International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : SG01 : Contributions� Recently posted�-� Search Meeting Documents
ITU-R�SG01� C�

ITU-R�SG01

Spectrum Management

Results:165 total items.
Result page:� 1 - 2 - 3 - 4 �-�Next Next
Contributions��Documents / Contributions

Number
Title Source AI/Question
Date
[ 165 ]
Liaison statement on request to provide the standardization status for metaverse-related technologies � ITU-T FG-MV 2023-10-19
[ 164 ]
Reply liaison statement to CISPR/H (copy for information or action to Working Parties 4A and 7D on Question 6) (copy for information to Study Group 1 and Working Parties 1A and 5A) � WP 6A 2023-09-11
[ 163 ]
Note to the Chairmen of Working Parties 4A and 7D (copy to the Chairmen of Study Group 1 and Working Party 1A) � Chairman, WP 6A 2023-06-14
[ 162 ]
+Corr.1
Summary Record of the meeting of Radiocommunication Study Group 1 (Geneva, 5-6 June 2023) � Chairman, SG 1 2023-06-06
[ 161 ]
Final list of participants - Study Group 1 (Geneva, 5-6 June 2023) � Director, BR 2023-06-06
[ 160 ]
List of documents issued (Documents 1/112-1/160) � BR, Study Groups Department 2023-06-05
[ 159 ]
Preliminary draft of the Study Group 1 Chairman's Report to RA-23 - Spectrum management � Chairman, SG 1 2023-06-05
[ 158 ]
(Rev.1)
Revision of Report ITU R SM.2048-0 - Use of the x dB bandwidth criterion for determination of spectral properties of a transmitter in the out-of-band domain � WP 1A 2023-06-02
[ 157 ]
(Rev.1)
Editorial revision of Recommendations assigned to ITU-R Working Party 1A � WP 1A 2023-06-02
[ 156 ]
(Rev.1)
Revision of Report ITU-R SM.2303-3 - Wireless power transmission using technologies other than radio frequency beam � WP 1A 2023-06-02
[ 155 ]
Executive Report on the May - June 2023 meeting of Working Party 1A (29 May - 2 June 2023) � Chairman, WP 1A 2023-06-02
[ 154 ]
Executive Report on Working Party 1B meeting (Meeting in Thessaloniki from 29 May to 2 June 2023) � Chairman, WP 1B 2023-06-02
[ 153 ]
(Rev.1)
Revision of Report ITU-R SM.2179-1 - Short-range radiocommunication devices measurements � WP 1C 2023-06-02
[ 152 ]
(Rev.1)
Editorial revision of one Report assigned to Working Party 1C � WP 1C 2023-06-02
[ 151 ]
(Rev.1)
Revision of Report ITU-R SM.2454-0 - Spectrum monitoring techniques in the radionavigation-satellite service frequency bands � WP 1C 2023-06-02
[ 150 ]
(Rev.1)
Editorial revision of eight Recommendations assigned to Working Party 1C � WP 1C 2023-06-02
[ 149 ]
(Rev.1)
Draft revision of Recommendation ITU-R SM.1838-0 - Test procedure for measuring the noise figure of radio monitoring receivers � WP 1C 2023-06-02
[ 148 ]
Draft revision of Report ITU-R SM.2486-0 - Use of commercial drones for ITU-R spectrum monitoring tasks � WP 1C 2023-06-02
[ 147 ]
(Rev.1)
Revision of Report ITU-R SM.2355-1 - Spectrum monitoring evolution � WP 1C 2023-06-02
[ 146 ]
(Rev.1)
Revision of Report ITU-R SM.2257-6 - Spectrum management and monitoring during major events � WP 1C 2023-06-02
[ 145 ]
(Rev.1)
Revision of Report ITU-R SM.2182-2 - Measurement facilities available for the measurement of emissions from both GSO and non-GSO space stations � WP 1C 2023-06-02
[ 144 ]
Preliminary draft revision of ITU-R Resolutions � WP 1B 2023-06-02
[ 143 ]
(Rev.1)
Editorial revision of six Recommendations assigned to ITU-R Working Party 1B � WP 1B 2023-06-02
[ 142 ]
Liaison statement to ITU-R Study Group 1 - Further development of the Spectrum Management System for Developing Countries � SG 3 2023-06-02
[ 141 ]
Executive Report to Study Group 1 (Working Party 1C meeting in Thessaloniki, Greece, from 29 May to 2 June 2023) � Chairman, WP 1C 2023-06-02
[ 140 ]
(Rev.1)
New Report ITU-R SM.2523-0 - Assessment of Spectrum efficiency and economic value � WP 1B 2023-06-02
[ 139 ]
(Rev.1)
Editorial revision to Recommendation ITU-R SM.1756-0 - Framework for the introduction of devices using ultra-wideband technology � WP 1B 2023-06-02
[ 138 ]
(Rev.1)
Editorial revision of Report ITU-R SM.2153-9 - Technical and operating parameters and spectrum use for short range radiocommunication devices � WP 1B 2023-06-02
[ 137 ]
Liaison statement to the Coordination Committee for Terminology (CCT) (copy to Working Parties 1B, 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D, and Study Group 1 for information) - Proposed revision of Recommendation ITU-R V.431-8 � WPs 3J, 3K & 3M 2023-06-02
[ 136 ]
Liaison statement to ITU-T Study Groups 16 and 20, ITU-R SG 1 and Working Parties 1B, 5A and 5D (copy to ITU-T SGs 2, 3, 5, 9, 13, and ITU-R WPs 1C, 4A, 5B, 5C, 6A, 7B) on question of mutual interest and implementation of the WTDC Resolution 9 (Rev. Kigali, 2022) for e-services including e-health and e-education � ITU-D SG2 2023-05-31
[ 135 ]
Liaison statement from ITU-D Study Group 2 Question 7/2 to ITU-T Study Group 5 and ITU-R Study Group 1 (copy to ITU-R Working Parties 1C, 4A, 5A, 5B, 5C, 5D and 6A) on questions of mutual interest and implementation of the WTDC Resolution 9 (Rev. Kigali, 2022) - ITU-D Study Group 2 Question 7/2: Strategies and policies concerning human exposure to electromagnetic fields � ITU-D SG2 2023-05-27
[ 134 ]
Report of Correspondence group on editorial review and maintenance of ITU-R Recommendations, Reports and Questions assigned to the Study Group 1 � Chairman, SG 1 CG on editorial review 2023-05-26
[ 133 ]
(Rev.2)
Report on CISPR activities from June 2022 to May 2023 - On WPT and general issues � SG 1 Rapp. to CISPR on WPT Issues 2023-05-26
[ 132 ]
Draft reply liaison statement from Study Group 1 to the Coordination Committee for Terminology - Revising Recommendation ITU-R V.431-8 � ATDI 2023-05-25
[ 131 ]
Liaison statement from ITU-D Study Group 1 Question 4/1 to ITU-R Study Group 1 and Working Party 1B on the questions of mutual interest and implementation of the WTDC Resolution 9 (Rev. Kigali, 2022) � ITU-D SG1 2023-05-23
[ 130 ]
Editorial revisions of ITU-R SM-series Recommendations that cite CISPR publications � SG 1 Rapp. to CISPR 2023-05-22
[ 129 ]
Liaison statement on the new version of the Home Network Transport (HNT) Standards Overview and Work plan � ITU-T SG15 2023-05-04
[ 128 ]
Liaison statement on the new version of the Access Network Transport (ANT) Standards Overview and Work plan � ITU-T SG15 2023-05-04
[ 127 ]
Liaison response from International Special Committee on Radio Interference - CISPR/H to ITU-R Working Party 6A (copy to ITU-R Study Group 1 and Working Party 1A for information) � International Special Committee on Radio Interference 2023-04-28
[ 126 ]
WTDC Resolution 9 (Rev. Kigali, 2022) implementation ITU-R and ITU-D collaboration - Participation of countries, particularly developing countries, in spectrum management � Kenya (Republic of) , ATDI 2023-04-21
[ 125 ]
Liaison statement to ITU-T Study Group 5, ITU-D Study Group 2 and ITU-R Study Group 1 - Revision of Recommendation ITU-R BS.1698 � WP 6A 2023-03-21
[ 124 ]
Recommendation ITU-R M.1732-3 - Characteristics of systems operating in the amateur and amateur-satellite services for use in sharing studies � SG 5 2023-02-23
[ 123 ]
Liaison statement from ITU-D Study Group 2 Question 6/2 to ITU-T Study Groups 5 and 20, and ITU-R Study Groups 1, 4, 6 and 7 on new Question 6/2 and collaboration � ITU-D SG2 2022-12-21
[ 122 ]
Liaison statement from ITU-D Study Group 1 Question 6/1 to ITU-R Study Group 1 and Working Party 1B on consumer information, protection and rights � ITU-D SG1 2022-12-20
[ 121 ]
Liaison statement from ITU-D Study Group 1 Question 2/1 to ITU-R Study Group 1 on collaboration � ITU-D SG1 2022-12-20
[ 120 ]
Reply liaison statement to Coordination Committee for Terminology (CCT) (copy to Study Groups 1, 3, 4, 6 and 7, as well as Working Parties 1B, 5A, 5D, 6A, 7C and 7D) - Symbols in Recommendation ITU-R V.431-8 inconsistent with the definitions of the SI units and adding a new symbol THF � WP 5C 2022-11-30
[ 119 ]
Reply liaison statement to Coordination Committee for Terminology (CCT) (copy to Study Groups 1, 3, 4, 6 and 7, as well as Working Parties 1B, 5C, 5D, 6A, 7C and 7D) - Symbols in Recommendation ITU-R V.431-8 inconsistent with the definitions of the SI units and adding a new symbol to the Radio Regulations � WP 5A 2022-11-28
[ 118 ]
Reply liaison statement to Coordination Committee for Terminology (CCT) (copy to Study Groups 1, 3, 4, 6 and 7, as well as Working Parties 1B, 5A, 5C, 6A and 7D) - Symbols in Recommendation ITU-R V.431-8 inconsistent with the definitions of the SI units and adding a new symbol to the Radio Regulations � WP 5D 2022-10-28
[ 117 ]
Liaison statement on the new version of the Home Network Transport (HNT) standards overview and work plan � ITU-T SG15 2022-10-14
[ 116 ]
Liaison statement on the new version of the Access Network Transport (ANT) standards overview and work plan � ITU-T SG15 2022-10-14
Results:165 total items.
Result page:� 1 - 2 - 3 - 4 �-�Next Next
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2023-10-19