Executive summary of the SG11 meeting (Geneva, 22-29 April 2015)
Study Group 11 meeting was held in Geneva, from 22-29 April 2015 and was attended by 123 delegates from 31 countries. Along with face-to-face meetings, most sessions from various Questions or joint Questions meetings were supported by remote participation capabilities.
1 Approved and Consented Recommendations (ITU-T A.8)
The following table shows the 'Approved" draft Recommendations.
# | Question | WP/11 | Recommendation | Title | Final TD PLEN | A.5 justification |
1 | 2/11 | 1/11 | ITU-T Q.3615 (ex Q.ProGeoSMS) | Protocol for GeoSMS | TD 628-add1 (GEN/11) | TD 730 (GEN/11) |
The following table shows the 'Consented' draft Recommendations.
# | Question | WP/11 | Recommendation | Title | Final TD PLEN | A.5 justification |
1 | 1/11 | 1/11 | ITU-T Q.3051 (ex Q.DSNSA) | Signalling Architecture for the Control Plane of Distributed Service Networking | TD 696 Rev.1 (GEN/11) | TD 697 Rev.1 (GEN/11) |
2 | 2/11 | 1/11 | ITU-T Q.3616 (Q.CDIV) | Communications Diversion protocol specification as NGN Supplementary Service | TD 773 (GEN/11) | TD 774 (GEN/11) |
3 | 2/11 | 1/11 | ITU-T Q.3652* [3GPP Release 10] | Terminating Identification Presentation and Terminating Identification Restriction using IP Multimedia core network subsystem. Protocol specification | TD 772 Rev.1 (GEN/11) | TD 787 (GEN/11) |
4 | 9/11 | 3/11 | ITU-T X.626** (X.mp2p-arch) | Managed P2P communications: Functional architecture | TD 770 Rev.1 (GEN/11) | N/A |
5 | 10/11 | 4/11 | ITU-T Q.3951 (Q.IP-FAX-testing) | Real-time Internet Protocol based on the ITU-T T.38 supporting facsimile service testing framework at the user-to-network interface of next generation networks | TD 733 Rev.2 (GEN/11) | TD 741 Rev.1 (GEN/11) |
6 | 10/11 | 4/11 | ITU-T Q.3933 (Q.39zz) | Reference benchmarking, background traffic profiles and KPIs for VoIP and FoIP in fixed networks" | TD 726 Rev.1 (GEN/11) | TD 764 (GEN/11) |
7 | 10/11 | 4/11 | ITU-T Q.3932.3 | IMS/NGN Performance Benchmark: Part 3: Traffic Sets and Traffic Profiles | TD 724 Rev.1 (GEN/11) | N/A |
8 | 10/11 | 4/11 | ITU-T Q.3932.2 | IMS/NGN Performance Benchmark Part 2: Subsystem Configurations and Benchmarks | TD 723 Rev.1 (GEN/11) | TD 740 (GEN/11) |
9 | 10/11 | 4/11 | ITU-T Q.3932.1 | IMS/NGN Performance Benchmark Part 1: Core Concept | TD 722 Rev.1 (GEN/11) | TD 737 (GEN/11) |
10 | 10/11 | 4/11 | ITU-T Q.3931.4 | Performance benchmark for the PSTN/ISDN emulation subsystem of an IP multimedia system - Part 4: Reference Load network quality parameters | TD 721 Rev.1 (GEN/11) | TD 738 (GEN/11) |
11 | 11/11 | 4/11 | ITU-T Q.3942.3 v.1 [3GPP Release 10] | Conformance test specification for the terminating identification restriction using IP multimedia core network subsystem - Part 3: User side; Test Suite Structure and Test Purposes | TD 745 (GEN/11) | N/A |
12 | 11/11 | 4/11 | ITU-T Q.3942.2 v.1 [3GPP Release 10] | Conformance test specification for the terminating identification restriction using IP multimedia core network subsystem - Part 2: Network side; Test Suite Structure and Test Purposes | TD 744 Rev.1 (GEN/11) | N/A |
NOTES:
*The consented
Recommendation ITU-T Q.3652, which was eventually approved following AAP-59,
was renumbered as ITU-T Q.3617 (August 2015) in agreement with SG11 management
**The consented Recommendation ITU-T X.626, which was eventually approved following AAP-59, was renumbered as ITU-T X.609 (August 2015) in agreement with SG11 management
2. Supplements, Handbooks, Technical Papers, Guidelines and Corrigenda
2.1 Supplements
The following table shows the approved Supplement.
# | Question | WP/11 | Draft new/revised Rec. No. | Title | Final TD PLEN |
1 | 4 | 2/11 | Supplement 67 to ITU-T Q-series Recommendations (Q.Supplement-SDN) | Framework of signalling for Software Defined Networking | TD 765 (GEN/11) |
2.2 Guidelines
The following table shows the approved SG11 Guidelines
# | Question | WP/11 | Draft new/revised Rec. No. | Title | Final TD PLEN |
1 | 11/11 | 4/11 | ITU-T Q.TL-rec-pro | Testing Laboratories recognition procedure | TD 729 Rev.1 (GEN/11) |
Note: A reservation was expressed by USA and UK on the above guidelines.
2.3 Handbooks
No Handbooks were approved at this meeting.
2.4 Technical Papers
No Technical papers were approved at this meeting.
2.5 Corrigenda
No Corrigenda were approved at this meeting.
3 SG11 Structure and Management Mr Dmitry Tarasov resigned as a vice-chairman of WP4/11. Mr Andrey Koucheryavy was appointed as the new WP4/11 vice-chairman. The meeting welcomed the appointment of Mr Koucheryavy who is a well-known expert in SG11 and served as WP4/11 Chairman for the past two Study Periods. Mr Tarasov was thanked for his service to SG11 and his experience and expertise will be solely missed. .
SG11 structure and Management team was therefore confirmed as follows:
WP1: Signalling requirements and protocol for emerging networks
(Questions: 1, 2, 3/11)
WP 1 Chairman: Xiaojie Zhu (China Telecom),
WP 1 Vice-chair: Vacant
WP2: Software-Defined Networking (SDN) and resource control
(Questions: 4, 5, 6/11)
WP 2 Co-Chairman: Kaoru Kenyoshi (NEC Europe Ltd.)
WP 2 Co-Chairman: Tina Tsou (Huawei Technologies Co., Ltd.)
WP3: Attachment and service networking, including IoT and M2M
(Questions: 7, 8, 9/11)
WP 3 Chairman: Shin-Gak Kang (ETRI)
WP 3 Vice-chair: Isaac Boateng (Ghana)
WP4: Conformance and Interoperability (C&I) testing
(Questions: 10, 11, 12, 13, 14, 15/11)
WP 4 Chairman: Martin Brand (A1 Telekom Austria AG)
WP 4 Vice-chair: Andrey Koucheryavy (Russian Federation)
4 Questions
There were no changes in the Questions texts at this meeting.
SG11 Management brainstormed on preliminary thoughts about SG11 future work in view of WTSA-16 and possible restructuring. The WP Chairs and Question Rapporteurs were requested to provide thoughts on relationship between SG11 Questions and four strategic areas of study: 5G, IoT/Smart Cities, Trust/infrastructure and Open Source. A table resulted from this exercise and was posted as TD 805 Rev.1 (GEN/11). It will be kept as a living list and updated as required by SG11 in the future.
5 Liaison officers and Rapporteurs
SG11 approved the appointment of new Rapporteurs and Associate Rapporteurs as follows:
- Eva IBARROLA (University of the Basque, Spain) was appointed as Rapporteur for Q15/11
- Jongmin LEE (SK Telecom, Korea) was appointed as Associate Rapporteur for Q7/11
The final list of Rapporteurs and Associate Rapporteurs can be found in TD 614 Rev.1 (GEN/11).
SG11 approved the appointment of new liaison officers and representatives as follows:
- Kaoru KENYOSHI (NEC, Japan) was appointed as liaison officer to ITU-T SG12
- Kai HU (Huawei Technologies Co. Ltd, China) was appointed as liaison officer to ITU-T SG17
- Andrey KOUCHERYAVY (Russia) was appointed as liaison officer for JCA-CIT
- Tina TSOU (Huawei Technologies Co. Ltd, China) was appointed as liaison office for JCA-COP and JCA-Res178
- Jia HE (Huawei Technologies Co. Ltd, China) was appointed as liaison officer for JCA-SDN
- Tina TSOU (Huawei Technologies Co. Ltd, China) and Kaoru KENYOSHI (NEC, Japan) were appointed as liaison officers for Public Relations
- Cheng LI (China Academy of Information and Communications Technology (CAICT) MIIT) was appointed as liaison officer for E-health related studies in SG11
The final list of Liaison Officers and representatives can be found in TD 613 Rev.2 (GEN/11).
6 Approval of Qualification according to Recommendation ITU-T A.5
The Qualification according to Recommendation ITU-T A.5 was approved by ITU-T SG11 for the Open Geospatial Consortium (OGC). In brief, this allows referencing OGC specifications in ITU-T Recommendations.
7 Progress in combating counterfeiting of ICT devices
Work to combat counterfeit ICT devices was progressed by Q8/11. The meeting decided to start developing a normative Recommendation "Framework for solution to combat counterfeit ICT Devices", which will be approved via TAP. In parallel, two additional Technical Reports will be developed: "TR on Guidelines on Best Practices and Solutions in the Combating of Counterfeit ICT Devices" and "TR on Methodologies and use cases for combating the substandard and unauthorized telecommunication/ICT devices". In addition, the TR on "Counterfeiting ICT Equipment" will be revised.
A demonstration on "a solution to combat Counterfeiting of ICT products based on the Digital Object Architecture" was welcomed by participants.
8 Establishment of the ITU-T Conformity Assessment Steering Committee (CASC)
Study Group 11 has established the ITU-T Conformity Assessment Steering Committee (CASC). It will report to SG11 and will manage the recognition procedures of Testing Laboratories (TLs) according to the terms of references found in TD 729 Rev.1 (GEN/11). Isaac BOATENG (National Communications Authority, Ghana) was appointed as the Chairman of the ITU-T CASC.
ITU-T CASC's main objectives are:
- to provide the ITU-T view and position to the management organs of the established Conformity Assessment Systems and Schemes of the IEC and ILAC;
- to set up criteria, rules and procedures for the appointment of ITU-T technical experts by working with established Conformity Assessment Systems and Schemes of IEC, in collaboration with ILAC aiming for a common testing and conformity assessment;
- to process applications from candidate experts from ITU-T membership;
- to appoint the ITU-T technical expert(s);
- to recognize TL with a scope of ITU-T Recommendation(s) which is assessed by IEC or by ILAC accreditation bodies and register it in the ITU recognized TL list;
ITU-T CASC will mostly work electronically using electronic working methods and have face-to-face meetings which will normally occur concurrently with SG11 meetings. Meetings will follow the working rules and procedures which are applied to a Working Party.
9 Other Conformance and Interoperability (C&I)-related outcomes
ITU-T WP4 has agreed on a standardization work plan for SIP-IMS TD 753 Rev.1 (GEN/11). It will include standards of requirements and relevant test specifications of basic call and some supplementary services, which are applied to fixed networks. ITU-T SG11 will collaborate with ETSI TC INT, plans to endorse some ETSI standards and develop the missing standards/test suites. Also a joint meeting among ETSI TC INT and SG11 Questions 10, 11 and 15/11 is scheduled in Vienna, Austria, 8-10 September 2015. A similar work plan has been approved for Benchmarking.
ITU-T SG11 WP4 has progressed work on C&I issues. Relevant updates are provided as follows:
- Living list of key technologies which are suitable for C&I Testing (TD 754 (GEN/11), http://itu.int/go/key-technologies)
- The reference table of standards used for C&I assessment (TD 756 (GEN/11), http://itu.int/go/reference-table)
- Pilot projects for conformity assessment against ITU-T Recommendations (TD 755 (GEN/11), http://1f8a81b9b0707b63-19211.webchannel-proxy.scarabresearch.com/go/pilot-projects)
In addition, Question15/11 has progressed work on the draft Recommendation Q.Int_speed_test "Unified methodology of Internet speed quality measurement usable by end-users on the fixed and mobile networks". Following a presentation from OECD a liaison statement was prepared to propose collaboration between SG11 and OECD aiming to explore the future adoption of draft ITU framework which can be used for regulation of the broadband speed access connection.
10 Outgoing Liaison StatementsThe following table shows the list of the twenty-two agreed outgoing liaison statements. See
TD 611 (GEN/11)
# | WP | Q (s) | For: | To: | Title | Reference |
1 | PL | All | Info | JCA-Res178 | LS/o/r on input to JCA-Res178 (reply to JCA-Res178 - LS 4 and JCA-Res178 - LS 8) [to JCA-Res178] | TD 692 (GEN/11) |
2 | PL | All | Info | ETSI ISG IP6 | LS/o on IPv6 related work items under study by ITU-T Q6/11 [to ETSI ISG IP6] | TD 811 (GEN/11) |
3 | 1 | 1 | Info | APT Standardization Forum (ASTAP) | LS/o/r on reply LS to ASTAP on APT report on E-health [to ASTAP] | TD 762 Rev.1 (GEN/11) |
4 | 2 | 4, 5, 6 | Info | JCA-SDN | LS/o/r on SDN standardization activity roadmap (reply to JCA-SDN - LS 4 -E) [from JCA-SDN] | TD 804 Rev.1 (GEN/11) |
5 | 3 | 8 | Info | ITU-T SG2, ITU-T SG5, ITU-T SG17, ITU-D SG1&2, GSMA, RCC, CITEL, ATU, ASTAP | LS/o on the progress on standardization work to combat Counterfeit ICT devices [to ITU-T SG2, ITU-T SG5, ITU-T SG17, ITU-D SG1&2, GSMA, CITEL, RCC, ATU, ASTAP] | TD 789 Rev.2 (GEN/11) |
6 | 3 | 9 | Info | ISO/IEC JTC 1/SC 6 | LS/o on collaboration with ISO/IEC JTC 1/SC 6 on managed P2P communications [to ISO/IEC JTC 1/SC 6] | TD 788 (GEN/11) |
7 | 4 | 10 | Info | ITU-T SG12, JCA-CIT | LS/o/r on revision of G.1000 and move towards a QoE framework [to ITU-T SG12] | TD 695 (GEN/11) |
8 | 4 | 10 | Info | ITU-T SG16 (Q15/16) | LS/o – to inform on Consent of ITU-T Q.IP-FAX-testing "Real-time Internet Protocol based on the T.38 supporting facsimile service testing framework at the user-to-network interface of next generation networks" [to ITU-T SG16] | TD732 Rev.1 (GEN/11) |
9 | 4 | 11 | Action/Info | SG16 (Q13/16) / JCA-CIT | LS/o/r on updated living list of key technologies, reference table of ITU-T Recommendations which are suitable for C&I and relevant pilot projects (reply COM11-LS55) [to ITU-T SG16] | TD 790 (GEN/11) |
10 | 4 | 11 | Info | JCA-CIT, IMTC | LS/o/r on conformity assessment of ICT equipment based on SIP-IMS profile against ITU-T Recommendations (reply to IMTC LS3) [to IMTC] | TD 791 (GEN/11) |
11 | 4 | 11 | Info | SG9, JCA-CIT | LS/o/r on request to all SGs to follow up on the Council 2013 C&I Action Items for implementation by ITU-T SGs (reply to SG9 - LS 90) [to ITU-T SG9] | TD 792 (GEN/11) |
12 | 4 | 11 | Info | SG12, JCA-CIT | LS/o/r on pilot project on the Recommendation ITU-T P.381 (reply to COM 12 LS 68) [to ITU-T SG12] | TD 793 (GEN/11) |
13 | 4 | 11 | Action/Info | SG16/JCA-CIT | LS/o/r on collaboration between ITU-T and testing laboratories for ITU C&I programme (reply to SG16 LS94) [to ITU-T SG16] | TD 794 (GEN/11) |
14 | 4 | 11 | Info | SG15, JCA-CIT | LS/o/r on living list of key technologies (reply to SG15-LS181) [to ITU-T SG15] | TD 795 (GEN/11) |
15 | 4 | 11 | Action/Info | SG15/JCA-CIT | LS/o/r on an Implementers' Guide for Recommendation ITU-T G.9801 (Conformance and interoperability tests for OMCI-EPON) (reply to SG15 LS185) [to ITU-T SG15] | TD 796 (GEN/11) |
16 | 4 | 11 | Info | JCA-CIT, ITU-D SG2 | LS/o/r on Q4/2 work items for the 2014-2018 study period (reply to ITU-D SG2 Document 2/111-E) [to ITU-D SG2] | TD 797 (GEN/11) |
17 | 4/PL | 11 | Info | ITU-D SG2, JCA-CIT | LS/o/r on Universal catalogue of stakeholders involved in conformity assessment system (reply to ITU-D SG2 Document 2/110-E) [to ITU-D SG2] | TD 798 (GEN/11) |
18 | 4 | 11 | Info | SG2, JCA-CIT | LS/o/r on Mobile Number Portability conformity testing against ITU-T Q.suppl.4 (reply to SG2 LS87) [to ITU-T SG2 and JCA-CIT] | TD 799 (GEN/11) |
19 | 4 | 11 | Action/Info | ETSI TC INT/JCA-CIT, ETSI TC STQ | LS/o on joint collaboration between WP4/11 and ETSI TC INT on SIP-IMS conformance testing activities [to ETSI TC INT and STQ] | TD 800 Rev.1 (GEN/11) |
20 | 4/PL | 11 | Action/Info | all ITU-T SGs/JCA-CIT, TSAG | LS/o on approval of SG11 Guidelines on "Testing Laboratories recognition procedure" (ex. Q.TL-rec-pro) and first meeting of ITU-T CASC [to all ITU-T SGs and TSAG] | TD 801 (GEN/11) |
21 | 4 | 11 | Action/Info | ITU-D SG2, CCV, SCV/JCA-CIT | LS/o/r on C&I vocabulary (reply to ITU-D SG 2 - Document 2/111-E -E) [to ITU-D SG2, CCV & SCV] | TD 802 (GEN/11) |
22 | 4 | 15 | Action/Info | OECD WP-CISP/JCA-CIT | LS/o on ITU-T SG-11 relevant activities of Q15 on Internet Speed Measurements [to OECD WP-CISP and JCA-CIT] | TD 763 (GEN/11) |
11 Approved new work items
# | Q | Work item | Status | Title | Editor | Timing | Reference |
1 | Q2/11 | Q.34_SI_BC_Req v.1 [3GPP Release 10] | New | IP multimedia call control protocol based on the session initiation protocol and the session description protocol. Basic call. Requirements for user side and network side (V10.18.0) | Martin Brand martin.brand@a1telekom.at | 2015-12 | TD 775 (GEN/11) |
2 | Q2/11 | Q.36_SI_SS_Req_OIP_OIR v.1 [3GPP Release 10] | New | OIP and OIR using IP Multimedia core network subsystem. Protocol specification | Martin Brand martin.brand@a1telekom.at | 2015-12 | TD 776 (GEN/11) |
3 | Q2/11 | Q.36_SI_SS_Req_HOLD v.1 [3GPP Release 10] | New | Communication HOLD using IP multimedia core network subsystem. Protocol specification | Martin Brand martin.brand@a1telekom.at | 2015-12 | TD 777 (GEN/11) |
4 | Q2/11 | Q.36_SI_SS_Req_CDIV v.1 [3GPP Release 10] | New | Communication Diversion (CDIV) using IP multimedia core network subsystem. Protocol specification | Martin Brand martin.brand@a1telekom.at | 2015-12 | TD 778 (GEN/11) |
5 | Q2/11 | Q.36_SI_SS_Req_CONF v.1 [3GPP Release 10] | New | CONF using IP multimedia core network subsystem. Protocol specification | Martin Brand martin.brand@a1telekom.at | 2015-12 | TD 779 (GEN/11) |
6 | Q2/11 | Q.36_SI_SS_Req_CW v.1 [3GPP Release 10] | New | CW using IP multimedia core network subsystem. Protocol specification | Martin Brand martin.brand@a1telekom.at | 2015-12 | TD 780 (GEN/11) |
7 | Q2/11 | Q.36_SI_SS_Req_ECT v.1 [3GPP Release 10] | New | ECT using IP multimedia core network subsystem. Protocol specification | Martin Brand martin.brand@a1telekom.at | 2015-12 | TD 781 (GEN/11) |
8 | Q2/11 | Q.36_SI_SS_Req_MCID v.1 [3GPP Release 10] | New | MCID using IP multimedia core network subsystem. Protocol specification | Martin Brand martin.brand@a1telekom.at | 2015-12 | TD 782 (GEN/11) |
9 | Q2/11 | Q.36_SI_SS_Req_CC v.1 [3GPP Release 10] | New | CCBS and CCNR using IP multimedia core network subsystem. Protocol specification | Martin Brand martin.brand@a1telekom.at | 2015-12 | TD 783 (GEN/11) |
10 | Q2/11 | Q.36_SI_SS_Req_MWI v.1 [3GPP Release 10] | New | MWI using IP multimedia core network subsystem. Protocol specification | Martin Brand martin.brand@a1telekom.at | 2015-12 | TD 784 (GEN/11) |
11 | Q2/11 | Q.36_SI_SS_Req_CUG v.1 [3GPP Release 10] | New | CUG using IP multimedia core network subsystem. Protocol specification | Martin Brand martin.brand@a1telekom.at | 2015-12 | TD 785 (GEN/11) |
12 | Q2/11 | Q.36_SI_SS_Req_ACR v.1 [3GPP Release 10] | New | ACR and CB using IP multimedia core network subsystem. Protocol specification | Martin Brand martin.brand@a1telekom.at | 2015-12 | TD 786 (GEN/11) |
13 | Q4/11 | Q.SMO | New | Signalling requirements of Software-defined Metro Orchestration | Wei Jian jianwei@chinaunicom.cn | 2017-12 | TD 760 (GEN/11) |
14 | Q5/11 | Q.BNG-DBoD | New | Signalling requirements for dynamic bandwidth adjustment on broadband network gateway implemented by SDN technologies | Aipeng Guo guoap7@chinaunicom.cn Guangtao zhou zhouguangtao@chinaunicom.cn Kai Hu kevinkai.hu@huawei.com Junfeng Ma majunfeng@catr.cn | 2017-06 | TD 743 (GEN/11) |
15 | Q8/11 | TR-Counterfeit-rev | Rev | Technical Report on Counterfeit ICT Equipment" | David Rogers, david.rogers1@bis.gsi.gov.uk João Alexandre Zanon, Brazil, zanon@anatel.gov.br | 2015-12 | TD 698 Rev.1 (GEN/11) |
16 | Q8/11 | Q.FW_CCF | New | Framework for solution to combat counterfeit ICT Devices | João Alexandre Zanon zanon@anatel.gov.br Isaac Boateng isaac.boateng@nca.org.gh | 2016 | TD 736 Rev.1 (GEN/11) |
17 | Q8/11 | TR-Sub_Una | New | Technical Report on Methodologies and use cases for combating the substandard and unauthorized telecommunication/ICT devices | Dymetro,Ukraine, protsenko@ucrf.gov.ua João Alexandre Zanon, Brazil, zanon@anatel.gov.br | 2016 | C 269 Rev.1 |
18 | Q8/11 | TR-CF_BP | New | Technical Report – Guidelines on Best Practice and Solutions for Combating Counterfeit ICT Devices | João Alexandre Zanon, Brazil, zanon@anatel.gov.br | 2016 | C 273 Rev.1 |
19 | Q11/11 | Q.39_SI_BC_Net_TS_Part3 V.1 [3GPP Release 10] | New | IMS specific use of SIP and SDP. Conformance testing. Part 3: ATS and PIXIT | Martin Brand martin.brand@a1telekom.at | 2015-12 | TD 750 Rev.1 (GEN/11) |
20 | Q11/11 | Q.39_SI_BC_Net_TS_Part1 V.1 [3GPP Release 10] | New | IMS specific use of SIP and SDP. Conformance testing. Part 1: PICS | Martin Brand martin.brand@a1telekom.at | 2015-12 | TD 748 Rev.1 (GEN/11) |
21 | Q11/11 | Q.3941.1-rev [3GPP Release 10] | Rev | Network integration testing between SIP and ISDN/PSTN network signalling protocols – Part 1: Test suite structure and test purposes for SIP-ISDN) | Martin Brand martin.brand@a1telekom.at | 2015-12 | TD 752 Rev.1 (GEN/11) |
22 | Q11/11 | Q.MNP_TS | New | Conformance test plan for Number Portability requirements defined by ITU-T Q.Suppl.4 | Vadim Plahov plahov@zniis.ru Igor Bukharev bukharev@zniis.ru | 2016 | TD 751 Rev.1 (GEN/11) |
23 | Q12/11 | Q.39_IoT_MN_test | New | The architecture and facilities of Model network for IoT testing | Andrey Koucheryavy, akouch@mail.ru Ruslan Kirichek, ruslan.stk@gmail.com | 2016 | TD 759 Rev.1 (GEN/11) |
24 | Q14/11 | Q.infra-iop | New | Interoperability testing of infrastructure capabilities type | HE Xiaowu, hexw@gsta.com Junko Iwasaki j-iwasaki@cd.jp.nec. com | 2017-Q2 | TD 758 Rev.1 (GEN/11) |
12 Work plan for interim Working Party and Rapporteur meetings
The following represents the interim meetings plan as agreed at SG11 Plenary (Geneva, 22-29 April 2015).
12.1 Working parties
No interim Working Parties meetings will be held before next SG11 meeting.
12.2 Rapporteur groupsQuestion/WP | Date | Place / Host | Terms of reference | Contact |
Joint 4/11, 6/13 | 1st week June 2015 (specific date TBD) | E-meeting | - Progress Q.CSO | Jia He hejia@huawei.com |
1/11 | 13-17 July 2015 | Geneva/ITU | - Q.Arc-IPSMS, Q.M2M_pro_overview - Consider any new work item(s) - Report and output review | Xiaojie Zhu zhuxj@gsta.com
|
3/11 | 13-17 July 2015 | Geneva/ITU | - Progress on TR-ETS-IL - Any new proposed work item | Viqar Shaikh vshaikh@appcomsci.com |
4/11 | 13-17 July 2015 | Geneva/ITU | - Progress Q.SBAN - Progress Q.SMO - Progress Y.VNC and Q.CSO (jointly with Q6/13) - Progress on SDN standardization roadmap (jointly with Q14/13, Q2/13 and Q6/11) | Jia He hejia@huawei.com Bo Lei leibo@ctbri.com.cn Wei Jian jianwei@chinaunicom.cn
|
6/11 | 13-17 July 2015 | Geneva/ITU | - Progress on Q.IPv6ProBB; - Progress on Q.IPv6ProMM; - Progress on Q.IPv6UIP - Progress on SDN standardization roadmap (jointly with Q14/13, Q2/13 and Q6/11) | Cathy Zhou cathy.zhou@huawei.com |
14/11 | 13-17 July 2015 | Geneva/ITU | - Handle the input contributions - Consider new WIs - Progress on the open work items for Q14/11 | Hideo Himeno h-himeno@bc.jp.nec.com Nan Chen chenn@gsta.com |
8/11 | 13-17 July 2015 (TBD) | E-meeting | - Discuss feedback from TSB Legal Department on the definition of substandard and unauthorized ICT devices | Isaac Boateng isaac.boateng@nca.org.gh João Alexandre Moncaio Zanon zanon@anatel.gov.br, Dmitro Protsenko protsenko@ucrf.goc.ua
|
9/11 | 7-11 September 2015 | E-meeting | - Progress all current work items of Q9/11 - Discuss new work item proposals | Shin-Gak Kang sgkang@etri.re.k |
10/11(Joint meeting with ETSI TC INT) | 8-10 September 2015 | Vienna, Austria/Telekom Austria | - Progress on the benchmarking work items | Martin Brand martin.brand@a1telekom.at |
11/11 (Joint meeting with ETSI TC INT) | 8-10 September 2015 | Vienna, Austria/Telekom Austria | - Progress on the SIP-IMS conformance testing standardization work plan and relevant work items | Martin Brand martin.brand@a1telekom.at |
15/11(Joint meeting with ETSI TC INT) | 8-10 September 2015 | Vienna, Austria/Telekom Austria | - Progress on Draft recommendation Q.Int_speed_test | Eva Ibarrola eva.ibarrola@ehu.es
|
14/11
| 14-15, October 2015 | E-meeting | - Handle the input contributions - Consider new WIs - Progress on the open work items for Q14/11 | Hideo Himeno h-himeno@bc.jp.nec.com Nan Chen chenn@gsta.com |
13 Next Study Group 11 meeting
The next SG11 meeting is scheduled in Geneva, 2-11 December 2015. It was agreed to anticipate the date of the last SG11 meeting before WTSA‑16. The meeting plan of SG11 and their associated Rapporteurs and WP meetings are as follows:
– Geneva, 13-17 July 2015 (Rapporteurs)
– Geneva, 2-11 December 2015 (back-to-back with WSC Workshop on Conformity Assessment, 1-2/12/2015)
– Geneva, 18-29 April 2016 (Rapporteurs/WPs)
– Geneva, 27 June-6 July 2016