International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : WP-7D : Contributions : 164 Recently posted�-� Search Meeting Documents
[164]� Report of the meeting of Working Party 7D (Geneva, 25-29 April 2022)

Format

Size

Posted

English

Word

39717 bytes 2022-05-06 [164]�Annex 14 - List of output (TEMP) documents (Documents 7D/TEMP/53 - 7D/TEMP/66))

Word

30832 bytes 2022-05-06 [164]�Annex 13 - Working document towards a preliminary draft new ITU-R Report - Sharing above 71 GHz in response

Word

32813 bytes 2022-05-06 [164]�Annex 12 - Working document towards a preliminary draft new Report ITU-R RA.[RAS 6-7 GHz] - RAS in the band 6-7 GHz

Word

31573 bytes 2022-05-06 [164]�Annex 11 - Elements for use in studies between the radio astronomy service (RAS) and active services above 71 GHz, and meta-analysis of the studies

Word

216656 bytes 2022-05-31 [164]�Annex 10 - Working document toward a preliminary draft new Report ITU-R RA.[CMB] - Technical and operational characteristics of broadband, background-limited bolometers operating in the millimeter-wave regime

Word

8055872 bytes 2022-05-02 [164]�Annex 9 - Preliminary draft new Report on technical and operational characteristics of Geodetic VLBI

Word

4290325 bytes 2022-05-03 [164]�Annex 8 - Working document towards a preliminary draft new Report ITU-R RA.[67-116GHz] - Technical and operational characteristics of radio astronomy systems and sharing feasibility in the 3-4 mm band (67-116 GHz)

Word

1093130 bytes 2022-05-02 [164]�Annex 7 - Preliminary draft new Report ITU-R RA.[350MHz] - Technical and operational characteristics of radio astronomy systems operating below 350 MHz

Word

31976 bytes 2022-04-29 [164]�Annex 6 - Terms of Reference for Working Party 7D Correspondence Group on working document toward a preliminary draft new Report [RAS-IMT-COMPAT-43-GHz]

Word

8898735 bytes 2022-05-04 [164]�Annex 5 - Working document towards a preliminary draft new Report ITU-R RA.[RAS-IMT-COMPAT-43-GHz] - Possible coordination and protection measures for stations of the radio astronomy service operating in the 42.5-43.5 GHz allocation and IMT systems operating in the 37-43.5 GHz mobile service allocation

Word

43339 bytes 2022-04-29 [164]�Annex 4 - Terms of Reference for Working Party 7D Correspondence Group on updates to the working document towards a preliminary draft new Report [HARMONICS]

Word

607357 bytes 2022-04-29 [164]�Annex 3 - Working document toward a preliminary draft new Report ITU-R RA.[HARMONICS] - Unwanted emissions created by harmonics in radio astronomy bands: measurement of impacts of harmonic emission at radio facilities

Word

874815 bytes 2022-04-29 [164]�Annex 2 - Preliminary draft new Report ITU-R RA.[EHT] - Technical and operational characteristics of widely-distributed array systems operating above 200 GHz

Word

33346 bytes 2022-04-29 [164]�Annex 1 - Preliminary draft new Question ITU-R XXX/7 - Radio astronomy in the shielded zone of the Moon

Word

84503 bytes 2022-05-31 [164]� - Report on the April 2022 meeting of Working Party 7D (Hybrid-Meeting, Geneva/Online, 25-29 April 2022)

Document :

ITU-R�WP-7D� Contribution� 164

Title :

Report of the meeting of Working Party 7D (Geneva, 25-29 April 2022)

Date :

2022-04-29

Source :

Chairman, WP 7D

Access :

Restricted to TIES users�[ITU-R]

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2022-05-31