International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : WP-6A : Contributions : 358 Recently posted�-� Search Meeting Documents
[358]� Report of the meeting of Working Party 6A (Geneva, 20-28 September 2022)

Format

Size

Posted

English

Word

39833 bytes 2022-10-31 [358]�Chapter 5 - Meeting Report from Sub-Working Group 6A-5 (Others) (Geneva, 20-28 September 2022)

Word

21135076 bytes 2022-10-07 [358]�Chapter 5 - Annex 14 - Preliminary draft revision of Report ITU-R BT.2344 - Information on technical parameters, operational characteristics and deployment scenarios of SAB/SAP as utilized in broadcasting

Word

40817 bytes 2022-10-06 [358]�Chapter 5 - Annex 15 - Revised terms of Reference of the Working Party 6A Rapporeur Group on SAB/SAP Issues

Word

53514 bytes 2022-10-31 [358]�Chapter 4 - Report from Sub-Working Group 6A-4 (Protection)

Word

8315321 bytes 2022-10-12 [358]�Chapter 4 - Annex 12 - Preliminary draft revision of Recommendation ITU-R BS.1698-0 - Evaluating fields from terrestrial broadcasting transmitting systems operating in any frequency band for assessing exposure to non ionizing radiation

Word

38578 bytes 2022-10-06 [358]�Chapter 4 - Annex 13 - Revised Terms of Reference of Working Party 6A Correspondence Group on CISPR Radio Services Database and its work plan

Word

60623 bytes 2022-10-31 [358]�Chapter 3 - Meeting Report from Sub-Working Group 6A-3 (WRC agenda items and sharing)

Word

1599460 bytes 2022-10-06 [358]�Chapter 3 - Annex 8 - Working document towards a preliminary draft revision of Report ITU-R BT.2383-4 - Typical frequency sharing characteristics for digital terrestrial television broadcasting systems in the frequency band 470-862 MHz

Word

41887 bytes 2022-10-06 [358]�Chapter 3 - Annex 9 - Progress Report - Revision of Report ITU-R BT.2383

Word

35847 bytes 2022-10-06 [358]�Chapter 3 - Annex 10 - Continuation of Rapporteur Group to undertake WRC-23 related studies called for by CPM23-1

Word

39777 bytes 2022-10-06 [358]�Chapter 3 - Annex 11 - Terms of Reference of the Rapporteur Group on WRC-23 agenda item 1.5 and Working Party 6A work plan on WRC-23 agenda item 1.5

Word

41288 bytes 2022-10-31 [358]�Chapter 2 - Meeting Report from Sub-Working Group 6A-2 (Sound and Multimedia)

Word

49693 bytes 2022-10-31 [358]�Chapter 1 - Meeting Report from Sub-Working Group 6A-1 (Television) (Geneva, 20-28 September 2022)

Word

38716 bytes 2022-10-06 [358]�Chapter 1 - Annex 1 - Preliminary draft revision of Recommendation ITU-R BT.2036-4 - Characteristics of a reference receiving system for frequency planning of digital terrestrial television systems

Word

3291021 bytes 2022-10-06 [358]�Chapter 1 - Annex 2 - Preliminary draft revision of Report ITU-R BT.2140-13 - Transition from analogue to digital terrestrial broadcasting

Word

3806576 bytes 2022-10-06 [358]�Chapter 1 - Annex 3 - Preliminary draft revision of Report ITU-R BT.2386-3 - Digital terrestrial broadcasting: Design and implementation of single frequency networks (SFN)

Word

51173 bytes 2022-10-06 [358]�Chapter 1 - Annex 4 - Preliminary draft revision of Report ITU-R BT.2485-1 - Advanced network planning and transmission methods for enhancements of digital terrestrial television broadcasting

Word

10996109 bytes 2022-10-06 [358]�Chapter 1 - Annex 5 - Working document towards a preliminary draft new Report ITU-R BT.[TRIALS-NEW-TMMB] - Collection of field trials of Terrestrial Multimedia Mobile Broadcasting systems

Word

29234015 bytes 2022-10-06 [358]�Chapter 1 - Annex 6 - Preliminary draft revision of Report ITU-R BT.2343-7 - Collection of field trials of UHDTV over DTT networks

Word

348552 bytes 2022-10-06 [358]�Chapter 1 - Annex 7 - Working document towards a preliminary draft new Report ITU-R BT.[ITCN] - Inter-tower communications network (ITCN) for terrestrial broadcasting and datacasting systems

Word

114148 bytes 2022-11-01 [358]� - Chairman's Report of the meeting of Working Party 6A (Geneva, 20-28 September 2022)

Document :

ITU-R�WP-6A� Contribution� 358

Title :

Report of the meeting of Working Party 6A (Geneva, 20-28 September 2022)

Date :

2022-09-29

Source :

Chairman, WP 6A

Access :

Restricted to TIES users�[ITU-R]

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2022-12-12