International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : WP4A : Contributions : 514 Recently posted�-� Search Meeting Documents
[514]� Report on the meeting of Working Party 4A (Geneva, 5-11 May 2011)

Format

Size

Posted

English

Word

52337 bytes 2011-05-30 [514]�Annex 21 - List of liaison statements to ITU-R Groups

Word

98655 bytes 2011-05-24 [514]�Annex 20 - Preliminary draft revision of Recommendation ITU-R SF.674-2

Word

99833 bytes 2011-05-19 [514]�Annex 19 - Working document on possible liaison statement to Working Party 5C on preliminary draft revision of Recommendation ITU-R F.1245-1

Word

91533 bytes 2011-05-19 [514]�Annex 18 - Working document on Recommendations ITU-R S.1844 and ITU-R S.731 and a review of the need for the VSAT series of Recommendations

Word

199874 bytes 2011-05-19 [514]�Annex 17 - Working document on a technical evaluation of the impact of a proposed region 1 BSS satellite network at 1.9� E on neighbouring FSS satellite networks serving Region 2 in the band 11.7-12.2 GHz

Word

125314 bytes 2011-05-19 [514]�Annex 16 - Working document - Evaluation of interference from FS stations to BSS space stations in the frequency band 24.65 25.25 GHz (Earth-to-space)

Word

2757919 bytes 2011-05-19 [514]�Annex 15 - Working document - Sharing study between FSS uplinks and terrestrial services in the 24.65-25.25 GHz band

Word

1153904 bytes 2011-05-19 [514]�Annex 14 - Working document towards a preliminary draft new Report ITU R [SF].[STATMETH] - Example of a possible mathematical implementation of the methodology for statistically calculating the interference received by the fixed service from space-to-Earth emissions

Word

318390 bytes 2011-05-19 [514]�Annex 13 - Working document towards a preliminary draft new Report ITU-R S.[VSAT] - Use of very small aperture terminals (VSATs)

Word

120394 bytes 2011-05-19 [514]�Annex 12 - Working document towards a preliminary draft new Report ITU-R S.[ASYM.FSS] - Addressing the existing asymmetry in the unplanned FSS uplink/downlink spectrum in the 10-15 GHz band

Word

73664 bytes 2011-05-24 [514]�Annex 11 - Working document towards a preliminary draft revision of Recommendation ITU-R S.729 - Control and monitoring function of very small aperture terminals (VSATs)

Word

144149 bytes 2011-05-24 [514]�Annex 10 - Working document towards a preliminary draft revision of Recommendation ITU-R S.732 - Method for statistical processing of earth-station antenna side-lobe peaks

Word

75661 bytes 2011-05-19 [514]�Annex 09 - Working document towards a preliminary draft new Recommendation on the use of earth stations on mobile platforms in the bands from 17.3-30.0 GHz - Technical and operational requirements for FSS earth stations on mobile platforms using fixed-satellite serv

Word

84714 bytes 2011-05-19 [514]�Annex 08 - Working document towards a preliminary draft new Recommendation ITU-R BO.[BSS_TERR] - Protection of assignments to receiving earth stations in the broadcasting-satellite service in the band 21.4-22 GHz in Regions 1 and 3 from interference caused by assign

Word

81167 bytes 2011-05-19 [514]�Annex 07 - Working document towards a preliminary draft new Recommendation ITU-R BO.[PFD_TERRESTRIAL] - Power flux-density, for the protection of the broadcasting-satellite network in Regions 1 and 3, produced by emissions from a station in the terrestrial services

Word

72263 bytes 2011-05-19 [514]�Annex 06 - Working document towards a preliminary draft new Recommendation ITU-R S.[SIDE-LOBE_QUALITY] - Index to measure the performance of antenna side lobes

Word

71379 bytes 2011-05-19 [514]�Annex 05 - Working document towards a preliminary draft new Recommendation ITU-R BO.[BSS_ANT_PAT] - Reference receiving earth station antenna pattern for the broadcasting-satellite service in the band 21.4-22.0 GHz (Regions 1 and 3)

Word

393352 bytes 2011-05-19 [514]�Annex 04 - Preliminary draft new Report ITU-R S.[COORD_ARC] - Coordination arc applicable to GSO/GSO FSS under RR No. 9.7 in the 6/4 GHz and 14/10/11/12 GHz frequency bands

Word

3454265 bytes 2011-05-19 [514]�Annex 03 - Preliminary draft new Report ITU R M.[IMT.MITIGATION] - Techniques designed to increase the potential for sharing between IMT systems and FSS networks in the 3.4-3.6 GHz band

Word

86556 bytes 2011-05-19 [514]�Annex 02 - Preliminary draft new Recommendation ITU-R [SF].[STATMETH] - Basic requirements for a methodology to calculate the statistics of interference received by fixed service stations from FSS/BSS space-to-Earth emissions for frequency bands above about 17 GHz

Word

74178 bytes 2011-05-19 [514]�Annex 01 - Preliminary draft new Recommendation ITU-R S.[ISS-NON-GSO] - Protection criteria and interference assessment methods for non-GSO inter-satellite links in the 23.183-23.377 GHz band with respect to the space research service

Word

142017 bytes 2011-05-30 [514]� - Report on the meeting of Working Party 4A (Geneva, 5-11 May 2011)

Document :

ITU-R�WP4A� Contribution� 514

Title :

Report on the meeting of Working Party 4A (Geneva, 5-11 May 2011)

Date :

2011-05-11

Source :

Chairman, WP 4A

Access :

Restricted to TIES users�[ITU-R]

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2011-05-30