Union Internationale des T�l�communications UIT
EnglishEspa�ol
Plan du site Contactez-nous Copie Imprimable
Page d'accueil : UIT-T : SG 5 : R�union�2021-05-11�: Contributions� Ajout�s r�cemment�-� Recherche de documents de r�union
UIT-T�SG 5� C�(2021-05-11)�

UIT-T�SG 5

Environment, climate change and circular economy

P�riode d'�tudes 2017

R�union� du 2021-05-11 au 2021-05-20

Lieu : E-Meeting

Autres r�unions : 2021-11-302020-10-192020-05-112019-09-162019-05-132018-09-112018-05-212018-03-052017-11-132017-05-15

Resultats:13 documents
Contributions �[�AI/Question:�Q2/5�]���Documents / Contributions

Num�ro
Titre Source AI/Question
Date
[ 809 ]
ITU-T K.117 - Long reach single twisted-pair Ethernet resistibility testing � Bourns Limited (United Kingdom) Q2/5 2021-04-28
[ 800 ]
Correction of Figure 3 drawing error in K.50 Amendment 1(06/2020) � Bourns Limited (United Kingdom) Q2/5 2021-04-28
[ 783 ]
Proposal for clarification of K.20 "Resistibility of telecommunication equipment installed in a telecommunication centre to overvoltages and overcurrents" � Nokia Corporation (Finland) Q2/5 2021-04-27
[ 776 ]
(Rev.1)
Revision of Series K Supplement 22 "Rationale of resistibility of telecommunication equipment installed in the access and trunk networks against lightning" � Nippon Telegraph and Telephone Corporation (NTT) (Japan) Q2/5 2021-04-27
[ 775 ]
(Rev.1)
Proposed revision of K.Sup.21 "Rationale for setting resistibility requirements of telecommunication equipment installed in customer premises against lightning" � Nippon Telegraph and Telephone Corporation (NTT) (Japan) Q2/5 2021-04-27
[ 774 ]
(Rev.1)
Draft Supplement ITU-T K.20 (K.Sup.telecom_centre):"Rationale for setting resistibility requirements of telecommunication equipment installed in a telecommunication centre against lightning" � Nippon Telegraph and Telephone Corporation (NTT) (Japan) Q2/5 2021-04-27
[ 752 ]
Ethernet terms from ISO/IEC � Bourns Limited (United Kingdom) Q8/5, Q2/5 2021-04-09
[ 751 ]
(Rev.1)
IEEE-SA 802.3 content licencing for ITU-T Recommendation K.147 � Bourns Limited (United Kingdom) Q8/5, Q2/5 2021-04-07
[ 750 ]
Phantom powering � Bourns Limited (United Kingdom) Q8/5, Q2/5 2021-04-06
[ 749 ]
(Rev.1)
Simplifying K.147 Tables 2 and 3 to show just the protection parameters � Bourns Limited (United Kingdom) Q2/5 2021-03-27
[ 748 ]
(Rev.1)
Simplifying K.147 Annex A � Bourns Limited (United Kingdom) Q2/5 2021-03-22
[ 746 ]
(Rev.1)
Objectives of K.147 and comments on SG05-C-0745 � Bourns Limited (United Kingdom) Q2/5 2021-03-19
[ 745 ]
(Rev.1) +Add.1
ITU-T Rec. K.147 (06/2020) Ethernet port resistibility testing for overvoltages and overcurrents � IEEE (IEEE 802.3) Q2/5 2021-03-16
Resultats:13 documents
T�l�chargement de multiples documents:�Cocher les cases correspondant aux documents s�lectionn�s, puis appuyer sur "T�l�charger"

Pr�f�rences utilisateur:
T�l�chargement de multiples documents:�Formats et langues � prendre en compte (si disponibles):
Pages de navigation HTML
Formats �+�Autres formats
Langues (maximum 2) �+�Multilingue�
(E: Anglais - F: Fran�ais - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Testez ITU Translate pour la traduction automatique de documents
D�but de page�-� Commentaires�-� Contactez-nous�-� Droits d'auteur � UIT�2008�Tous droits r�serv�s
Contact pour cette page :� TSB EDH
Mis � jour le :�2025-1-11