Contributions
�[�Source:�ZTE Corporation�]��� |
�
|
Num�ro�
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 2127 ]
�
� |
Proposal to add a new information model controller component to G.cca
�
� |
ZTE Corporation
� |
Q14/15, Q12/15
� |
2016-09-06 |
|
[ 2126 ]
�
� |
Proposal to enhance the description of the NOSM in G.872
�
� |
ZTE Corporation
� |
Q6/15, Q12/15
� |
2016-09-06 |
|
[ 2113 ]
�
� |
Incremental Query in SDN
�
� |
ZTE Corporation
� |
Q14/15, Q12/15
� |
2016-09-06 |
|
[ 2112 ]
�
� |
Alarm Processing in Virtual Network
�
� |
ZTE Corporation
� |
Q14/15, Q12/15
� |
2016-09-06 |
|
[ 2111 ]
�
� |
Transport network batch query and processing solution in SDN environment
�
� |
ZTE Corporation
� |
Q14/15, Q12/15
� |
2016-09-06 |
|
[ 2110 ]
�
(Rev.1)� |
Transport synchronization message in FlexO interface
�
� |
ZTE Corporation
� |
Q13/15, Q11/15
� |
2016-09-06 |
|
[ 2109 ]
�
� |
Overhead processing of FlexE and FlexO atomic function
�
� |
ZTE Corporation
� |
Q11/15
� |
2016-09-06 |
|
[ 2097 ]
�
(Rev.1)� |
Basic requirements for channel bonding of NG-PON2
�
� |
ZTE Corporation
� |
Q2/15
� |
2016-09-06 |
|
[ 2095 ]
�
(Rev.1)� |
Channel bonding establishment for NGPON2
�
� |
ZTE Corporation
� |
Q2/15
� |
2016-09-06 |
|
[ 2093 ]
�
(Rev.1)� |
Big channel scheme for channel bonding of NG-PON2
�
� |
ZTE Corporation
� |
Q2/15
� |
2016-09-06 |
|
[ 2092 ]
�
(Rev.1)� |
proposal for 25G PON
�
� |
ZTE Corporation
� |
Q2/15
� |
2016-09-06 |
|
[ 2090 ]
�
� |
Attributes for SyncE extended SSM
�
� |
ZTE Corporation
� |
Q14/15, Q13/15
� |
2016-09-06 |
|
[ 2088 ]
�
(Rev.1)� |
Synchronization OAM
�
� |
ZTE Corporation
� |
Q14/15, Q13/15
� |
2016-09-06 |
|
[ 2057 ]
�
� |
Proposal on new Recommendation "Optical fibre cables for in-home directly wall surface applications"
�
� |
China Unicom
,
FiberHome Technologies Group
,
Ministry of Industry and Information Technology (MIIT)
,
ZTE Corporation
� |
Q16/15
� |
2016-09-05 |
|
[ 2047 ]
�
� |
Wavelength plan consideration of G.metro
�
� |
China Unicom
,
ZTE Corporation
� |
Q6/15
� |
2016-09-05 |
|
[ 2045 ]
�
� |
Proposal to study OSNR related issues of beyond 100G physical interface
�
� |
China Unicom
,
ZTE Corporation
� |
Q6/15
� |
2016-09-05 |
|
[ 2039 ]
�
� |
G.Fast: Application reference model(s) for coax
�
� |
ZTE Corporation
� |
Q4/15
� |
2016-09-05 |
|
[ 2038 ]
�
� |
G.Fast: Indication of QoS queues status for DTA control
�
� |
ZTE Corporation
� |
Q4/15
� |
2016-09-05 |
|
[ 2037 ]
�
� |
G.Fast: Requirements for DTA capability Negotiation and environment confirmation in the initialization stage for operation on twisted-pair cables
�
� |
ZTE Corporation
� |
Q4/15
� |
2016-09-05 |
|
[ 2036 ]
�
� |
G.Fast: Consideration for signalling mechanism of DTA updates
�
� |
ZTE Corporation
� |
Q4/15
� |
2016-09-05 |
|
[ 2035 ]
�
� |
G.fast: Considerations on pre-coding of 212MHz profile
�
� |
ZTE Corporation
� |
Q4/15
� |
2016-09-05 |
|
[ 1954 ]
�
� |
Synchronization management model, comments on TD549/WP3 Rev.1
�
� |
ZTE Corporation
� |
Q14/15, Q13/15
� |
2016-09-02 |
|
[ 1953 ]
�
(Rev.1)� |
Proposal for an information model for media
�
� |
ZTE Corporation
� |
Q14/15, Q12/15
� |
2016-09-02 |
|
[ 1952 ]
�
� |
Proposals to update draft Recommendation G.cca to describe ODUflex
�
� |
ZTE Corporation
� |
Q14/15, Q12/15
� |
2016-09-02 |
|
[ 1951 ]
�
� |
Proposed new text for clause 7.4 of G.cca
�
� |
ZTE Corporation
� |
Q14/15, Q12/15
� |
2016-09-02 |
|
[ 1950 ]
�
� |
Proposal to add an appendix to G.872 to describe FlexE
�
� |
ZTE Corporation
� |
Q12/15, Q11/15
� |
2016-09-02 |
|
[ 1949 ]
�
� |
Replacement text for Appendix II of G.872
�
� |
ZTE Corporation
� |
Q12/15
� |
2016-09-02 |
|
[ 1948 ]
�
� |
Proposal to update clause 11 "OTN survivability techniques" in G.872
�
� |
ZTE Corporation
� |
Q9/15, Q12/15, Q11/15
� |
2016-09-02 |
|
[ 1947 ]
�
� |
Replacement text for clause 10 of G.872
�
� |
ZTE Corporation
� |
Q12/15
� |
2016-09-02 |
|
[ 1946 ]
�
� |
Proposal to add a description of the use of FlexO in G.872
�
� |
ZTE Corporation
� |
Q12/15, Q11/15
� |
2016-09-02 |
|
[ 1945 ]
�
� |
Proposed modification to Clause 8 of G.872
�
� |
ZTE Corporation
� |
Q6/15, Q12/15
� |
2016-09-02 |
|
[ 1940 ]
�
� |
Proposal of a new supplement on 25 Gb/s transmission per wavelength
�
� |
Broadcom Corporation
,
China Telecommunications Corporation
,
China Unicom
,
Electronics and Telecommunications Research Institute (ETRI)
,
FiberHome Technologies Group
,
Futurewei Technologies US R&D Center
,
Huawei Technologies Co., Ltd.
,
ZTE Corporation
� |
Q2/15
� |
2016-09-02 |
|
[ 1933 ]
�
� |
considerations about the wavelength plan of G.metro
�
� |
ZTE Corporation
� |
Q6/15
� |
2016-09-02 |
|
[ 1932 ]
�
� |
Considerations on the EVM in the G.698.2
�
� |
ZTE Corporation
,
CAICT
,
Ministry of Industry and Information Technology (MIIT)
� |
Q6/15
� |
2016-09-02 |
|
[ 1785 ]
�
� |
Alarm processing in G.asdtn and G.gim
�
� |
ZTE Corporation
� |
Q14/15, Q12/15
� |
2016-02-02 |
|
[ 1766 ]
�
� |
XGS-PON TC considerations on XGS-PON and XG-PON1 co-existence
�
� |
ZTE Corporation
,
China Unicom
� |
Q2/15
� |
2016-02-02 |
|
[ 1764 ]
�
� |
Proposal for NG-PON2 amendment on channel bonding
�
� |
ZTE Corporation
� |
Q2/15
� |
2016-02-02 |
|
[ 1763 ]
�
� |
Comments on G.988 Amendment 2
�
� |
ZTE Corporation
� |
Q2/15
� |
2016-02-02 |
|
[ 1762 ]
�
� |
Comments on G.988 Amendment 1
�
� |
ZTE Corporation
� |
Q2/15
� |
2016-02-02 |
|
[ 1761 ]
�
� |
Proposal of line coding for 25Gb channel rate
�
� |
ZTE Corporation
� |
Q2/15
� |
2016-02-02 |
|
[ 1758 ]
�
� |
DNI protection method in G.MDSP
�
� |
ZTE Corporation
� |
Q9/15
� |
2016-02-02 |
|
[ 1729 ]
�
� |
Dual-rate support in XGS-PON
�
� |
British Telecommunications Public Ltd. Co. (BT Plc)
,
China Telecommunications Corporation
,
China Unicom
,
FiberHome Technologies Group
,
Futurewei Technologies US R&D Center
,
Huawei Technologies Co., Ltd.
,
Orange
,
ZTE Corporation
� |
Q2/15
� |
2016-02-02 |
|
[ 1686 ]
�
� |
Eye diagram Mask for XGS-PON
�
� |
Huawei Technologies Co., Ltd.
,
China Telecommunications Corporation
,
ZTE Corporation
� |
Q2/15
� |
2016-02-01 |
|
[ 1683 ]
�
� |
Text for clause 9 of G.872
�
� |
ZTE Corporation
� |
Q12/15
� |
2016-02-01 |
|
[ 1682 ]
�
� |
Text for clause 8 of G.872
�
� |
ZTE Corporation
� |
Q12/15
� |
2016-02-01 |
|
[ 1681 ]
�
� |
Text for clause 7 of G.872
�
� |
ZTE Corporation
� |
Q12/15
� |
2016-02-01 |
|
[ 1679 ]
�
� |
Proposal to modify the question text for Q12 in the next study period
�
� |
ZTE Corporation
� |
Q12/15
� |
2016-02-01 |
|
[ 1678 ]
�
� |
Information model for the NE synchronization functions
�
� |
ZTE Corporation
� |
Q14/15, Q13/15
� |
2016-02-01 |
|
[ 1661 ]
�
� |
G.Fast: Requirements for operation on copper lines extended to include coaxial cables
�
� |
ZTE Corporation
� |
Q4/15
� |
2016-02-01 |
|
[ 1660 ]
�
� |
G.Fast: Requirements for Dynamic Bandwidth Allocation (DBA) in G.fast operation on coax
�
� |
ZTE Corporation
� |
Q4/15
� |
2016-02-01 |
Resultats:188 documents R�sultats :�
1 -
2 -
3 -
4
�-�Suivant
� |
T�l�chargement de multiples documents:�Formats et langues � prendre en compte (si disponibles):