2
|
2.1 |
Approach
C (separation
of the modifications to the Plans
from the original Plans) |
2.2 |
Approaches A or B |
2.3 |
Coordination of
modifications to the Plans before their inclusion in the Plans |
2.4 |
Coordination
between earth stations
and terrestrial stations or between earth stations operating
in opposite direction of transmission |
2.5 |
Interference
situations not covered
in the current situation |
2.6 |
Protection of terrestrial service from modification to
the Appendix S30 Plan1 |
2.7 |
Space operation in
the guardbands of S30 and S30A |
2.8 |
Coordination area
around a BSS Feeder link earth station |
2.9 |
Footnotes S5.487 and
S5.490 |
|
|
Doc.
25, 154, 181, 185 |
Doc. 12, 13 (Add.5),
14 (Add.2), 20, 24, 30,
33, 35 (Add.13), 42, 43,
104, 115, 122, 126, 137 |
Doc. 3 (� 5.2.3.1)
(see Doc. DT/36), 13(Add.5),
14(Add.2), 20, 126
|
Doc.
3 (� 5.2.3.2)
(see Doc. DT/36), 13(Add.5),
14(Add.2), 20, 126 |
Doc.
3 (� 5.2.3.3)
(see Doc. DT/36), 13(Add.5),
14(Add.2), 20 |
Doc. 3 (� 5.2.3.5)
(see Doc. DT/36), 12,
13 (Add.5), 14 (Add.1),
24, 35 (Add.12) |
Doc.
3 (� 5.2.1)
(see Doc DT/36),
13 (Add.5), 33 |
Doc. 3 (� 5.2.2)
(see Doc. DT/36) |
Doc. 3 (�
5.2.3.3.5)
(see Doc. DT/36), 14 (Add.2),
20, 24, 35 (Add.11), 126 |
|
3 |
Agenda
item 1.19
3.1 |
Compatibility with other services1 |
3.2 |
Annex 7 of Appendix S301 |
|
|
Doc. 14 (Add.1), 20,
24,
34, 35 (Add.9), 45, 130,
154, 181, 185 |
Doc. 3 (� 5.3.1.2)
(see Doc. DT/36), 14 (Add.1),
20, 24, 34, 35 (Add.9),
104, 130, 154, 181, 185 |
|
4 |
Agenda
item 1.19
bis |
Doc.
3 (� 5.4)
(see Doc. DT/36), 12,
13 (Add.5), 14(Add.1), 24,
30, 31, 35 (Add.10), 81, 126 |