Union Internationale des T�l�communications UIT
EnglishEspa�ol
Plan du site Contactez-nous Copie Imprimable
Page d'accueil : UIT-T : SG 15 : R�union�2016-02-15�: Contributions� Ajout�s r�cemment�-� Recherche de documents de r�union
UIT-T�SG 15� C�(2016-02-15)�

UIT-T�SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

P�riode d'�tudes 2013

R�union� du 2016-02-15 au 2016-02-26

Lieu : Suisse [Gen�ve]

Autres r�unions : 2016-09-192015-06-222014-11-242014-03-242013-12-062013-07-012013-02-01

Resultats:47 documents
Contributions �[�AI/Question:�Q4/15�]���Documents / Contributions

Num�ro
Titre Source AI/Question
Date
[ 1858 ]
Configuration counters in L2 states (G.9701 Amd 1) � Intel Corporation Q4/15 2016-02-02
[ 1856 ]
Comments on the draft G.9701 Amendment 1 � Intel Corporation Q4/15 2016-02-02
[ 1840 ]
G.fast: Proximus requirements for G.fast operation on coax and CAT5 wires up to at least 150 meters � Proximus PLC Q4/15 2016-02-02
[ 1838 ]
G.fast: Analysis of dynamic time assignment (DTA) for upstream and downstream transmission � Futurewei Technologies US R&D Center , Metanoia Technologies, Inc. Q4/15 2016-02-02
[ 1817 ]
G.fast: Reduction of number VF samples reporting formats � Broadcom Corporation , Sckipio Technologies S.I. Ltd. Q4/15 2016-02-02
[ 1816 ]
G.fast: Clarification on byte order in SOC and EOC messages. � Broadcom Corporation , Sckipio Technologies S.I. Ltd. Q4/15 2016-02-02
[ 1812 ]
G.fast: G.9701 test parameters text improvements � Alcatel-Lucent International Q4/15 2016-02-02
[ 1810 ]
G.fast: Various text updates to G.9701 Amd1 Low power mode � Alcatel-Lucent International Q4/15 2016-02-02
[ 1809 ]
G.fast: Proposal to restrict upstream transmit power for 8dBm profile � Broadcom Corporation Q4/15 2016-02-02
[ 1808 ]
G.fast: G.ploam: G.997.2 parameters to support G.fast XLOG test parameter � Alcatel-Lucent International Q4/15 2016-02-02
[ 1807 ]
G.vdsl: Mis-estimation of SNR during MEDLEY � Broadcom Corporation , Intel Corporation , Qualcomm, Inc. Q4/15 2016-02-02
[ 1806 ]
Future work on G.fast recommendations � British Telecommunications Public Ltd. Co. (BT Plc) Q4/15 2016-02-02
[ 1805 ]
G.fast, Editorial Correction to Figure Z-2.1 � British Telecommunications Public Ltd. Co. (BT Plc) Q4/15 2016-02-02
[ 1804 ]
G.fast: G.fast XLOG test parameter � Alcatel-Lucent International Q4/15 2016-02-02
[ 1802 ]
G.fast, G.ploam: VCE ID and VCE port index in G.9701 Amd2 and G.997.2 Amd2 � Alcatel-Lucent International Q4/15 2016-02-02
[ 1801 ]
G.ploam, G.fast: Clarification on Unavailable State for corrigendum � Alcatel-Lucent International Q4/15 2016-02-02
[ 1800 ]
G.ploam: Test parameter update time stamps in G.997.2 Amd1 � Alcatel-Lucent International Q4/15 2016-02-02
[ 1799 ]
G.fast, G.ploam: Corrigenda to G.9701 and G.997.2 � Alcatel-Lucent International Q4/15 2016-02-02
[ 1798 ]
G.ploam, G.fast: Link state forced/enable/actual in G.9701 Amd1 and G.997.2 Amd1. � Alcatel-Lucent International Q4/15 2016-02-02
[ 1797 ]
G.ploam: Missing lom failure in G.997.1 � Alcatel-Lucent International Q4/15 2016-02-02
[ 1792 ]
G.vector: Considerations about Multi-Vendor Vectoring standardization � Telecom Italia S.p.A. Q4/15 2016-02-02
[ 1791 ]
G.fast: On data rate reporting � British Telecommunications Public Ltd. Co. (BT Plc) Q4/15 2016-02-02
[ 1787 ]
Proposal for TIGAV transmission method � Intel Corporation Q4/15 2016-02-02
[ 1783 ]
G.fast: Upstream Hlog reporting � British Telecommunications Public Ltd. Co. (BT Plc) Q4/15 2016-02-02
[ 1782 ]
G.ploam, Capability reporting in G.997.1 and G.997.2 � British Telecommunications Public Ltd. Co. (BT Plc) Q4/15 2016-02-02
[ 1774 ]
On G.fast based solution for Coax application � British Telecommunications Public Ltd. Co. (BT Plc) , Futurewei Technologies US R&D Center Q4/15 2016-02-02
[ 1744 ]
On the details of TIGAV procedure � Intel Corporation Q4/15 2016-02-02
[ 1743 ]
Proposed eoc settings for Annex Q when used with G.993.5 � Intel Corporation Q4/15 2016-02-02
[ 1742 ]
On the timeout of L2.1-Entry procedure (G.9701 Amd 1) � Intel Corporation Q4/15 2016-02-02
[ 1740 ]
Proposed corrigendum to G.9701 � Intel Corporation Q4/15 2016-02-02
[ 1702 ]
(Rev.1)
G.fast Amendment 2: Maximum Bit Loading Revisited � Huawei Technologies Co., Ltd. , Metanoia Technologies , Swisscom SA Q4/15 2016-02-01
[ 1701 ]
(Rev.1)
G.fast: Exchange and determine the time out of initialization stages in handshake � Huawei Technologies Co., Ltd. Q4/15 2016-02-01
[ 1672 ]
G.fast: Dynamic Bandwidth Allocation (DBA) for G.fast - control and management � ADTRAN , AT&T, Inc. Q4/15 2016-02-01
[ 1668 ]
(Rev.1)
G.fast: FTU-R software upgrade over eoc � ADTRAN , AT&T, Inc. , CenturyLink , Sckipio Technologies S.I. Ltd. Q4/15 2016-02-01
[ 1662 ]
G.fast, G.hs: G.994.1 tone sets for coax � ADTRAN , AT&T, Inc. , Broadcom Corporation , Qualcomm, Inc. , Sckipio Technologies S.I. Ltd. Q4/15 2016-02-01
[ 1661 ]
G.Fast: Requirements for operation on copper lines extended to include coaxial cables � ZTE Corporation Q4/15 2016-02-01
[ 1660 ]
G.Fast: Requirements for Dynamic Bandwidth Allocation (DBA) in G.fast operation on coax � ZTE Corporation Q4/15 2016-02-01
[ 1567 ]
G.fast: Framework for Dynamic US/DS Time Assignment Mechanism � Qualcomm, Inc. Q4/15 2016-01-29
[ 1565 ]
G.fast - specification of Impulse noise monitoring � Swisscom SA Q4/15 2016-01-29
[ 1563 ]
(Rev.1)
G.fast: requirements for the DBA TDD DS/US ratio limits � AT&T, Inc. , ADTRAN , Sckipio Technologies S.I. Ltd. Q4/15 2016-01-29
[ 1562 ]
G.fast coax cable configurations � ADTRAN , AT&T, Inc. Q4/15 2016-01-29
[ 1561 ]
(Rev.1)
G.fast 212 MHz amendment � AT&T, Inc. , Orange , TELUS Communications Q4/15 2016-01-29
[ 1550 ]
G.fast: Signalling of DBA updates over the RMC � ADTRAN , AT&T, Inc. , Sckipio Technologies S.I. Ltd. Q4/15 2016-01-28
[ 1549 ]
G.fast: DBA proposed way for changing the TDD DS/US ratio during showtime � ADTRAN , AT&T, Inc. , Sckipio Technologies S.I. Ltd. Q4/15 2016-01-28
[ 1526 ]
G.fast - Need for improved reporting of EFTR � Swisscom SA Q4/15 2016-01-27
[ 1524 ]
G.fast - Need for seamless reconfiguration of TARSNRM � Swisscom SA Q4/15 2016-01-22
[ 1499 ]
Release of BT cable (20 pair) NEXT measurements for use in simulations � British Telecommunications Public Ltd. Co. (BT Plc) Q4/15 2015-12-10
Resultats:47 documents
T�l�chargement de multiples documents:�Cocher les cases correspondant aux documents s�lectionn�s, puis appuyer sur "T�l�charger"

Pr�f�rences utilisateur:
T�l�chargement de multiples documents:�Formats et langues � prendre en compte (si disponibles):
Pages de navigation HTML
Formats �+�Autres formats
Langues (maximum 2) �+�Multilingue�
(E: Anglais - F: Fran�ais - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Testez ITU Translate pour la traduction automatique de documents
D�but de page�-� Commentaires�-� Contactez-nous�-� Droits d'auteur � UIT�2008�Tous droits r�serv�s
Contact pour cette page :� TSB EDH
Mis � jour le :�2025-1-25