|
Format |
Size |
Posted |
|
|
|
English |
Word
�
|
39748 bytes |
2022-10-07 |
[204]�Annex 7
- List of output (TEMP) documents (Documents 7D/TEMP/67 - 7D/TEMP/78) |
|
Word
�
|
30997 bytes |
2022-10-07 |
[204]�Annex 6
- Working document towards a preliminary draft new ITU-R Report - Sharing above 71 GHz in response to Resolution 731 (Rev.WRC-19) |
|
Word
�
|
33161 bytes |
2022-10-07 |
[204]�Annex 5
- Working document towards a preliminary draft new Report ITU-R RA.[RAS 6-7 GHz] - RAS in the band 6 - 7 GHz |
|
Word
�
|
31648 bytes |
2022-10-07 |
[204]�Annex 4
- Elements for use in studies between the radio astronomy service (RAS) and active services above 71 GHz, and meta-analysis of the studies |
|
Word
�
|
687492 bytes |
2022-10-07 |
[204]�Annex 3
- Working document toward a preliminary draft new Report ITU-R RA.[HARMONICS] - Unwanted emissions created by harmonics in radio astronomy bands: measurement of impacts of harmonic emission at radio facilities � � |
|
Word
�
|
1340601 bytes |
2023-04-03 |
[204]�Annex 2
-
Preliminary draft revision of Recommendation ITU-R RA.314-10 - Preferred frequency bands for radio astronomical measurements |
|
Word
�
|
8838545 bytes |
2022-10-07 |
[204]�Annex 1
- Working document towards a preliminary draft new Report ITU-R RA.[RAS-IMT-COMPAT-43-GHZ] - Possible coordination and protection measures for stations of the radio astronomy service operating in the 42.5-43.5 GHz allocation and IMT systems operating in the 37-43.5 GHz mobile service allocation |
|
Word
�
|
88501 bytes |
2022-11-08 |
[204]�
- Report on the September 2022 meeting of Working Party 7D (Geneva with online participation, 28 September - 5 October 2022) |
|
|