|
Format |
Size |
Posted |
|
|
|
English |
Word
�
|
69120 bytes |
2004-11-04 |
[44]�Annex 8
- List of output (Temporary) documents |
|
Word
�
|
54784 bytes |
2004-11-04 |
[44]�Annex 7
- Liaison statement to Working Party 4A - Request for clarification on the assumptions used to derive the number of active HIO satellites operating in the 17.7-19.7 GHz frequency band |
|
Word
�
|
108544 bytes |
2005-04-22 |
[44]�Annex 6
- Liaison statement to WP 3M for action and WP 9A for information - Further studies on FS protection criteria to be considered with respect to |
|
Word
�
|
76800 bytes |
2004-11-04 |
[44]�Annex 5
- Element for the Chairman's Report - Results of discussions on sharing between certain types of non-geostationary-satellite systems in the fixed-satellite service and stations in the fixed service in the 17.7-19.7 GHz band |
|
Word
�
|
306176 bytes |
2004-11-04 |
[44]�Annex 4
- Preliminary draft revision of Annexes 1, 2 and 3 to Recommendation ITU-R SF.1649 - Guidance for determination of interference from earth stations on vessels (ESVs) to stations in the fixed service when the ESV is within the minimum distance |
|
Word
�
|
689664 bytes |
2004-11-04 |
[44]�Annex 3
- PDRR ITU-R SF.1601-1 - Methodologies for interference evaluation from the downlink of the fixed service using high altitude platform stations to the uplink of the fixed-satellite service using the geostationary satellites within the band 27.5-28.35 GHz |
|
Word
�
|
60416 bytes |
2004-11-04 |
[44]�Annex 2
- New assignments of categories to WP 4-9S Questions |
|
Word
�
|
55296 bytes |
2004-11-03 |
[44]�Annex 1
- Structure of Sub-Working Parties and allocation of documents |
|
Word
�
|
81408 bytes |
2004-11-04 |
[44]�
- Report on the meeting of Working Party 4-9S (Geneva, 4-11 October 2004) |
|
|