AAP Recommendation

G.8273.2/Y.1368.2: Timing characteristics of telecom boundary clocks and telecom time synchronous clocks for use with full timing support from the network

Study Group
15

Study Period
2022-2024

Consent Date
2023-04-28

Approval Date
2023-06-13

Provisional Name


Input used for Consent
SG15-TD156-R1/PLEN (2023-04)

Status
A

IPR
Site

Recommendation ITU-T G.8273.2/Y.1368.2 specifies minimum requirements for time and phase for telecom boundary clocks and telecom time synchronous clocks used in synchronization network equipment that operates in the network architecture as defined in Recommendations ITU-T G.8271, ITU-T G.8271.1, ITU-T G.8275 and ITU-T G.8275.1. It supports time and/or phase synchronization distribution for packet-based networks. This version of the Recommendation only applies to full timing support from the network. These requirements apply under the normal environmental conditions specified for the equipment.

AAP Current Status
Step # Action
Start / End
Status Announcement Related documents Comments / Resolution logs