Union Internationale des T�l�communications UIT
EnglishEspa�ol
Plan du site Contactez-nous Copie Imprimable
Page d'accueil : UIT-T : SG 15 : R�union�2017-06-19�: Contributions� Ajout�s r�cemment�-� Recherche de documents de r�union
UIT-T�SG 15� C�(2017-06-19)�

UIT-T�SG 15

Transport, access and home

P�riode d'�tudes 2017

R�union� du 2017-06-19 au 2017-06-30

Lieu : Suisse [Gen�ve]

Autres r�unions : 2021-12-062021-04-122020-09-072020-01-272019-07-012018-10-082018-01-29

Resultats:19 documents
Contributions �[�Source:�Futurewei Technologies US R&D Center (United States)�]���Documents / Contributions

Num�ro
Titre Source AI/Question
Date
[ 376 ]
Proposal for Appendix III - Product Characterization Checklist in the Draft Recommendation ITU-T L.pneid "Passive node elements with automated ID tag detection" � Futurewei Technologies US R&D Center (United States) Q16/15 2017-06-06
[ 371 ]
Proposal for Appendix II - Performance Test Programme in the Draft Recommendation ITU-T L.pneid "Passive node elements with automated ID tag detection" � Futurewei Technologies US R&D Center (United States) Q16/15 2017-06-06
[ 367 ]
Proposal for Appendix I - Performance Evaluation Criteria in the Draft Recommendation ITU-T L.pneid "Passive node elements with automated ID tag detection" � Futurewei Technologies US R&D Center (United States) Q16/15 2017-06-06
[ 362 ]
G.vlc: Multiple Asymmetrically Clipped Optical OFDM � Futurewei Technologies US R&D Center (United States) Q18/15 2017-06-06
[ 314 ]
XGS-PON upstream jitter budget � Futurewei Technologies US R&D Center (United States) , Huawei Technologies Co., Ltd. (China) Q2/15 2017-06-06
[ 233 ]
G.vlc: Odd-DCO-OFDM: A Dimmable DCO-OFDM Scheme � Futurewei Technologies US R&D Center (United States) Q18/15 2017-06-06
[ 208 ]
G.989.3, G.988: Channel Bonding Principles � ADTRAN (United States) , Futurewei Technologies US R&D Center (United States) Q2/15 2017-06-06
[ 189 ]
G.fast: Triggering Criteria for RMCR � Futurewei Technologies US R&D Center (United States) Q4/15 2017-06-05
[ 188 ]
G.fast: Improving RMCR � Futurewei Technologies US R&D Center (United States) Q4/15 2017-06-05
[ 187 ]
G.fast: DTA and RPA � Futurewei Technologies US R&D Center (United States) Q4/15 2017-06-05
[ 186 ]
G.fast: A Coordinated DTA Procedure to Avoid Unexpected NEXT � Futurewei Technologies US R&D Center (United States) Q4/15 2017-06-05
[ 185 ]
G.fast: Comparison of two power control methods for precoding � Futurewei Technologies US R&D Center (United States) Q4/15 2017-06-05
[ 184 ]
G.mgfast: Constellation Shaping with LDPC Coded Modulation � Futurewei Technologies US R&D Center (United States) Q4/15 2017-06-05
[ 183 ]
G.fast: Simulation Results for Maximum Ration Transmission � Futurewei Technologies US R&D Center (United States) Q4/15 2017-06-05
[ 100 ]
Proposals for open items in G.9807.1 Amd1 � China Telecommunications Corporation , FiberHome Technologies Group (China) , Futurewei Technologies US R&D Center (United States) , ZTE Corporation (China) Q2/15 2017-06-05
[ 61 ]
RE CT and ONU association detection in G.9807.2 � Futurewei Technologies US R&D Center (United States) Q2/15 2017-06-02
[ 60 ]
G.sup.HSP requirement discussion � Futurewei Technologies US R&D Center (United States) Q2/15 2017-06-02
[ 59 ]
G.RoF physical layer and system requirements � Futurewei Technologies US R&D Center (United States) Q2/15 2017-06-02
[ 58 ]
Link aggregation bonded ONU management in G.988 � Futurewei Technologies US R&D Center (United States) Q2/15 2017-06-02
Resultats:19 documents
T�l�chargement de multiples documents:�Cocher les cases correspondant aux documents s�lectionn�s, puis appuyer sur "T�l�charger"

Pr�f�rences utilisateur:
T�l�chargement de multiples documents:�Formats et langues � prendre en compte (si disponibles):
Pages de navigation HTML
Formats �+�Autres formats
Langues (maximum 2) �+�Multilingue�
(E: Anglais - F: Fran�ais - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Testez ITU Translate pour la traduction automatique de documents
D�but de page�-� Commentaires�-� Contactez-nous�-� Droits d'auteur � UIT�2008�Tous droits r�serv�s
Contact pour cette page :� TSB EDH
Mis � jour le :�2025-1-10