Contributions
�[�AI/Question:�Q2/15�]��� |
�
|
Num�ro�
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 2604 ]
�
� |
G.9804.3_20min_ Minutes of the 9th ad-hoc call on "50G DS PMD"
�
� |
Huawei Technologies Co., Ltd. (China)
,
Huawei Technologies D�sseldorf GmbH (Germany)
,
Maxlinear Inc (United States)
,
Nokia Corporation (Finland)
,
Nokia USA (United States)
,
Orange (France)
,
ZTE Corporation (China)
� |
Q2/15
� |
2021-03-30 |
|
[ 2603 ]
�
(Rev.1)� |
Reduced Dispersion Penalty at Lower Extinction Ratio in 50G PON Downstream Transmission
�
� |
Futurewei Technologies US R&D Center (United States)
� |
Q2/15
� |
2021-03-30 |
|
[ 2602 ]
�
� |
G.9804.3_20min _G.HSP 50G Downstream PMD Parameters
�
� |
Huawei Technologies Co., Ltd. (China)
,
Huawei Technologies D�sseldorf GmbH (Germany)
� |
Q2/15
� |
2021-03-30 |
|
[ 2601 ]
�
(Rev.1)� |
G.9804.3_15min _G.HSP PMD OLT Tx TDEC Test Procedure
�
� |
Huawei Technologies D�sseldorf GmbH (Germany)
,
Orange (France)
� |
Q2/15
� |
2021-03-30 |
|
[ 2600 ]
�
� |
G.9804.2_5min: Provisioning for flexible FEC in the upstream
�
� |
Maxlinear Inc (United States)
� |
Q2/15
� |
2021-03-30 |
|
[ 2598 ]
�
� |
G.988_3min: Proposal for G.hsp minimum burst spacing attribute
�
� |
Maxlinear Inc (United States)
� |
Q2/15
� |
2021-03-30 |
|
[ 2595 ]
�
� |
G.9804.2_7min: Minimum spacing between upstream bursts
�
� |
Maxlinear Inc (United States)
� |
Q2/15
� |
2021-03-30 |
|
[ 2594 ]
�
� |
G.9804.2_5min: Valid range of maximum upstream burst size
�
� |
Maxlinear Inc (United States)
,
Nokia Corporation (Finland)
� |
Q2/15
� |
2021-03-30 |
|
[ 2592 ]
�
� |
G.988_5min: Proposal for G.9804 ME addressing the maximum ONU service rate
�
� |
Maxlinear Inc (United States)
� |
Q2/15
� |
2021-03-30 |
|
[ 2591 ]
�
� |
G.9804.3_5min: Ad hoc reports on jitter definition
�
� |
Maxlinear Inc (United States)
� |
Q2/15
� |
2021-03-30 |
|
[ 2590 ]
�
� |
G.9804.3_10min: Proposal for jitter specification
�
� |
Futurewei Technologies US R&D Center (United States)
,
Maxlinear Inc (United States)
,
Nokia Corporation (Finland)
� |
Q2/15
� |
2021-03-30 |
|
[ 2584 ]
�
� |
G.9804.2_15mins_Extensible PLOAM messaging scheme for capabilities reporting/feature setting
�
� |
Nokia Corporation (Finland)
,
Nokia USA (United States)
� |
Q2/15
� |
2021-03-30 |
|
[ 2583 ]
�
� |
G.9804.2_10mins_Modifications to working text on upstream FEC
�
� |
Nokia Corporation (Finland)
,
Nokia USA (United States)
� |
Q2/15
� |
2021-03-30 |
|
[ 2582 ]
�
� |
G.9804.3_10min_Flexible OLT X/S tolerance mask for G.hsp
�
� |
Nokia USA (United States)
� |
Q2/15
� |
2021-03-30 |
|
[ 2577 ]
�
� |
G.9804.3_10min _G.HSP PMD OLT Tx Eye Mask Test Equaliser
�
� |
Huawei Technologies D�sseldorf GmbH (Germany)
,
Orange (France)
� |
Q2/15
� |
2021-03-30 |
|
[ 2573 ]
�
� |
G.9804.3_10min _ Lower Bound for Extinction Ratio in 50G downstream
�
� |
Huawei Technologies Co., Ltd. (China)
,
Huawei Technologies D�sseldorf GmbH (Germany)
� |
Q2/15
� |
2021-03-30 |
|
[ 2572 ]
�
� |
G.9804.2_5min_PLOAM extensibility
�
� |
Futurewei Technologies US R&D Center (United States)
� |
Q2/15
� |
2021-03-30 |
|
[ 2546 ]
�
� |
Heterodyne Detection for G.9804.4 25 Gbps C-band Upstream
�
� |
AEPONYX Inc. (Canada)
,
Calix Networks, Inc. (United States)
,
Verizon Communication Corporation (United States)
� |
Q2/15
� |
2021-03-30 |
|
[ 2544 ]
�
� |
G.9804.1_20min _Slicing Requirements
�
� |
China Telecommunications Corporation
,
Nokia Corporation (Finland)
,
Telecom Italia S.p.A. (Italy)
,
Vodafone Group Services Ltd (United Kingdom)
� |
Q2/15
� |
2021-03-30 |
|
[ 2533 ]
�
� |
G.sup.5GBH_10min_ Backhaul capacity estimation model and calculation method for single station
�
� |
China Information Communication Technologies Group
,
China Unicom
,
Huawei Technologies Co., Ltd. (China)
,
Nokia Corporation (Finland)
,
Nokia Shanghai Bell Co. Ltd. (China)
� |
Q2/15
� |
2021-03-30 |
|
[ 2531 ]
�
� |
G.sup.5GBH_10min_ Small cell architecture
�
� |
China Information Communication Technologies Group
,
China Unicom
,
Huawei Technologies Co., Ltd. (China)
,
Nokia Corporation (Finland)
,
Nokia Shanghai Bell Co. Ltd. (China)
� |
Q2/15
� |
2021-03-30 |
|
[ 2530 ]
�
� |
G.sup.5GBH_10min_ Comparing between 5G small cell and macro station
�
� |
China Information Communication Technologies Group
,
China Unicom
,
Huawei Technologies Co., Ltd. (China)
,
Nokia Corporation (Finland)
,
Nokia Shanghai Bell Co. Ltd. (China)
� |
Q2/15
� |
2021-03-30 |
|
[ 2529 ]
�
� |
G.9804.3_10min _G.HSP X/S for OLT
�
� |
Huawei Technologies D�sseldorf GmbH (Germany)
� |
Q2/15
� |
2021-03-30 |
|
[ 2512 ]
�
� |
G.sup.55_10min_ETRI_Frequency interleaving WDM transmission technique
�
� |
Electronics and Telecommunications Research Institute (ETRI) (Korea (Rep. of))
� |
Q2/15
� |
2021-03-30 |
|
[ 2493 ]
�
� |
G.9804.2: Keep the upstream line rate indicator in the Assign_ONU-ID message
�
� |
China Mobile Communications Corporation
,
Huawei Technologies Co., Ltd. (China)
� |
Q2/15
� |
2021-03-30 |
|
[ 2492 ]
�
(Rev.1)� |
G.9804.2_15min_Contention-based operation of HSP systems
�
� |
Futurewei Technologies US R&D Center (United States)
,
Maxlinear Inc (United States)
,
Nokia Corporation (Finland)
,
Verizon Communication Corporation (United States)
� |
Q2/15
� |
2021-03-30 |
|
[ 2491 ]
�
� |
Contention-based operation of HSP systems
�
Duplicate of SG15-C2492
� |
Verizon Communication Corporation (United States)
� |
Q2/15
� |
2021-03-29 |
|
[ 2484 ]
�
� |
9804.2_15min_ZTE_Addressing NLL-21
�
� |
ZTE Corporation (China)
� |
Q2/15
� |
2021-03-29 |
|
[ 2482 ]
�
� |
G.9804.1_10min_ZTE_PON Slicing Use Case
�
� |
ZTE Corporation (China)
� |
Q2/15
� |
2021-03-29 |
|
[ 2481 ]
�
� |
G.9804.2_10min_ZTE_Flex US FEC
�
� |
ZTE Corporation (China)
� |
Q2/15
� |
2021-03-29 |
|
[ 2480 ]
�
� |
G.988_15min_OMCI for security and ToD transients
�
� |
Futurewei Technologies US R&D Center (United States)
� |
Q2/15
� |
2021-03-29 |
|
[ 2479 ]
�
� |
G.9804.2_20min_Security Enhancements for ComTC
�
� |
Futurewei Technologies US R&D Center (United States)
� |
Q2/15
� |
2021-03-29 |
|
[ 2478 ]
�
� |
G.9804.2_10min_RSSI thresholds for contention-based transmissions
�
� |
Futurewei Technologies US R&D Center (United States)
� |
Q2/15
� |
2021-03-29 |
|
[ 2473 ]
�
� |
G.9802.2_15min_WDM PON Optical Path Loss Classes
�
� |
China Telecommunications Corporation
� |
Q2/15
� |
2021-03-29 |
|
[ 2471 ]
�
� |
G.9802.2_10min_WR temperature requirement
�
� |
China Telecommunications Corporation
� |
Q2/15
� |
2021-03-29 |
|
[ 2470 ]
�
� |
G.9802.1_15min_Text proposal to solve LL WRP-06, 10, 12, 14
�
� |
China Telecommunications Corporation
� |
Q2/15
� |
2021-03-29 |
|
[ 2469 ]
�
� |
G.984.5 Amd3_15min_Proposal to split G.984.5 into two recommendations with draft Annex A forms
�
� |
China Telecommunications Corporation
,
Futurewei Technologies US R&D Center (United States)
,
Huawei Technologies Co., Ltd. (China)
� |
Q2/15
� |
2021-03-29 |
|
[ 2455 ]
�
(Rev.1-2)� |
New_G.Suppl_10mn_JNT_ Extension for BiDi beyond 50 Gbps
�
Only order of contact was changed in R2
� |
China Telecommunications Corporation
,
Orange (France)
� |
Q2/15
� |
2021-03-29 |
|
[ 2432 ]
�
� |
G.sup.5GBH_10min_Joint_PON synchronization requirement for 5G
�
� |
China Mobile Communications Corporation
,
China Unicom
,
Huawei Technologies Co., Ltd. (China)
� |
Q2/15
� |
2021-03-29 |
|
[ 2382 ]
�
� |
Downstream Sensitivity Updated with 50G EML/SOA and APD
�
� |
China Information Communication Technologies Group
,
Ministry of Industry and Information Technology (MIIT) (China)
� |
Q2/15
� |
2021-03-29 |
|
[ 2380 ]
�
� |
Proposal for revision of Annex A in G.9803 Amd.2
�
� |
KDDI Corporation (Japan)
,
National Institute of Information and Communications Technology (NICT) (Japan)
� |
Q2/15
� |
2021-03-29 |
|
[ 2379 ]
�
� |
Upstream overhead time in 50G PON
�
� |
Huawei Technologies Co., Ltd. (China)
,
Nokia USA (United States)
� |
Q2/15
� |
2021-03-29 |
|
[ 2368 ]
�
� |
G.sup.CoDBA_10min_5G NR scheduling at RAN time structures for G.sup.CoDBA
�
� |
Electronics and Telecommunications Research Institute (ETRI) (Korea (Rep. of))
� |
Q2/15
� |
2021-03-29 |
|
[ 2345 ]
�
� |
Proposal of new text of optical frequency interleaved WDM transmission technique in G Suppl.55
�
� |
National Institute of Information and Communications Technology (NICT) (Japan)
� |
Q2/15
� |
2021-03-28 |
|
[ 2334 ]
�
� |
G.9804.3_10min_HW_Base line parameters of 50G DS
�
� |
Huawei Technologies Co., Ltd. (China)
� |
Q2/15
� |
2021-03-27 |
|
[ 2333 ]
�
� |
G.9804.3_10min_HW ONU X_S specification
�
� |
Huawei Technologies Co., Ltd. (China)
� |
Q2/15
� |
2021-03-27 |
|
[ 2329 ]
�
(Rev.1-2)� |
G.9804.2_20min_JNT_Rate Parameterization
�
� |
China Telecommunications Corporation
,
Futurewei Technologies US R&D Center (United States)
,
Nokia Corporation (Finland)
,
Nokia Shanghai Bell Co. Ltd. (China)
,
Verizon Communication Corporation (United States)
,
ZTE Corporation (China)
� |
Q2/15
� |
2021-03-27 |
|
[ 2328 ]
�
� |
G.9802.2_15min_JNT_OPL classes
�
� |
Orange (France)
,
ZTE Corporation (China)
� |
Q2/15
� |
2021-03-27 |
|
[ 2327 ]
�
(Rev.1)� |
G.9807.3_15min_GOOG_FEC and link budget resolution
�
� |
Google Fiber (United States)
� |
Q2/15
� |
2021-03-27 |
|
[ 2309 ]
�
� |
New G.Suppl_10mn_Or Towards greener optical access
�
� |
Orange (France)
� |
Q2/15
� |
2021-03-26 |
Resultats:51 documents R�sultats :�
1 -
2
�-�Suivant
� |
T�l�chargement de multiples documents:�Formats et langues � prendre en compte (si disponibles):