Contributions�� |
�
|
Num�ro�
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 277 ]
�
� |
Proposed new work item on K.Small - "Small base stations - impact on the overall exposure level"
�
� |
Argentina
� |
Q3/5
� |
2018-05-09 |
|
[ 276 ]
�
� |
Proposed new work item on K.reflection - "Impact of the metallic structures for the EMF exposure level"
�
� |
Argentina
� |
Q3/5
� |
2018-05-09 |
|
[ 275 ]
�
� |
Proposed new work item on K.peak - "Comparison between peak and real exposure in the long term considerations"
�
� |
Argentina
� |
Q3/5
� |
2018-05-09 |
|
[ 274 ]
�
� |
Proposed new work item on ITU-T K.Zones - "Guidance on Determining the Compliance Boundaries (the exclusion zone) of a Live Antenna"
�
� |
Argentina
� |
Q3/5
� |
2018-05-09 |
|
[ 273 ]
�
� |
Proposed new work item on K.dosimeter - "Personal dosimeters as a device in assessing human exposure to EMF"
�
� |
Argentina
� |
Q3/5
� |
2018-05-09 |
|
[ 272 ]
�
(Rev.1)� |
IEC 60617 compliance and PoE testing
�
� |
Bourns Limited
� |
Q2/5
� |
2018-05-08 |
|
[ 271 ]
�
(Rev.1-2)� |
Insulation co-ordination and IEEE 802.3 insulation tests
�
� |
Bourns Limited
� |
Q2/5
� |
2018-05-08 |
|
[ 270 ]
�
(Rev.1)� |
IP PoE camera systems - Bridging Functional Insulation - implications and system consequences
�
� |
Bourns Limited
� |
Q2/5, Q1/5
� |
2018-05-08 |
|
[ 269 ]
�
� |
Clarification needed on PoE testing - topics for discussion
�
� |
Bourns Limited
� |
Q2/5
� |
2018-05-08 |
|
[ 268 ]
�
(Rev.1)� |
Draft ITU-T Recommendation K.Radio.EMC - Electromagnetic Compatibility requirement for radio telecommunication equipment
�
� |
Nokia Corporation
� |
Q4/5
� |
2018-05-08 |
|
[ 267 ]
�
� |
Referencing Figure 6.7-3 given in the ITU-T K.44
�
� |
Bourns Limited
� |
Q2/5
� |
2018-05-08 |
|
[ 266 ]
�
� |
Adequate assessment and sensitization on possible human exposure to RF EMF radiation around telecommunications installations
�
� |
Uganda Communications Commission (UCC)
� |
Q3/5
� |
2018-05-08 |
|
[ 265 ]
�
(Rev.1)� |
Harmonizing EMF Exposure Limits
�
� |
Office of Electronic Communications
,
Poland
� |
Q3/5
� |
2018-05-08 |
|
[ 264 ]
�
(Rev.1-3)� |
Some reworked material for K.rcd document
�
� |
Bourns Limited
,
China Telecommunications Corporation
� |
Q2/5
� |
2018-05-08 |
|
[ 263 ]
�
(Rev.1)� |
Proposed second draft of K.soft_req "Reliability requirement of particle radiation effect for telecommunication systems"
�
� |
Fujitsu Limited
,
Hitachi, Ltd.
,
NEC Corporation
,
Nippon Telegraph and Telephone Corporation (NTT)
,
Oki Electric Industry Company Ltd. (OKI)
,
Xilinx Incorporation
� |
Q5/5
� |
2018-05-08 |
|
[ 262 ]
�
(Rev.1)� |
Proposal of third draft of K.soft_mes "Quality estimation methods and application guidelines for mitigation measures based on particle radiation tests"
�
� |
Fujitsu Limited
,
Hitachi, Ltd.
,
NEC Corporation
,
Nippon Telegraph and Telephone Corporation (NTT)
,
Oki Electric Industry Company Ltd. (OKI)
,
Xilinx Incorporation
� |
Q5/5
� |
2018-05-08 |
|
[ 261 ]
�
(Rev.1)� |
Proposal for the revision of ITU-T Rec. K.21 (07/2017) Resistibility of telecommunication equipment installed in customer premises to overvoltages and overcurrents
�
� |
Nokia Corporation
� |
Q2/5
� |
2018-05-07 |
|
[ 260 ]
�
(Rev.1)� |
Proposal for the revision of ITU-T Rec. K.45 (07/2017) Resistibility of telecommunication equipment installed in the access and trunk networks to overvoltages and overcurrents
�
� |
Nokia Corporation
� |
Q2/5
� |
2018-05-07 |
|
[ 259 ]
�
(Rev.1)� |
Proposal for Annex A "Case Study" to supplement TD 366 K.Supp-5G_EMF_Compliance: Electromagnetic field (EMF) compliance assessments for 5G wireless networks
�
� |
Ministry of Communications
,
India
� |
Q3/5
� |
2018-05-07 |
|
[ 258 ]
�
(Rev.1)� |
Proposal for Supplement K.BPrac (May 2018)
�
� |
GSMA
� |
Q3/5
� |
2018-05-07 |
|
[ 257 ]
�
� |
Modified proposal for Appendix II of K.121 on RF-EMF Compliance of Shared Radiocommunications Sites
�
� |
GSMA
� |
Q3/5
� |
2018-05-07 |
|
[ 256 ]
�
(Rev.1)� |
New version v 7.01 of the software "EMF-estimator"
�
� |
Orange Polska S.A.
,
National Institute of Telecommunications
,
Poland
� |
Q3/5
� |
2018-05-07 |
|
[ 255 ]
�
(Rev.1)� |
Minimum distances to transmitting antennas
�
� |
Orange Polska S.A.
� |
Q3/5
� |
2018-05-07 |
|
[ 254 ]
�
(Rev.1)� |
Revision of the ITU-T Recommendation K.90
�
� |
Orange Polska S.A.
� |
Q3/5
� |
2018-05-07 |
|
[ 253 ]
�
� |
Comparison of controlled and uncontrolled exposure levels
�
� |
Orange Polska S.A.
� |
Q3/5
� |
2018-05-07 |
|
[ 252 ]
�
(Rev.1)� |
Comparison of measurements of the exposure levels in countries with different exposure limits
�
� |
Orange
,
Orange Polska S.A.
� |
Q3/5
� |
2018-05-07 |
|
[ 251 ]
�
� |
Exposure levels in the vicinity of the collocated base stations
�
� |
Orange Polska S.A.
� |
Q3/5
� |
2018-05-07 |
|
[ 250 ]
�
(Rev.1)� |
Comments and proposed changes to K 44
�
� |
Cisco Systems, Inc.
� |
Q2/5
� |
2018-05-07 |
|
[ 249 ]
�
� |
Proposal for the revision of K.123 "Electromagnetic compatibility requirements for electrical equipment in telecommunication facilities"
�
� |
Nippon Telegraph and Telephone Corporation (NTT)
� |
Q4/5
� |
2018-05-07 |
|
[ 248 ]
�
� |
Proposal about resistibility level of internal Ethernet port
�
� |
Nippon Telegraph and Telephone Corporation (NTT)
� |
Q2/5
� |
2018-05-07 |
|
[ 247 ]
�
� |
Proposed revision of K.44 for definition of "Intra-system port"
�
� |
Nippon Telegraph and Telephone Corporation (NTT)
� |
Q2/5
� |
2018-05-07 |
|
[ 246 ]
�
� |
Comments and re-proposals on K.vss "Lightning protection and Earthing of Video Surveillance System"
�
� |
Nippon Telegraph and Telephone Corporation (NTT)
� |
Q1/5
� |
2018-05-07 |
|
[ 245 ]
�
(Rev.1)� |
The fourth draft of K.psp "Protection of small-size telecommunication installations with poor earthing conditions"
�
� |
China Unicom
� |
Q1/5
� |
2018-05-06 |
|
[ 244 ]
�
(Rev.1)� |
Proposal for the revision of ITU-T Rec. K.20 (07/2017) Resistibility of telecommunication equipment installed in a telecommunication centre to overvoltages and overcurrents
�
� |
Nokia Corporation
� |
Q2/5
� |
2018-05-03 |
|
[ 243 ]
�
(Rev.1)� |
Proposals to revise K.44 (2017) Resistibility tests for telecommunication equipment exposed to overvoltagesand overcurrents - Basic Recommendation
�
� |
Nokia Corporation
� |
Q2/5
� |
2018-05-03 |
|
[ 242 ]
�
� |
Second Draft new Recommendation ITU-T K.wire-line_emc
�
� |
Huawei Technologies Co., Ltd.
� |
Q4/5
� |
2018-05-03 |
|
[ 241 ]
�
(Rev.1-2)� |
The proposal of Mains power contact test for outdoor UTP/STP Ethernet in ITU-T K.20/K.21/K.45
�
� |
Huawei Technologies Co., Ltd.
� |
Q2/5
� |
2018-05-03 |
|
[ 240 ]
�
� |
Proposal to add a new Appendix to give some examples for protection GPS system against lightning in ITU-T K.112
�
� |
Huawei Technologies Co., Ltd.
� |
Q1/5
� |
2018-05-03 |
|
[ 239 ]
�
(Rev.1)� |
Proposal for Appendix II of K.121 on the Shared Radiocommunications Site
�
� |
Electronics and Telecommunications Research Institute (ETRI)
,
Korea (Rep. of)
,
Ministry of Science and ICT
� |
Q3/5
� |
2018-05-03 |
|
[ 238 ]
�
(Rev.1)� |
Proposal for some issues regarding the Technical Report on 5G and EMF
�
� |
Electronics and Telecommunications Research Institute (ETRI)
,
Korea (Rep. of)
,
Ministry of Science and ICT
� |
Q3/5
� |
2018-05-03 |
|
[ 237 ]
�
� |
Proposed text for K.121 Annex on Guidance on environmental management for shared sites
�
� |
China Telecommunications Corporation
� |
Q3/5
� |
2018-05-02 |
|
[ 236 ]
�
(Rev.1)� |
3rd draft of the new ITU-T Recommendation K.ipe "Electromagnetic compatibility requirements for Information Perception Equipment".
�
� |
China Telecommunications Corporation
,
Beijing University of Posts and Telecommunications
� |
Q4/5
� |
2018-05-02 |
|
[ 235 ]
�
� |
Proposed second draft of new Recommendation K.spdsafe "Guidance on safety relating to the use of surge protective devices and surge protective components in customer building and access network"
�
� |
Nippon Telegraph and Telephone Corporation (NTT)
� |
Q2/5
� |
2018-04-27 |
|
[ 234 ]
�
� |
Comments on use of terms of insulation and isolation
�
� |
Nippon Telegraph and Telephone Corporation (NTT)
� |
Q2/5
� |
2018-04-27 |
|
[ 233 ]
�
� |
Study of the desirability of easing the overvoltage resistibility requirement for STP Ethernet ports in K.20 and K.21
�
� |
Nippon Telegraph and Telephone Corporation (NTT)
� |
Q2/5
� |
2018-04-26 |
|
[ 232 ]
�
(Rev.1)� |
A Study on necessity of overvoltage test of USB port in K.20 and K.21 (in the case of connecting USB device which is supplied power by an AC adapter)
�
� |
Nippon Telegraph and Telephone Corporation (NTT)
� |
Q2/5
� |
2018-04-26 |
|
[ 231 ]
�
� |
K.45 cable length of 6 meters or less are exempt from testing
�
� |
ADTRAN
� |
Q2/5
� |
2018-04-23 |
|
[ 230 ]
�
(Rev.1)� |
Review of IEC 62305-4
�
� |
Littelfuse UK Ltd.
� |
Q1/5
� |
2018-04-19 |
|
[ 229 ]
�
� |
K.20 internal cable length of 10 meters or less are exempt from testing.
�
� |
ADTRAN
� |
Q2/5
� |
2018-04-19 |
|
[ 228 ]
�
(Rev.1)� |
Bridging Ethernet functional insulation
�
� |
Bourns Limited
� |
Q2/5
� |
2018-04-19 |
Resultats:62 documents R�sultats :�
1 -
2
�-�Suivant
� |
T�l�chargement de multiples documents:�Formats et langues � prendre en compte (si disponibles):