Union Internationale des T�l�communications UIT
EnglishEspa�ol
Plan du site Contactez-nous Copie Imprimable
Page d'accueil : UIT-T : SG 11 : R�union�2021-07-15�: Documents Temporaires� Ajout�s r�cemment�-� Recherche de documents de r�union
UIT-T�SG 11� TD-WP1�(2021-07-15)�

UIT-T�SG 11

Protocols and test specifications

P�riode d'�tudes 2017

R�union� du 2021-07-15 au 2021-07-16

Lieu : E-Meeting

Autres r�unions : 2021-12-01� [ 2021-07-15 ]� 2021-03-172020-12-182020-12-042020-11-192020-07-222020-03-042019-10-162019-06-262019-03-062018-10-312018-07-182017-11-082017-07-122017-02-06

Resultats:21 documents
Documents Temporaires �(WP1) �[�AI/Question:�Q2/11�]���Documents / Contributions

Num�ro
Titre Source AI/Question
Date
[ 114-WP1 ]
New work items (WP1/11 virtual meeting, 16 July 2021) � TSB Q5/11, Q4/11, Q3/11, Q2/11, Q1/11 2021-07-14
[ 113-WP1 ]
Output - baseline text for a new work item Technical Report TR-NCDP "Session layer network coding protocol for multicast data transmission" (e-meeting, 7-16 July 2021) � Editors Q2/11 2021-07-14
[ 112-WP1 ]
Output - baseline text for a new work item Q.QKDN_profr "Quantum key distribution networks - Protocol framework" (e-meeting, 7-16 July 2021) � Editors Q2/11 2021-07-14
[ 111-WP1 ]
Output - draft new Recommendation ITU-T Q.PRO-Trust: "Signalling procedures and protocols for enabling interconnection between trustable network entities in support of existing and emerging networks" (e-meeting, 7-16 July 2021) � Editors Q2/11 2021-07-14
[ 110-WP1 ]
Output - draft Recommendation ITU-T Q.IMT2020-SAO: "Requirement, framework and protocols for signalling network analyses and optimization in IMT-2020" (e-meeting, 7-16 July 2021) � Editors Q2/11 2021-07-14
[ 109-WP1 ]
Output - draft Recommendation ITU-T Q.VoLTE-SAO-FP "Framework and protocols for signalling network analyses and optimization in VoLTE" (e-meeting, 7-16 July 2021) � Editors Q2/11 2021-07-14
[ 108-WP1 ]
Output - draft Recommendation ITU-T Q.CIDA "Signalling procedures of calling line identification authentication" (e-meeting, 7-16 July 2021) � Editor Q2/11 2021-07-14
[ 107-WP1 ]
LS/o on initiation of new Technical Report TR-NCDP "Session layer network coding protocol for multicast data transmission" [to IETF NWCRG] � ITU-T Study Group 11 Q2/11 2021-07-14
[ 106-WP1 ]
LS/o on initiation of new work item Q.QKDN_profr "Quantum key distribution networks - Protocol framework" [to ITU-T SG13, SG17, FG-QIT4N; ETSI ISG-QKD, WG QSC; ISO/IEC JTC1-SC27] � ITU-T Study Group 11 Q2/11 2021-07-14
[ 92-WP1 ]
LS/o/r on progress of ITU-T TR-USSD (CYBERQSC(21)021007r2) [to ETSI TC Cyber WG QSC] � ITU-T Study Group 11 Q2/11 2021-07-12
[ 91-WP1 ]
LS/o/r on draft Recommendation ITU-T Q.Pro-Trust "Signalling procedures and protocols for enabling interconnection between trustable network entities in support of existing and emerging networks" [to ITU-T SG17] � ITU-T Study Group 11 Q2/11 2021-07-12
[ 88-WP1 ]
(Rev.1)
Draft Report of Working Party 1/11 "Signalling requirements and protocols for emerging telecommunications networks" (virtual, 16 July 2021) � Chairman WP1/11 Q5/11, Q4/11, Q3/11, Q2/11, Q1/11 2021-06-18
[ 84-WP1 ]
(Rev.1)
Draft Report of interim Q2/11 RGM e-meeting Q2/11 "Signalling requirements and protocols for services and applications in telecommunication environments" (e-meeting, 7-16 July 2021) � Rapporteur Q2/11 Q2/11 2021-06-18
[ 82-WP1 ]
LS/i/r on Comments from ETSI TC CYBER QSC to ITU-T SG11 on TR-USSD (SG11-LS175) [from ETSI TC Cyber WG QSC] � ETSI TC Cyber WG QSC Q2/11 2021-06-11
[ 75-WP1 ]
LS/i on coordination for identity management [from ITU-T SG17] � ITU-T Study Group 17 Q2/11, Q15/11 2021-05-18
[ 74-WP1 ]
LS/i/r on progress of ongoing work item ITU-T TR-USSD (SG11-LS177) [from ISO IEC JTC1 SC27 WG2] � ISO IEC JTC1 SC27 WG2 Q2/11 2021-05-05
[ 71-WP1 ]
LS/i/r on draft Recommendation ITU-T Q.Pro-Trust "Signalling procedures and protocols for enabling interconnection between trustable network entities in support of existing and emerging networks" (SG11-LS176) [from ITU-T SG17] � ITU-T Study Group 17 Q2/11 2021-04-15
[ 70-WP1 ]
List of WP1/11 Rapporteurs, Associate Rapporteurs and Acting Rapporteurs � TSB Q5/11, Q4/11, Q3/11, Q2/11, Q1/11 2021-04-15
[ 69-WP1 ]
Incoming and outgoing liaison statements (WP1/11 virtual meeting, 16 July 2021) � TSB Q5/11, Q4/11, Q3/11, Q2/11, Q1/11 2021-04-15
[ 67-WP1 ]
(Rev.1-8)
Draft time plan of interim Rapporteur group e-meetings and WP1/11, WP2/11 and WP3/11 virtual meetings (7-16 July 2021) � TSB Q5/11, Q4/11, Q3/11, Q2/11, Q1/11 2021-04-14
[ 66-WP1 ]
(Rev.1-2)
Draft Agenda for Working Party 1/11 "Signalling requirements and protocols for emerging telecommunications networks" (virtual, 16 July 2021) � TSB Q5/11, Q4/11, Q3/11, Q2/11, Q1/11 2021-04-14
Resultats:21 documents
T�l�chargement de multiples documents:�Cocher les cases correspondant aux documents s�lectionn�s, puis appuyer sur "T�l�charger"

Pr�f�rences utilisateur:
T�l�chargement de multiples documents:�Formats et langues � prendre en compte (si disponibles):
Pages de navigation HTML
Formats �+�Autres formats
Langues (maximum 2) �+�Multilingue�
(E: Anglais - F: Fran�ais - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Testez ITU Translate pour la traduction automatique de documents
D�but de page�-� Commentaires�-� Contactez-nous�-� Droits d'auteur � UIT�2008�Tous droits r�serv�s
Contact pour cette page :� TSB EDH
Mis � jour le :�2025-1-10