International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : WP1B : Contributions : 193 Recently posted�-� Search Meeting Documents
[193]� Report on the third 2015-2019 meeting of Working Party 1B (Geneva, 13 - 20 June 2017)

Format

Size

Posted

English

Word

53266 bytes 2017-07-13 [193]�Annex 13 - Working document towards preliminary draft revision of Recommendation ITU-R SM.1896 - Frequency ranges for global or regional harmonization of short-range devices

Word

234043 bytes 2017-07-11 [193]�Annex 12 - Working document towards a preliminary draft revision of Report ITU-R SM.2015 - Methods for determining national long-term strategies for spectrum utilization

Word

48775 bytes 2017-07-11 [193]�Annex 11 - Terms of reference of the Correspondence Group on working document towards a preliminary draft new Report ITU-R SM.[LPWAN.MTC] in the context of studies under WRC-19 agenda item 9.1, Issue 9.1.8 (Item 3 of the Annex to Res. 958 (WRC-15))

Word

47009 bytes 2017-07-11 [193]�Annex 10 - Working document towards a preliminary draft new Report ITU-R SM.[LPWAN.MTC] - Low Power Wide Area Networks (LPWAN) for Machine-Type Communication and the Internet of Things and potential harmonization opportunities

Word

168573 bytes 2017-07-11 [193]�Annex 09 - Working document towards a preliminary draft new report on studies for WRC-19 agenda item 9.1, issue 9.1.7

Word

48752 bytes 2017-07-10 [193]�Annex 08 - Work plan for WRC-19 agenda item 9.1, Issue 9.1.7 - Res. 958 (WRC-15) Annex item 2

Word

48271 bytes 2017-07-10 [193]�Annex 07 - Working document towards draft CPM text on WRC-19 agenda item 9.1, Issue 9.1.7 - Res. 958 (WRC-15) Annex item 2

Word

54704 bytes 2017-07-10 [193]�Annex 06 - Liaison statement to external organizations and Standards Development Organizations (Copy to IEC TC 69/JPT 61980, ISO TC 22 and IEC TC 9) - Study on Question ITU-R 210-3/1 "Wireless power transmission" and WRC-19 agenda item 9.1, issue 9.1.6 in response to Res. 958 (WRC-15) Annex item 1

Word

48158 bytes 2017-07-10 [193]�Annex 05 - Liaison statement to external organizations and Standards Development Organizations IEC-CISPR, IEC, ISO, SAE, ETSI (Copy to APT, AFA, ARIB, ATIS, BWF, CCSA, CEA, IEEE, ISACC, NFC Forum, TIA, TTA, TTC, URSI (ICWG on SPS), WPC, WIPE and WIPOT) - Wireless Power Transmission - Invitation for IEC-CISPR, IEC, ISO, SAE, ETSI and other SDOs to collaborate with the ITU-R to avoid conflicting outcomes

Word

46784 bytes 2017-07-10 [193]�Annex 04 - Terms of reference (tor) for the Working Parties 1A and 1B Rapporteur Group (RG-WPT) on developing content for deliverables related to Question ITU-R 210-3/1 - Wireless Power Transmission and WRC-19 agenda item 9.1 in response to Resolution 958 (WRC-15) "Urgent studies required in preparation for the 2019 World Radiocommunication Conference" Annex item 1

Word

85224 bytes 2017-07-10 [193]�Annex 03 - Working document towards a preliminary draft new Report ITU-R SM.[WPT-SPEC-MNGM] - [Methodology for spectrum management of wireless power transmission (WPT)]

Word

45030 bytes 2017-07-11 [193]�Annex 02 - Work plan for WRC-19 agenda item 9.1, issue 9.1.6 - Resolution 958 (WRC-15) Annex item 1 (WPT4EV)

Word

47261 bytes 2017-07-11 [193]�Annex 01 - Working document towards Draft CPM Text on WRC-19 agenda item 9.1, issue 9.1.6 - Resolution 958 (WRC-15) Annex item 1 (WPT4EV)

Word

71430 bytes 2017-07-17 [193]�Revision 1 - Report on the third 2015-2019 meeting of Working Party 1B (Geneva, 13-20 June 2017)

Document :

ITU-R�WP1B� Contribution� 193

Title :

Report on the third 2015-2019 meeting of Working Party 1B (Geneva, 13 - 20 June 2017)

Date :

2017-06-21

Source :

Chairman, WP 1B

Access :

Restricted to TIES users�[ITU-R]

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2017-07-17