channel and block arrangements for fixed service systems operating in the 92-94 GHz, 94.1-100 GHz, 102-109.5 GHz and 111.8 114.25 GHz ranges
� |
�
|
[ 152 ]�Annex 1.2�-�English�-�Word |
2024-12-12 [15:47]�
|
196'237� octets |
Preliminary draft new Recommendation ITU-R F.[D-BAND] - Radio-frequency channel and block arrangements for fixed service systems operating in the 130-134 GHz, 141-148.5 GHz, 151.5-164 GHz and 167-174.8 GHz ranges
� |
�
|
[ 152 ]�Annex 1.1�-�English�-�Word |
2024-12-12 [15:25]�
|
88'297� octets |
Preliminary draft revision of Recommendation ITU-R F.2086-0 - Deployment scenarios for point-to-point systems in the fixed service
� |
� |
[ 154 ]�
|
2024-12-11 |
WP 5A
� |
Liaison statement to Working Party 5C - Studies under WRC-27 agenda item 1.10
�
� |
AI1.10
� |
�
|
[ 154 ]��-�English�-�Word |
2024-12-11 [10:51]�
|
35'424� octets |
� |
� |
[ 153 ]�
|
2024-12-11 |
WP 5A
� |
Liaison statement to Working Parties 1B, 5C and 6A - Working document towards a preliminary draft new Report ITU-R M.[AUDIO-PMSE_LMS]
�
� |
N/A
� |
�
|
[ 153 ]��-�English�-�Word |
2024-12-11 [10:46]�
|
47'194� octets |
� |
� |
[ 151 ]�
|
2024-11-28 |
Director, BR
� |
Final list of participants - Working Party 5C (Geneva, 19-28 November 2024)
�
� |
N/A
� |
�
|
[ 151 ]��-�English�-� PDF (acrobat) |
2024-11-28 [16:41]�
|
153'359� octets |
� |
� |
[ ADM�33 ]�
|
2024-11-28 |
Acting Chair, WP 5C
� |
Agenda for the Closing Plenary of the 31st meeting of Working Party 5C - Thursday, 28 November 2024, from 0900 to 1200 hours (Geneva time) (Room A)
�
� |
N/A
� |
�
|
[ ADM�33 ]�Revision 1�-�English�-�Word |
2024-11-28 [16:14]�
|
50'129� octets |
� |
� |
[ ADM�22 ]�
|
2024-11-15 |
Acting Chair, WP 5C
� |
Assignment of documents for Working Party 5C #31 (Documents 5C/69 - 5C/147)
�
� |
N/A
� |
�
|
[ ADM�22 ]�Revision 2�-�English�-�Word |
2024-11-28 [08:01]�
|
63'026� octets |
� |
� |
[ 150 ]�
|
2024-11-27 |
ITU-D SG1 - Q3/1
� |
Liaison statement from ITU-D Study Group 1 Question 3/1 to ITU-T Study Groups, ITU-R Working Parties, APT ASTAP and ETSI - ITU-D Study Group 1 Question 3/1 - The use of telecommunications/ICTs for disaster risk reduction and management
�
� |
N/A
� |
�
|
[ 150 ]��-�English�-�Word |
2024-11-27 [16:40]�
|
37'761� octets |
� |
� |
[ ADM�24 ]�
|
2024-11-19 |
Acting Vice-Chair, WG 5C-3
� |
Draft agenda of the Closing meeting of Working-Group 5C-3 - General aspects and HF Systems - Wednesday 27 November 2024; 1330-1445 hours (Period 3) and 1515-1630 hours (Period 4) (Geneva time) (Room A, ITU Tower)
�
� |
N/A
� |
�
|
[ ADM�24 ]�Revision 6�-�English�-�Word |
2024-11-27 [12:13]�
|
70'242� octets |
� |
� |
[ 149 ]�
|
2024-11-27 |
WP 5B
� |
Liaison statement to Working Party 5C - Studies under WRC-27 agenda item 1.10
�
� |
AI1.10
� |
�
|
[ 149 ]��-�English�-�Word |
2024-11-27 [09:46]�
|
39'298� octets |
� |
� |
[ ADM�26 ]�
|
2024-11-20 |
Acting Chair, WG 5C-2
� |
Draft agenda for the second, third and final meeting of Working Group 5C-2
Sharing, Compatibility Aspects and WRCs Issues - Tuesday, 26 November 2024 at 1515hrs - Wednesday, 27 November 0900 and 1045 hrs (Room A, ITU Tower)
�
� |
N/A
� |
�
|
[ ADM�26 ]�Revision 2�-�English�-�Word |
2024-11-27 [08:13]�
|
51'343� octets |
� |
� |
[ ADM�23 ]�
|
2024-11-15 |
Acting Chair, WP 5C
� |
Draft schedule for the 31st meeting of Working Party 5C (19-28 November 2024)
�
� |
N/A
� |
�
|
[ ADM�23 ]�Revision 6�-�English�-�Word |
2024-11-26 [17:30]�
|
58'746� octets |
� |
� |
[ 148 ]�
|
2024-11-26 |
Director, BR
� |
Information on characteristics of FSS and MSS networks or systems as currently contained in BR IFIC required for studies under WRC-27 agenda item 1.10
�
� |
AI1.10
� |
�
|
[ 148 ]�Part 2�-�English�-� Excel 2007 |
2024-11-26 [16:54]�
|
4'514'883� octets |
� |
�
|
[ 148 ]�Part 1�-�English�-� Excel 2007 |
2024-11-26 [16:53]�
|
4'628'286� octets |
� |
�
|
[ 148 ]��-�English�-�Word |
2024-11-26 [16:52]�
|
9'183'343� octets |
� |
� |
[ ADM�25 ]�
|
2024-11-19 |
Chair, WG 5C-1
� |
Draft agenda for the fourth meeting of Working Group 5C-1 - Tuesday, 26 November 2024 at 0900 hours, Geneva time (Room A, ITU Tower)
�
� |
N/A
� |
�
|
[ ADM�25 ]�Revision 4�-�English�-�Word |
2024-11-25 [16:19]�
|
63'526� octets |
� |
� |
[ ADM�27 ]�
|
2024-11-20 |
Acting Chair, SWG 5C-2 WRC-27 AIs
� |
Draft agenda for the meeting of Sub-Working Group 5C-2 WRC-27 AIs (1.1, ... 1.19) reply liaison statements - Monday, 25 November 2024 at 1515 hours (Geneva time) (Room A, ITU Tower)
�
� |
N/A
� |
�
|
[ ADM�27 ]�Revision 4�-�English�-�Word |
2024-11-25 [13:44]�
|
46'581� octets |
� |
� |
[ ADM�32 ]�
|
2024-11-25 |
Acting Chair, SWG 5C-2
� |
Draft agenda for the second meeting of Sub-Working Group 5C-2
W/D adjacent band EESS - Monday, 25 November 2024, at 1045 hours (Geneva time) (Room A, ITU Tower)
�
� |
N/A
� |
�
|
[ ADM�32 ]��-�English�-�Word |
2024-11-25 [08:23]�
|
37'470� octets |
� |
� |
[ ADM�31 ]�
|
2024-11-25 |
Acting Chair, SWG 5C-2
� |
Draft agenda for the third meeting of Sub-Working Group 5C-2 WRC-27 AI 1.10 - Monday, 25 November 2024 at 0900 hours (Geneva time) (Room A, Tower)
�
� |
N/A
� |
�
|
[ ADM�31 ]��-�English�-�Word |
2024-11-25 [08:11]�
|
41'905� octets |
� |
� |
[ ADM�30 ]�
|
2024-11-22 |
Acting Chair, SWG 5C-2
� |
Draft agenda for the second meeting of Sub-Working Group 5C-2 WRC-27 AI 1.10 - Friday, 22 November 2024 at 1615 hours (Geneva time) (Room A, ITU Tower)
�
� |
N/A
� |
�
|
[ ADM�30 ]��-�English�-�Word |
2024-11-22 [11:37]�
|
38'255� octets |
� |
� |
[ ADM�29 ]�
|
2024-11-21 |
Acting Chair, SWG 5C-2
� |
Draft agenda for the first meeting of Sub-Working Group 5C-2 WRC-27 AI 1.10 - Thursday, 21 November 2024 at 1330 hours (Geneva time) (Room A, Tower)
�
� |
N/A
� |
�
|
[ ADM�29 ]��-�English�-�Word |
2024-11-21 [08:16]�
|
41'586� octets |
� |
� |
[ ADM�28 ]�
|
2024-11-20 |
Acting Chair, SWG 5C-2
� |
Draft agenda for the first meeting of Sub-Working Group 5C-2 W/D adjacent band EESS - Thursday, 21 November 2024, at 0900 hours (Geneva time) (Room A, ITU Tower)
�
� |
N/A
� |
�
|
[ ADM�28 ]��-�English�-�Word |
2024-11-20 [12:30]�
|
37'227� octets |
� |
� |
[ ADM�20 ]�
|
2024-11-15 |
Acting Chair, WP 5C
� |
Draft agenda for the opening Plenary of the 31st meeting of Working Party 5C - Tuesday, 19 November 2024, at 1400 hours (Geneva time) (Tower, Room Popov)
�
� |
N/A
� |
�
|
[ ADM�20 ]�Revision 1�-�English�-�Word |
2024-11-19 [17:18]�
|
36'889� octets |
� |
� |
[ INF�3 ]�
|
2024-11-18 |
BR, Study Groups Department
� |
Meetings of Study Group 5 and its Working Parties 5A, 5B and 5C (Geneva, 19 - 29 November 2024 and 2 - 3 December 2024)
�
� |
N/A
� |
�
|
[ INF�3 ]�Part 1�-�English�-� PowerPoint 2007 |
2024-11-18 [16:26]�
|
4'359'538� octets |
� |
�
|
[ INF�3 ]��-�English�-�Word |
2024-11-18 [16:26]�
|
5'213'182� octets |
� |
� |
[ INF�4 ]�
|
2024-11-18 |
BR, Study Groups Department
� |
ITU-R Study Group 5 and Working Parties 5A/5B/5C - Initial meetings schedule (19 - 29 November 2024)
�
� |
N/A
� |
�
|
[ INF�4 ]��-�English�-�Word |
2024-11-18 [16:28]�
|
86'679� octets |
� |
� |
[ 147 ]�
|
2024-11-18 |
WP 6A
� |
Reply liaison statement to ITU-T Study Group 15 on the role of powerline telecommunications in home-networking (copy to ITU-T Study Group 5 and ITU-R Working Parties 1A, 5C, 6B, 7A and 7D for information)
�
� |
N/A
� |
�
|
[ 147 ]��-�English�-�Word |
2024-11-19 [09:34]�
|
34'059� octets |
� |
� |
[ 146 ]�
|
2024-11-18 |
WP 6A
� |
Liaison statement to Working Party 4A (copy to Working Parties 3M, 4B, 4C, 5A, 5B, 5C, 5D, 7B, 7C and 7D) - WRC-27 agenda item 1.6
�
� |
AI1.6
� |
�
|
[ 146 ]��-�English�-�Word |
2024-11-19 [09:01]�
|
37'740� octets |
� |
� |
[ 145 ]�
|
2024-11-18 |
WP 6A
� |
Liaison statement to Working Party 5C (copy to Working Parties 3J, 3M, 4A, 4B, 4C, 5A, 5B, 7C and 7D) - WRC-27 agenda item 1.10
�
� |
AI1.10
� |
�
|
[ 145 ]��-�English�-�Word |
2024-11-19 [09:11]�
|
37'104� octets |
� |
� |
[ 144 ]�
|
2024-11-18 |
WP 6A
� |
Liaison statement to Working Party 7C (copy to Working Parties 3L, 3M, 4C, 5A, 5B, 5C, 5D, 7B and 7D) - WRC-27 agenda item 1.17
�
� |
AI1.17
� |
�
|
[ 144 ]��-�English�-�Word |
2024-11-19 [09:03]�
|
39'070� octets |
� |
� |
[ ADM�21 ]�
|
2024-11-15 |
Acting Chair, WP 5C
� |
Proposed working structure of the 31st meeting of Working Party 5C
�
� |
N/A
� |
�
|
[ ADM�21 ]��-�English�-�Word |
2024-11-18 [13:57]�
|
46'653� octets |
� |
� |
[ 143 ]�
|
2024-11-12 |
WP 4C
� |
Reply liaison statement to Working Party 5C (copy to Working Parties 4A, 4B, 5A, 5B, 7C and 7D for information) - Studies under WRC-27 agenda item 1.10
�
� |
AI1.10
� |
�
|
[ 143 ]��-�English�-�Word |
2024-11-12 [11:37]�
|
33'429� octets |
� |
� |
[ 142 ]�
|
2024-11-08 |
WP 4A
� |
Reply liaison statement to Working Party 5C - WRC-27 agenda item 1.10
�
� |
AI1.10
� |
�
|
[ 142 ]��-�English�-�Word |
2024-11-08 [13:46]�
|
2'597'056� octets |
� |
R�sultats: 62 documents
Result Page:�
1 -
2
�-�Suivant
� |
T�l�chargement de multiples documents:�Formats et langues � prendre en compte (si disponibles):