Contributions
�[�Source:�China Unicom�]��� |
�
|
Num�ro�
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 558 ]
�
� |
Proposed a new work item on draft Recommendation ITU-T K. ebid "earthing and bonding of the indoor distribution system for mobile communication"
�
� |
China Unicom
� |
Q1/5
� |
2019-09-02 |
|
[ 487 ]
�
� |
A.1 form for new work item proposal on methodologies for evaluating the functionality and performance of power supply unit configured for servers
�
� |
China Unicom
� |
Q6/5
� |
2019-04-29 |
|
[ 470 ]
�
� |
The second draft of K.sod "Surge and over-current protection parameters of external disconnector for surge protective devices used in telecommunication equipment"
�
� |
China Unicom
� |
Q2/5
� |
2019-04-28 |
|
[ 437 ]
�
� |
New contents of intelligent heat pipe system proposed to add to draft recommendation L.SE_BS
�
� |
China Unicom
� |
Q6/5
� |
2019-04-25 |
|
[ 436 ]
�
� |
New contents of intelligent heat exchange system proposed to add to draft recommendation L.SE_BS
�
� |
China Unicom
� |
Q6/5
� |
2019-04-25 |
|
[ 435 ]
�
(Rev.1)� |
New contents of intelligent fresh ventilation system proposed to add to draft recommendation L.SE_BS
�
� |
China Unicom
� |
Q6/5
� |
2019-04-25 |
|
[ 433 ]
�
� |
New work item proposal on methodologies for evaluating the functionality and performance of power supply unit configured for servers
�
� |
China Unicom
� |
Q6/5
� |
2019-04-25 |
|
[ 424 ]
�
� |
Proposed Terms of Reference for new Focus Group on "Environmental Efficiency for Artificial Intelligence and other Emerging Technologies" (FG-AI4EE)
�
� |
Argentina
,
Brazil
,
China Unicom
,
China
,
Cisco Systems, Inc. (United States)
,
Colombia
,
Consorzio Nazionale Interuniversitario per le Telecomunicazioni CNIT (Italy)
,
Dominican Rep.
,
Egypt
,
Greece
,
Huawei Technologies Co., Ltd. (China)
,
Italy
,
Kenya
,
Korea (Rep. of)
,
Nokia Corporation (Finland)
,
Orange (France)
,
Rwanda
,
Spain
,
Telecommunication and Postal Regulatory Authority (Sudan)
,
Telefon AB - LM Ericsson (Sweden)
,
Uganda Communications Commission (UCC)
� |
QALL/5
� |
2019-04-15 |
|
[ 378 ]
�
� |
The fifth draft of K.psp "Protection of small-size telecommunication installations with poor earthing conditions"
�
� |
China Unicom
� |
Q1/5
� |
2018-08-29 |
|
[ 245 ]
�
(Rev.1)� |
The fourth draft of K.psp "Protection of small-size telecommunication installations with poor earthing conditions"
�
� |
China Unicom
� |
Q1/5
� |
2018-05-06 |
|
[ 131 ]
�
� |
The third draft of K.psp "Protection of small-size telecommunication installations with poor earthing conditions"
�
� |
China Unicom
� |
Q1/5
� |
2017-10-30 |
|
[ 129 ]
�
� |
The first draft of K.sod "Surge and over-current protection parameters of external disconnector for surge protective devices used in telecommunication equipment"
�
� |
China Unicom
� |
Q2/5
� |
2017-10-30 |
|
[ 128 ]
�
� |
proposal about Ethernet transverse lightning test level
�
� |
China Unicom
� |
Q2/5
� |
2017-10-30 |
|
[ 125 ]
�
� |
Proposal on introducing a new smart energy solution into the draft recommendation L.SE_DC
�
� |
China Unicom
� |
Q6/5
� |
2017-10-30 |
|
[ 49 ]
�
(Rev.1)� |
New work item proposal on smart energy solution for data centre and telecom centre
�
� |
Ministry of Industry and Information Technology (MIIT), China
,
China Unicom
� |
Q6/5
� |
2017-05-02 |
|
[ 44 ]
�
� |
The second draft of K.psp "Protection of small-size telecommunication installations with poor earthing conditions"
�
� |
China Unicom
� |
Q1/5
� |
2017-05-01 |
|
[ 25 ]
�
� |
Proposal on new recommendation L. dualpowerinput
�
� |
China Unicom
� |
Q6/5
� |
2017-04-28 |
Resultats:17 documents
� |
T�l�chargement de multiples documents:�Formats et langues � prendre en compte (si disponibles):