Page 23 - U4SSC Verification Report, Anyang, Korea (Republic of), November 2023
P. 23

7     KPIs Not Reported



                   KPI Number                                      Description
              EC: ICT: ES: 1C         Smart Electricity Meters
              EC: I: ES: 1C           Electricity System Outage Frequency
              EC: I: ES: 2C           Electricity System Outage Time
              EC: I: B: 1A            Public Building Sustainability
              EC: I: B: 2A            Integrated Building Management Systems in Public Buildings
              EN: EN: EQ: 2A          Noise Exposure
              EN: EN: PSN: 2A         Green Area Accessibility



            8     KPIs Not Verified


            All reported KPIs were verified.




            9     Next Steps


            Anyang is encouraged to focus on KPIs that have been reported as falling within the benchmarks
            of 0 – 33 % and 33 – 66 % of targets, determine which of these KPIs indicates critical issues for the
            city, and develop plans for improvement.


            Anyang is encouraged to review the KPIs for which no data were reported and determine plans
            for future data collection and reporting.


            Anyang is encouraged to continue ongoing data collection to determine trends in performance
            against benchmarks over time.

            Anyang is encouraged to stay engaged within the U4SSC process and continue to provide feedback
            on KPIs and benchmarks.
























                                                           Verification Report | Anyang, Korea (Republic of) | November 2023  15
   18   19   20   21   22   23   24   25   26   27   28