Page 23 - U4SSC Verification Report, Anyang, Korea (Republic of), November 2023
P. 23
7 KPIs Not Reported
KPI Number Description
EC: ICT: ES: 1C Smart Electricity Meters
EC: I: ES: 1C Electricity System Outage Frequency
EC: I: ES: 2C Electricity System Outage Time
EC: I: B: 1A Public Building Sustainability
EC: I: B: 2A Integrated Building Management Systems in Public Buildings
EN: EN: EQ: 2A Noise Exposure
EN: EN: PSN: 2A Green Area Accessibility
8 KPIs Not Verified
All reported KPIs were verified.
9 Next Steps
Anyang is encouraged to focus on KPIs that have been reported as falling within the benchmarks
of 0 – 33 % and 33 – 66 % of targets, determine which of these KPIs indicates critical issues for the
city, and develop plans for improvement.
Anyang is encouraged to review the KPIs for which no data were reported and determine plans
for future data collection and reporting.
Anyang is encouraged to continue ongoing data collection to determine trends in performance
against benchmarks over time.
Anyang is encouraged to stay engaged within the U4SSC process and continue to provide feedback
on KPIs and benchmarks.
Verification Report | Anyang, Korea (Republic of) | November 2023 15