Contributions
�[�AI/Question:�Q2/5�]��� |
�
|
Num�ro�
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 75 ]
�
� |
Characteristics of Metal Oxide Varistors (MOVs) for the protection of telecommunications installations
�
� |
Huawei Technologies Co., Ltd.
� |
Q2/5
� |
2017-05-03 |
|
[ 74 ]
�
� |
The lightning test proposal of the Ethernet port and errata in K.20, K.21 and K.45
�
� |
Huawei Technologies Co., Ltd.
� |
Q2/5
� |
2017-05-03 |
|
[ 73 ]
�
� |
The lightning test proposal of the USB in K.20 and K.21
�
� |
Huawei Technologies Co., Ltd.
� |
Q2/5
� |
2017-05-03 |
|
[ 71 ]
�
� |
3-Electrode GDT operation in Ethernet circuits
�
� |
Bourns Limited
� |
Q2/5
� |
2017-05-02 |
|
[ 64 ]
�
� |
Appendix proposal for K.99 on GDT Component Form Factors
�
� |
Bourns Limited
� |
Q2/5
� |
2017-05-02 |
|
[ 55 ]
�
� |
Review of K.20, K.21, K.44 and K.45 - Part 3 K.44 generators and test circuits
�
� |
Bourns Limited
� |
Q2/5
� |
2017-05-02 |
|
[ 54 ]
�
� |
Review of K.20, K.21, K.44 and K.45 - Part 2 K.20, K.21 and K.45 Test tables columns 4 and 5
�
� |
Bourns Limited
� |
Q2/5
� |
2017-05-02 |
|
[ 40 ]
�
(Rev.1)� |
Review of K.20, K.21, K.44 and K.45 - Part 1 K.20, K.21 and K.45 Test tables columns 1 through 3
�
� |
Bourns Limited
� |
Q2/5
� |
2017-04-29 |
|
[ 32 ]
�
(Rev.1)� |
Proposed change on flowchart for K.44 to select resistibility level of equipment in customer premises being discussed
�
� |
Nippon Telegraph and Telephone Corporation (NTT)
� |
Q2/5
� |
2017-04-28 |
|
[ 27 ]
�
(Rev.1)� |
Draft of K.rcd "Technical requirements for residual current operated protective devices with automatic-reclosing devices for telecom uses".
�
� |
China Telecommunications Corporation
� |
Q2/5
� |
2017-04-28 |
|
[ 22 ]
�
� |
Proposed study on safety of bridging by SPD between primary and external circuit
�
� |
Nippon Telegraph and Telephone Corporation (NTT)
� |
Q2/5
� |
2017-04-27 |
|
[ 19 ]
�
� |
The 3rd draft of Recommendation K.appl4: Surge Protective Component Application Guide - Lightning Isolation Transformers
�
� |
Nippon Telegraph and Telephone Corporation (NTT)
� |
Q2/5
� |
2017-04-27 |
|
[ 13 ]
�
� |
Definitions for AC supply configurations
�
� |
Bourns Limited
� |
Q2/5
� |
2017-04-15 |
|
[ 12 ]
�
� |
Updating K.20/K.21/K.45 2.1.5 and 2.1.6 test comments for C.002 six output 8/20 generator
�
� |
Bourns Limited
� |
Q2/5
� |
2017-04-14 |
|
[ 10 ]
�
� |
Draft K.appl4 - High frequency signal isolation transformers version
�
� |
Bourns Limited
� |
Q2/5
� |
2017-03-31 |
|
[ 8 ]
�
(Rev.1)� |
ITU K.20 Ethernet test level
�
� |
Littelfuse UK Ltd.
� |
Q4/5, Q2/5
� |
2017-03-28 |
|
[ 7 ]
�
(Rev.1)� |
ITU K.44 Figure A.6.7-5 figure edit
�
� |
Littelfuse UK Ltd.
� |
Q4/5, Q2/5
� |
2017-03-28 |
|
[ 6 ]
�
(Rev.1)� |
ITU K.51 Edits
�
� |
Littelfuse UK Ltd.
� |
Q4/5, Q2/5
� |
2017-03-22 |
|
[ 5 ]
�
(Rev.1)� |
Revision proposals for K.99
�
� |
EPCOS AG
� |
Q2/5
� |
2017-03-20 |
|
[ 4 ]
�
(Rev.1)� |
K.50 editorial changes and correct definitions use
�
� |
Littelfuse UK Ltd.
� |
Q4/5, Q2/5
� |
2017-03-10 |
|
[ 2 ]
�
(Rev.1-2)� |
Replacement K.44 Figure A.3-4 - 8/20 current generator
�
� |
Bourns Limited
� |
Q2/5
� |
2017-02-27 |
Resultats:21 documents
� |
T�l�chargement de multiples documents:�Formats et langues � prendre en compte (si disponibles):