International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : WP8D : Contributions : 85 Recently posted�-� Search Meeting Documents
[85]� Draft study on the determination of feasibility and practicability of prioritization and real-time pre-emptive access to ensure spectrum availability and protection for the AMS(R)S between different networks of MSS in the bands 1 525-1 559 MHz and 1 626.5-1 660.5 MHz

Format

Size

Posted

English

Word

240128 bytes 2004-08-31 [85]�

Document :

ITU-R�WP8D� Contribution� 85

Title :

Draft study on the determination of feasibility and practicability of prioritization and real-time pre-emptive access to ensure spectrum availability and protection for the AMS(R)S between different networks of MSS in the bands 1 525-1 559 MHz and 1 626.5-1 660.5 MHz

Date :

2004-08-31

Source :

Japan

Access :

Restricted to TIES users�[ITU-R]

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2004-08-31