Union Internationale des T�l�communications UIT
EnglishEspa�ol
Plan du site Contactez-nous Copie Imprimable
Page d'accueil : UIT-T : SG02 : R�union�2023-03-13�: Contributions� Ajout�s r�cemment�-� Recherche de documents de r�union
UIT-T�SG02� C�(2023-03-13)�

UIT-T�SG02

Operational aspects

P�riode d'�tudes 2022

R�union� du 2023-03-13 au 2023-03-22

Lieu : E-Meeting

Autres r�unions : 2024-06-192024-03-112023-11-082022-05-16

Resultats:18 documents
Contributions �[�AI/Question:�Q5/2�]���Documents / Contributions

Num�ro
Titre Source AI/Question
Date
[ 97 ]
Proposed revised baseline text for M.rODFos: Requirements for Optical Distribution Frame (ODF) On-Site Smart Maintenance � Beijing University of Posts and Telecommunications (China) , State Grid Beijing Electric Power Research Institute (China) Q5/2 2023-02-28
[ 96 ]
Proposed new work item on: Management Requirements for industrial Internet network � Beijing University of Posts and Telecommunications (China) , State Grid Corporation of China Q5/2 2023-02-28
[ 94 ]
Proposed revised baseline text for M.rfmls: Management Requirements for Federated Machine Learning Systems: Proposed texts for management requirements � Beijing University of Posts and Telecommunications (China) , State Grid Corporation of China , State Grid Zhejiang Electric Power Co., Ltd. Research Institute (China) Q5/2 2023-02-28
[ 90 ]
Proposed revised baseline text for M.rmnoc-AI: Requirements for the management of network operation cost within AITOM in telecom operational aspects � China Telecommunications Corporation Q5/2 2023-02-28
[ 87 ]
Proposed revised baseline text for M.rcpnm: Requirements for Computing Power Network Management (modification for the section on functional requirements) � Beijing University of Posts and Telecommunications (China) , China Telecommunications Corporation , State Grid Corporation of China Q5/2 2023-02-28
[ 82 ]
Proposed new work item on: Operational Management Requirements for Federated Machine Learning based Services � China Telecommunications Corporation Q5/2 2023-02-27
[ 81 ]
Proposed new work item on: Requirements for smart maintenance of communication infrastructure based on unmanned aerial vehicles � China Telecommunications Corporation Q5/2 2023-02-27
[ 78 ]
Proposed new work item on: Requirements for AI capability management within AITOM � China Telecommunications Corporation Q5/2 2023-02-27
[ 77 ]
Proposed new work item on: Requirements for customer experience smart management of telecom services � China Telecommunications Corporation Q5/2 2023-02-27
[ 76 ]
Proposed revised baseline text for M.rla-AI: Requirements for Log Analysis with AI-enhanced Management System (for consent) � Beijing University of Posts and Telecommunications (China) , Inspur Communications Technology Co., Ltd. (China) , State Grid Beijing Electric Power Research Institute (China) Q5/2 2023-02-27
[ 75 ]
(Rev.1)
Proposed revised baseline text for M.rsca: Requirements for smart comprehensive analysis within AITOM (new text of Chapter 8) � Asiainfo Technologies (China), Inc. , China Telecommunications Corporation Q5/2 2023-02-27
[ 72 ]
Proposed revised baseline text for M.rrsp: Requirements for robot-based on-site smart patrol of telecommunication network (for consent) � Beijing University of Posts and Telecommunications (China) , State Grid Information & Telecommunication Group Co., Ltd. (China) Q5/2 2023-02-27
[ 70 ]
Proposed revised baseline text for M.rmbs: Requirements for management of blockchain system (for consent) � Beijing University of Posts and Telecommunications (China) , State Grid Corporation of China Q5/2 2023-02-27
[ 69 ]
Proposed revised baseline text for M.rsmca: Requirements for smart maintenance of cell antenna � China Telecommunications Corporation Q5/2 2023-02-27
[ 68 ]
Proposed new work item on: Requirement for service design within SOMM � China Telecommunications Corporation Q5/2 2023-02-27
[ 67 ]
Proposed new work item on: X interface requirement for telecom operation system and internet e-commerce platform � China Telecommunications Corporation Q5/2 2023-02-27
[ 66 ]
Proposed new work item on: Telecommunication preventive maintenance task - Overview � China Unicom Q5/2 2023-02-27
[ 65 ]
Proposed revised baseline text for M.rsca: Requirements for smart comprehensive analysis within AITOM �
China Telecommunications Corporation Q5/2 2023-02-27
Resultats:18 documents
T�l�chargement de multiples documents:�Cocher les cases correspondant aux documents s�lectionn�s, puis appuyer sur "T�l�charger"

Pr�f�rences utilisateur:
T�l�chargement de multiples documents:�Formats et langues � prendre en compte (si disponibles):
Pages de navigation HTML
Formats �+�Autres formats
Langues (maximum 2) �+�Multilingue�
(E: Anglais - F: Fran�ais - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Testez ITU Translate pour la traduction automatique de documents
D�but de page�-� Commentaires�-� Contactez-nous�-� Droits d'auteur � UIT�2008�Tous droits r�serv�s
Contact pour cette page :� TSB EDH
Mis � jour le :�2025-1-10