|
Format |
Size |
Posted |
|
|
|
English |
Word
�
|
50011 bytes |
2018-03-22 |
[675]�Annex 55
- List of liaison statements to ITU-R Groups |
|
Word
�
|
46408 bytes |
2018-03-08 |
[675]�Annex 54
- Draft liaison statement to ITU-D Study Groups 1 and 2 - Interrelated activities of ITU-R and ITU-D in response to Resolution ITU-R 69 (RA-15) |
|
Word
�
|
85869 bytes |
2018-03-08 |
[675]�Annex 53
- Note to the Director, Radiocommunication Bureau - Cost recovery for non-GSO satellite systems |
|
Word
�
|
80811 bytes |
2018-03-08 |
[675]�Annex 52
- Working document towards draft CPM text for WRC-19 agenda item 9.1, issue 9.1.9 |
|
Word
�
|
47477 bytes |
2018-03-08 |
[675]�Annex 51
- Work plan for WRC-19 agenda item 9.1, issue 9.1.9 |
|
Word
�
|
53365 bytes |
2018-03-08 |
[675]�Annex 50
- Working document towards draft CPM text for WRC-19 agenda item 9.1, issue 9.1.3 |
|
Word
�
|
47166 bytes |
2018-03-08 |
[675]�Annex 49
- Work plan for WRC-19 agenda item 9.1, issue 9.1.3 |
|
Word
�
|
79847 bytes |
2018-03-08 |
[675]�Annex 48
- Working document towards draft CPM text for WRC-19 agenda item 9.1, issue 9.1.2 |
|
Word
�
|
48364 bytes |
2018-03-08 |
[675]�Annex 47
- Work Plan for WRC-19 agenda item 9.1, issue 9.1.2 |
|
Word
�
|
56316 bytes |
2018-03-08 |
[675]�Annex 46
- Working document towards draft CPM text for WRC-19 agenda item 7 - Issue N |
|
Word
�
|
60341 bytes |
2018-03-08 |
[675]�Annex 45
- Working document towards draft CPM text for WRC-19 agenda item 7 - Issue M |
|
Word
�
|
82498 bytes |
2018-03-08 |
[675]�Annex 44
- Preliminary draft CPM text for WRC-19 agenda item 7 - Issue L |
|
Word
�
|
792239 bytes |
2018-03-08 |
[675]�Annex 43
- Preliminary draft CPM text for WRC-19 agenda item 7 - Issue K |
|
Word
�
|
53066 bytes |
2018-03-08 |
[675]�Annex 42
- Preliminary draft CPM text for WRC-19 agenda item 7 - Issue J |
|
Word
�
|
59298 bytes |
2018-03-08 |
[675]�Annex 41
- Preliminary draft CPM text for WRC-19 agenda item 7 - Issue I |
|
Word
�
|
66288 bytes |
2018-03-07 |
[675]�Annex 40
- Preliminary draft CPM text for WRC-19 agenda item 7 - Issue H |
|
Word
�
|
81686 bytes |
2018-03-08 |
[675]�Annex 39
- Working document towards draft CPM Text for WRC-19 agenda item 7 - Issue G |
|
Word
�
|
52215 bytes |
2018-03-08 |
[675]�Annex 38
- Working document towards draft CPM text for WRC-19 agenda item 7 - Issue F |
|
Word
�
|
50247 bytes |
2018-03-07 |
[675]�Annex 37
- Working document towards draft CPM text for WRC-19 agenda item 7 - Issue E |
|
Word
�
|
52455 bytes |
2018-03-08 |
[675]�Annex 36
- Draft CPM text for WRC-19 agenda item - Issue D |
|
Word
�
|
64655 bytes |
2018-03-07 |
[675]�Annex 35
- Preliminary draft CPM text for WRC-19 agenda item 7 - Issue C |
|
Word
�
|
69309 bytes |
2018-03-07 |
[675]�Annex 34
- Preliminary draft CPM text for WRC-19 agenda item 7 - Issue B |
|
Word
�
|
89248 bytes |
2018-03-08 |
[675]�Annex 33
- Preliminary draft CPM text for WRC-19 agenda item 7 - Issue A |
|
Word
�
|
47492 bytes |
2018-03-07 |
[675]�Annex 32
- Work plan for WRC-19 agenda item 7 |
|
Word
�
|
93101 bytes |
2018-03-07 |
[675]�Annex 31
- Working document towards draft CPM text for WRC-19 agenda item 1.6 |
|
Word
�
|
48720 bytes |
2018-03-07 |
[675]�Annex 30
- Work plan for WRC-19 agenda item 1.6 |
|
Word
�
|
79744 bytes |
2018-03-07 |
[675]�Annex 29
- Working document towards draft CPM text for WRC-19 agenda item 1.5 |
|
Word
�
|
46846 bytes |
2018-03-07 |
[675]�Annex 28
- Work plan for WRC-19 agenda item 1.5 |
|
Word
�
|
209057 bytes |
2018-03-07 |
[675]�Annex 27
- Draft CPM text for WRC-19 agenda item 1.4 |
|
Word
�
|
48179 bytes |
2018-03-07 |
[675]�Annex 26
- Work plan for WRC-19 agenda item 1.4 |
|
Word
�
|
50295 bytes |
2018-03-07 |
[675]�Annex 25
- Consideration and discussion on FSS/BSS protection criteria for sharing studies relating to WRC-19 agenda items 1.13, 1.14, 1.16 |
|
Word
�
|
50241 bytes |
2018-03-07 |
[675]�Annex 24
- Discussions pertaining to Question ITU-R 236/4 - Interference criteria and calculation methods for the fixed-satellite service |
|
Word
�
|
47650 bytes |
2018-03-07 |
[675]�Annex 23
- Working document on elements to be considered to support application of Recommendation ITU-R S.1503-3 or for the future revision of Recommendation ITU-R S.1503-3 - Functional description to be used in developing software tools for determining conformity of non-geostationary-satellite orbit fixed-satellite system networks with limits contained in Article 22 of the Radio Regulations |
|
Excel 2007
�
|
35982 bytes |
2018-03-07 |
[675]�Annex 22 Part 1
|
|
Word
�
|
90809 bytes |
2018-03-07 |
[675]�Annex 22
- Working document on WRC-19 agenda item 1.13 - FSS/BSS technical parameters for sharing studies under WRC-19 agenda item 1.13 |
|
Word
�
|
66890 bytes |
2018-03-07 |
[675]�Annex 21
- Working document towards the development of a methodology to validate the minimum emission parameters contained within submissions of FSS satellite networks not subject to RR Appendix 30B |
|
Word
�
|
163841 bytes |
2018-03-07 |
[675]�Annex 20
- Working document towards a preliminary draft new Report ITU-R S.[NGSO_6/4-GHz] - Technical and regulatory studies for 6/4 GHz non-GSO FSS sharing |
|
Word
�
|
885732 bytes |
2018-03-07 |
[675]�Annex 19
- Working document towards a preliminary draft new Report ITU-R S.[NGSO-to-GSO] - Technical feasibility of NGSO-to-GSO satellite links |
|
Word
�
|
50332 bytes |
2018-03-07 |
[675]�Annex 18
- Working document towards a preliminary draft new Report ITU-R S.[MOD_NON-GSO] - Regulatory provisions for the modification of notices relative to
non-geostationary systems operating in the FSS, MSS and BSS
above 10 GHz subject to Section II of Article 9 of the Radio Regulations
|
|
Word
�
|
156094 bytes |
2018-03-07 |
[675]�Annex 17
- Working document towards a preliminary draft new Report ITU-R S.[NGSO_BIU+MILESTONES] - Studies relating to the bringing into use of frequency assignments for all non GSO satellite systems, and consideration of a milestone-based deployment approach for non-GSO satellite systems in specific bands and services |
|
Word
�
|
1452965 bytes |
2018-03-06 |
[675]�Annex 16
- Working document towards a preliminary draft new Report ITU-R M.[IMT&BSS Compatibility] - Compatibility studies between IMT systems and BSS (sound) systems in the band 1 452-1 492 MHz in different countries in Regions 1 and 3 |
|
Word
�
|
3931067 bytes |
2018-03-06 |
[675]�Annex 15
- Working document towards a preliminary draft new Report/Recommendation ITU-R [LESIM-MS] - Statistical methodologies to estimate the interference from land earth stations in motion (L-ESIM) communicating with geostationary space stations in the
fixed-satellite service into mobile service (MS) stations operating in the frequency band 27.5-29.5 GHz
|
|
Word
�
|
6609803 bytes |
2018-03-06 |
[675]�Annex 14
- Working document towards a preliminary draft new Report/Recommendation ITU-R [LESIM-FS] - Statistical methodologies to estimate the interference from land earth stations in motion (L-ESIM) communicating with geostationary space stations in the fixed satellite service into fixed service (FS) stations operating in the frequency band 27.5-29.5 GHz |
|
Word
�
|
592489 bytes |
2018-03-06 |
[675]�Annex 13
- Working document towards a preliminary draft new Report ITU-R S.[ESIM] - Earth stations in motion (ESIM) compatibility with non-GSO MSS feeder links in the bands 19.3-19.7 GHz and 29.1-29.5 GHz |
|
Word
�
|
6349309 bytes |
2018-03-06 |
[675]�Annex 12
- Working document towards a preliminary draft new Report ITU-R S./M.[ESIM-MS] - Sharing and compatibility between earth stations in motion operating with geostationary FSS networks and current and planned stations of the MS
in the frequency band 27.5-29.5 GHz
|
|
Word
�
|
9444897 bytes |
2018-03-06 |
[675]�Annex 11
- Working document towards a preliminary draft new Report ITU-R S./F.[ESIM-FS] - Sharing and compatibility between earth stations in motion operating with geostationary FSS networks and current and planned stations of the FS in the frequency bands 27.5-29.5 GHz and 17.7-19.7 GHz
|
|
Word
�
|
455150 bytes |
2018-03-07 |
[675]�Annex 10
- Working Document towards a preliminary draft new Report ITU-R S.[AGENDA ITEM 1.5] - Operation of earth stations in motion (ESIM) communicating with geostationary space stations in the fixed-satellite service allocations at 17.7-19.7 GHz and 27.5-29.5 GHz |
|
Word
�
|
17269487 bytes |
2018-03-07 |
[675]�Annex 09
- Working document towards a preliminary draft new Report ITU-R BO.[AP30.ANNEX7] - Assessment on limitations mentioned in Annex 7 to RR Appendix 30 (Rev.WRC 15) in the 11.7-12.7 GHz band for the GSO broadcasting-satellite service in all Regions |
|
Word
�
|
6571825 bytes |
2018-03-06 |
[675]�Annex 08
- Working document towards a preliminary draft new Report ITU-R S.[50/40 GHz adjacent band studies] - Protection of EESS (passive) and RAS systems from non GSO fixed satellite systems operating in the 37.5-42.5 GHz, 47.2 50.2 GHz and 50.4-51.4 GHz frequency bands - WRC-19 agenda item 1.6 |
|
Word
�
|
607560 bytes |
2018-03-06 |
[675]�Annex 07
- Working document towards a preliminary draft new Report ITU-R S.[50/40 NGSO-NGSO Sharing] - Study of mitigation techniques between non-GSO FSS systems in the bands 36-37 GHz and 50.2-50.4 GHz - WRC-19 agenda item 1.6 |
|
Word
�
|
6333560 bytes |
2018-03-06 |
[675]�Annex 06
- Working document towards a preliminary draft new Report ITU-R S.[50/40 GSO-NGSO Sharing] - Sharing between 50/40 GHz GSO networks and non-GSO systems |
|
Word
�
|
5468136 bytes |
2018-03-06 |
[675]�Annex 05
- Working document towards a preliminary draft revision of Recommendation ITU-R S.1782-0 - Possibilities for global broadband Internet accessby fixed-satellite service systems |
|
Excel 2007
�
|
23685 bytes |
2018-03-06 |
[675]�Annex 04 Part 1
|
|
Word
�
|
72091 bytes |
2018-03-06 |
[675]�Annex 04
- Working document towards a preliminary draft new Recommendation ITU-R S.[50/40 REFERENCE LINKS] - Satellite system characteristics to be considered in frequency sharing analyses within the fixed-satellite service in the frequency bands 37.5-39.5 GHz, 39.5-42.5 GHz, 47.2-50.2 GHz and 50.4-51.4 GHz |
|
Word
�
|
7049039 bytes |
2018-03-06 |
[675]�Annex 03
- Preliminary draft new Report ITU-R S.[SPECTRUM_SHARING] - Sharing with incumbent services in the 51.4-52.4 GHz band and adjacent and nearby bands |
|
Word
�
|
1270398 bytes |
2018-03-06 |
[675]�Annex 02
- Preliminary draft new Recommendation ITU-R S.[GUIDELINES HARMFUL INTERFERENCE REPORTING] - Guidelines for reporting harmful interference to GSO satellite networks |
|
Word
�
|
302146 bytes |
2018-03-06 |
[675]�Annex 01
- Preliminary draft new Recommendation ITU-R S.[50/40 GHZ FSS Sharing Methodology} - Maximum permissible levels of interference in a GSO FSS network caused by co-directional GSO and non-GSO FSS systems and in non-GSO FSS systems caused by other co-directional non-GSO FSS systems operating in the 50/40 GHz frequency bands
|
|
Word
�
|
57878 bytes |
2018-04-19 |
[675]�Corrigendum 1
- Report on the meeting of Working Party 4A (Geneva, 20 February - 2 March 2018) |
|
Word
�
|
1354312 bytes |
2018-03-29 |
[675]�
- Report on the meeting of Working Party 4A (Geneva, 20 February - 2 March 2018) |
|
|