|
Format |
Size |
Posted |
|
|
|
English |
Word
�
|
248320 bytes |
2009-10-15 |
[278]�Annex 19
- List of liaison statements to ITU-R Groups |
|
Word
�
|
200192 bytes |
2009-10-15 |
[278]�Annex 18
- Preliminary working document towards implementation of Resolution 80 (Rev.WRC-07) - Stage 1 of the Working Party 4A Work Plan |
|
Word
�
|
168448 bytes |
2009-10-14 |
[278]�Annex 17
- Correspondence Group on the efficient use of the spectrum/orbit resource |
|
Word
�
|
358912 bytes |
2009-10-15 |
[278]�Annex 16
- Survey of submissions in the 21.4-22 GHz band (WRC-12 Agenda item 1.13) |
|
Word
�
|
419328 bytes |
2009-10-15 |
[278]�Annex 15
- Working document towards the development of draft CPM text on WRC-12 Agenda item 1.13
|
|
Word
�
|
223232 bytes |
2009-10-12 |
[278]�Annex 14
- Elements towards draft CPM text on WRC-12 Agenda item 7 - Possible correction to the averaging bandwidth prescribed in Annex 2 of Appendix 4 to the Radio Regulations |
|
Word
�
|
239616 bytes |
2009-10-12 |
[278]�Annex 13
- Working document on balancing the existing FSS spectrum allocations in ITU Region 2 and Region 3 in the 10-15 GHz band |
|
Word
�
|
552960 bytes |
2009-10-13 |
[278]�Annex 12
- Working document towards a preliminary draft revision of Report ITU-R BO.2071 - System parameters of BSS between 17.3 GHz and 42.5 GHz and associated feeder links |
|
Word
�
|
332288 bytes |
2009-10-13 |
[278]�Annex 11
- Working document towards a preliminary draft revision of Recommendation ITU-R S.732 - Method for statistical processing of earth-station antenna side-lobe peaks |
|
Word
�
|
936448 bytes |
2009-10-12 |
[278]�Annex 10
- Working document towards a preliminary draft revision of Recommendation ITU-R BO.1785 - Intra-service sharing criteria for GSO BSS systems in the band 21.4-22.0 GHz in Regions 1 and 3 |
|
Word
�
|
207360 bytes |
2009-10-12 |
[278]�Annex 09
- Working document towards a preliminary draft new Recommendation ITU-R [SF].[STATMETH] - Methodology for calculating the interference received by the fixed service from space-to-Earth emissions for frequency bands above about 17 GHz |
|
Word
�
|
287744 bytes |
2009-10-13 |
[278]�Annex 08
- Working document towards a preliminary draft new Recommendation - An analytical methodology to evaluate interference into NGSO-to-NGSO ISS from the emissions of SRS earth stations |
|
Word
�
|
253952 bytes |
2009-10-12 |
[278]�Annex 07
- Working document towards a preliminary draft new Recommendation ITU-R S.[COOR_METH] - Delta C/(N+I) COORDINATION METHODOLOGY |
|
Word
�
|
1305600 bytes |
2009-10-13 |
[278]�Annex 06
- Preliminary draft new Report ITU-R S.[MAIN LOBE] - Methodology on the modelling of earth station antenna gain in the region of the antenna main lobe and the transition region between the minimum angle of the reference antenna pattern and the main lobe |
|
Word
�
|
3769344 bytes |
2009-10-12 |
[278]�Annex 05
- Preliminary draft new Report ITU-R S.[BWA-FSS] - Studies on compatibility of broadband wireless access (BWA) systems and fixed-satellite service (FSS) networks in the 3 400-4 200 MHz band
|
|
Word
�
|
316928 bytes |
2009-10-12 |
[278]�Annex 04
- Preliminary draft new Report ITU-R S.[GUIDE_PLAN] - Guidelines that may be used by administrations in the design of their systems for assessing the impact of rain attenuation on the carrier to noise plus interference ratios of the FSS Plan allotments |
|
Word
�
|
195584 bytes |
2009-10-9 |
[278]�Annex 03
- Preliminary draft revision of Recommendation ITU-R S.725 - Technical characteristics for very small aperture terminals (VSATs) |
|
Word
�
|
1344512 bytes |
2009-10-12 |
[278]�Annex 02
- Preliminary draft revision of Recommendation ITU-R BO.1659 - Mitigation techniques for rain attenuation for broadcasting-satellite service systems in frequency bands between 17.3 GHz and 42.5 GHz |
|
Word
�
|
304640 bytes |
2009-10-12 |
[278]�Annex 01
- Preliminary draft revision of Recommendation ITU-R BO.1776 - Reference power flux-density for the broadcasting-satellite service in the band 21.4-22 GHz in Regions 1 and 3 |
|
Word
�
|
358400 bytes |
2009-10-15 |
[278]�
- Report on the meeting of Working Party 4A (Geneva, 9-18 September 2009) |
|
|