Contributions
�[�AI/Question:�Q1/5�]��� |
�
|
Num�ro�
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 875 ]
�
� |
The 2nd draft of Recommendation ITU-T K.HVAC_400VDC, "Electrical safety and lightning protection of medium voltage input and up to �400VDC output power system in ICT data centre and telecommunication centre"
�
� |
Huawei Technologies Co., Ltd. (China)
� |
Q1/5
� |
2021-11-17 |
|
[ 833 ]
�
(Rev.1)� |
Proposed revision of Recommendation K.87 "Guide for the application of electromagnetic security requirements - Overview"
�
� |
Nippon Telegraph and Telephone Corporation (NTT) (Japan)
� |
Q1/5
� |
2021-11-15 |
|
[ 832 ]
�
(Rev.1-2)� |
Revision of K.138 "Quality estimation methods and application guidelines for mitigation measures based on particle radiation tests"
�
� |
NEC Corporation (Japan)
,
Nippon Telegraph and Telephone Corporation (NTT) (Japan)
� |
Q1/5
� |
2021-11-15 |
|
[ 831 ]
�
(Rev.1-2)� |
Revision of K.139 "Reliability requirements for telecommunication systems affected by particle radiation"
�
� |
NEC Corporation (Japan)
,
Nippon Telegraph and Telephone Corporation (NTT) (Japan)
� |
Q1/5
� |
2021-11-15 |
|
[ 830 ]
�
(Rev.1-2)� |
Revision of K.131 "Design methodologies for telecommunication systems applying soft error measures"
�
� |
NEC Corporation (Japan)
,
Nippon Telegraph and Telephone Corporation (NTT) (Japan)
� |
Q1/5
� |
2021-11-15 |
|
[ 829 ]
�
(Rev.1-2)� |
Revision of K.130 "Neutron irradiation test methods for telecommunication equipment"
�
� |
NEC Corporation (Japan)
,
Nippon Telegraph and Telephone Corporation (NTT) (Japan)
� |
Q1/5
� |
2021-11-15 |
|
[ 827 ]
�
(Rev.1-2)� |
Revision of K.124 "Overview of particle radiation effects on telecommunication systems"
�
� |
NEC Corporation (Japan)
,
Nippon Telegraph and Telephone Corporation (NTT) (Japan)
� |
Q1/5
� |
2021-11-15 |
|
[ 792 ]
�
� |
The 1st draft of Recommendation ITU-T K.MV-UPS, "Electrical safety and lightning protection requirements for medium voltage uninterruptible power system"
�
� |
Huawei Technologies Co., Ltd. (China)
� |
Q1/5
� |
2021-04-28 |
|
[ 791 ]
�
(Rev.1)� |
The proposal to rename ITU-T K.HVAC_400VDC "Electrical safety and lightning protection of medium voltage input and up to 400VDC output power system in data centre and telecommunication room"
�
� |
Huawei Technologies Co., Ltd. (China)
� |
Q1/5
� |
2021-04-28 |
|
[ 790 ]
�
(Rev.1)� |
Outline of draft Recommendation on ITU-T K.5G-Lightning "Practical guide for lightning protection, earthing and bonding, and safety consideration of 5G radio base station"
�
� |
Huawei Technologies Co., Ltd. (China)
� |
Q1/5
� |
2021-04-28 |
|
[ 789 ]
�
(Rev.1)� |
Outline of K.SPDM: Performance Requirements and Test Methods for Surge Protective Device Modules Used in AC power port of Telecommunication Equipment
�
� |
Huawei Technologies Co., Ltd. (China)
� |
Q1/5
� |
2021-04-28 |
|
[ 757 ]
�
(Rev.1)� |
Revision of K.139 "Reliability requirements for telecommunication systems affected by particle radiation"
�
� |
Fujitsu Limited (Japan)
,
NEC Corporation (Japan)
,
Nippon Telegraph and Telephone Corporation (NTT) (Japan)
� |
Q1/5
� |
2021-04-23 |
|
[ 756 ]
�
(Rev.1)� |
Revision of K.138 "Quality estimation methods and application guidelines for mitigation measures based on particle radiation tests"
�
� |
Fujitsu Limited (Japan)
,
NEC Corporation (Japan)
,
Nippon Telegraph and Telephone Corporation (NTT) (Japan)
� |
Q1/5
� |
2021-04-23 |
|
[ 755 ]
�
(Rev.1)� |
Revision of K.131 "Design methodologies for telecommunication systems applying soft error measures"
�
� |
Fujitsu Limited (Japan)
,
NEC Corporation (Japan)
,
Nippon Telegraph and Telephone Corporation (NTT) (Japan)
� |
Q1/5
� |
2021-04-23 |
|
[ 754 ]
�
(Rev.1)� |
Revision of K.130 "Neutron irradiation test methods for telecommunication equipment"
�
� |
Fujitsu Limited (Japan)
,
NEC Corporation (Japan)
,
Nippon Telegraph and Telephone Corporation (NTT) (Japan)
� |
Q1/5
� |
2021-04-23 |
|
[ 753 ]
�
(Rev.1)� |
Revision of K.124 "Overview of particle radiation effects on telecommunication systems"
�
� |
Fujitsu Limited (Japan)
,
NEC Corporation (Japan)
,
Nippon Telegraph and Telephone Corporation (NTT) (Japan)
� |
Q1/5
� |
2021-04-23 |
|
[ 721 ]
�
� |
A.1 justification for proposed new ITU-T Recommendation in the work programme: K.HVAC_400Vdc: "Electrical safety and lightning protection of medium voltage input and up to 400VDC output power system in data center and telecommunication room"
�
� |
Huawei Technologies Co., Ltd. (China)
,
Ministry of Industry and Information Technology (MIIT) (China)
� |
Q1/5
� |
2020-10-05 |
|
[ 682 ]
�
(Rev.1)� |
Proposed new work item on "Electrical safety and lightning protection of 10kV AC input and up to 400VDC output power system in data center and telecommunication room"
�
� |
Huawei Technologies Co., Ltd. (China)
,
Ministry of Industry and Information Technology (MIIT) (China)
� |
Q1/5
� |
2020-09-29 |
|
[ 680 ]
�
� |
The revision of Recommendation ITU-T K.35(01/2018) "Bonding configurations and earthing at remote electronic sites"
�
� |
China Telecommunications Corporation
� |
Q1/5
� |
2020-09-29 |
|
[ 668 ]
�
(Rev.1)� |
Final draft of Recommendation ITU-T K.int (Limits of interf�rences on telecommunication transmissions on copper other than speech)
�
� |
Orange (France)
� |
Q1/5
� |
2020-04-28 |
|
[ 616 ]
�
(Rev.1)� |
Proposal to revise ITU-T K.112, Lightning protection, earthing and bonding: Practical procedures for radio base stations
�
� |
Huawei Technologies Co., Ltd. (China)
� |
Q1/5
� |
2020-04-26 |
|
[ 615 ]
�
(Rev.1)� |
Proposal to revise ITU-T K.56, Protection of radio base stations against lightning discharges
�
� |
Huawei Technologies Co., Ltd. (China)
� |
Q1/5
� |
2020-04-26 |
|
[ 604 ]
�
� |
Description of new Question QA/5
�
� |
Huawei Technologies Co., Ltd. (China)
� |
QALL/5, Q5/5, Q1/5
� |
2019-09-04 |
|
[ 558 ]
�
� |
Proposed a new work item on draft Recommendation ITU-T K. ebid "earthing and bonding of the indoor distribution system for mobile communication"
�
� |
China Unicom
� |
Q1/5
� |
2019-09-02 |
|
[ 546 ]
�
� |
Proposed a new work item on draft Recommendation ITU-T K.5G-Lightning "Practical guide for lightning protection, earthing and bonding, and safety consideration of 5G radio base station"
�
� |
Huawei Technologies Co., Ltd. (China)
� |
Q1/5
� |
2019-08-30 |
|
[ 545 ]
�
� |
Proposal to revise ITU-T K.40
�
� |
Huawei Technologies Co., Ltd. (China)
� |
Q1/5
� |
2019-08-30 |
|
[ 541 ]
�
� |
The 6th draft of K.vss "Lightning protection and Earthing of Video Surveillance System"
�
� |
China Telecommunications Corporation
� |
Q1/5
� |
2019-08-28 |
|
[ 517 ]
�
� |
Second draft of Recommendation ITU-T K.int (Limits of interferences on telecommunication transmissions on copper other than speech)
�
� |
Orange (France)
� |
Q1/5
� |
2019-04-30 |
|
[ 514 ]
�
(Rev.1)� |
Research on limits on ADSL disturbances created by A.C. electrified traction system for K.int (Limits of interference on telecommunication transmissions on copper other than speech)
�
� |
Orange (France)
� |
Q1/5
� |
2019-04-30 |
|
[ 453 ]
�
� |
Proposal to add a clause to demonstrate the protection measure for antenna system against lightning in different installation scenarios in ITU-T K.112.
�
� |
Huawei Technologies Co., Ltd. (China)
� |
Q1/5
� |
2019-04-26 |
|
[ 440 ]
�
� |
The 5th draft of K.vss "Lightning protection and Earthing of Video Surveillance System"
�
� |
China Telecommunications Corporation
� |
Q1/5
� |
2019-04-25 |
|
[ 380 ]
�
� |
Added the requirements for SSI powered by up to 400V IT d.c. system in ITU-T K.psp
�
� |
Huawei Technologies Co., Ltd.
� |
Q1/5
� |
2018-08-29 |
|
[ 379 ]
�
� |
Some revision suggestions for ITU-T K.psp "Protection of small-size telecommunication installations with poor earthing conditions"
�
� |
Huawei Technologies Co., Ltd.
� |
Q1/5
� |
2018-08-29 |
|
[ 378 ]
�
� |
The fifth draft of K.psp "Protection of small-size telecommunication installations with poor earthing conditions"
�
� |
China Unicom
� |
Q1/5
� |
2018-08-29 |
|
[ 371 ]
�
(Rev.1-2)� |
Re-comments on TD523 and draft K.vss
�
� |
Nippon Telegraph and Telephone Corporation (NTT)
� |
Q1/5
� |
2018-08-28 |
|
[ 322 ]
�
(Rev.1-2)� |
The 4th draft of K.vss "Lightning protection and Earthing of Video Surveillance System"
�
� |
China Telecommunications Corporation
� |
Q1/5
� |
2018-08-24 |
|
[ 270 ]
�
(Rev.1)� |
IP PoE camera systems - Bridging Functional Insulation - implications and system consequences
�
� |
Bourns Limited
� |
Q2/5, Q1/5
� |
2018-05-08 |
|
[ 246 ]
�
� |
Comments and re-proposals on K.vss "Lightning protection and Earthing of Video Surveillance System"
�
� |
Nippon Telegraph and Telephone Corporation (NTT)
� |
Q1/5
� |
2018-05-07 |
|
[ 245 ]
�
(Rev.1)� |
The fourth draft of K.psp "Protection of small-size telecommunication installations with poor earthing conditions"
�
� |
China Unicom
� |
Q1/5
� |
2018-05-06 |
|
[ 240 ]
�
� |
Proposal to add a new Appendix to give some examples for protection GPS system against lightning in ITU-T K.112
�
� |
Huawei Technologies Co., Ltd.
� |
Q1/5
� |
2018-05-03 |
|
[ 230 ]
�
(Rev.1)� |
Review of IEC 62305-4
�
� |
Littelfuse UK Ltd.
� |
Q1/5
� |
2018-04-19 |
|
[ 223 ]
�
� |
Experience of Cameroon in the protection of radio base station (RBS) against lightning
�
� |
Minist�re des Postes et T�l�communications, Cameroon
� |
Q1/5
� |
2018-04-16 |
|
[ 177 ]
�
� |
First draft of Recommendation ITU-T K.int (Limits of interferences on telecommunication transmissions on copper other than speech)
�
� |
Orange
,
Soci�t� nationale des chemins de fer fran�ais
� |
Q1/5
� |
2017-10-31 |
|
[ 176 ]
�
� |
Research of limits on ADSL disturbances created by A.C. electrified traction systems for K.int (Limits of interference on telecommunication transmissions on copper other than speech)
�
� |
Orange
,
Soci�t� nationale des chemins de fer fran�ais
� |
Q1/5
� |
2017-10-31 |
|
[ 131 ]
�
� |
The third draft of K.psp "Protection of small-size telecommunication installations with poor earthing conditions"
�
� |
China Unicom
� |
Q1/5
� |
2017-10-30 |
|
[ 115 ]
�
� |
Proposal to delete work item K.lp from the work program
�
� |
Huawei Technologies Co., Ltd.
� |
Q1/5
� |
2017-10-28 |
|
[ 114 ]
�
� |
Proposal for new subclauses to be inserted on ITU-T K.40
�
� |
Huawei Technologies Co., Ltd.
� |
Q1/5
� |
2017-10-28 |
|
[ 113 ]
�
� |
Proposal for an alternative earthing network for electronic equipment cabinet (EEC) in ITU-T K.35
�
� |
Huawei Technologies Co., Ltd.
� |
Q1/5
� |
2017-10-28 |
|
[ 103 ]
�
(Rev.1)� |
Comments and proposals on K.vss
�
� |
Nippon Telegraph and Telephone Corporation (NTT)
� |
Q1/5
� |
2017-10-27 |
|
[ 76 ]
�
� |
The power frequency magnetic field (PFMF) control of ICT equipment rooms and PFMF immunity requirement for ICT equipment for ITU-T K.idc
�
� |
Huawei Technologies Co., Ltd.
� |
Q1/5
� |
2017-05-03 |
Resultats:55 documents R�sultats :�
1 -
2
�-�Suivant
� |
T�l�chargement de multiples documents:�Formats et langues � prendre en compte (si disponibles):