Union Internationale des T�l�communications UIT
EnglishEspa�ol
Plan du site Contactez-nous Copie Imprimable
Page d'accueil : UIT-T : SG 15 : R�union�2014-03-24�: Documents Temporaires� Ajout�s r�cemment�-� Recherche de documents de r�union
UIT-T�SG 15� TD-WP2�(2014-03-24)�

UIT-T�SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

P�riode d'�tudes 2013

R�union� du 2014-03-24 au 2014-04-04

Lieu : Suisse [Gen�ve]

Autres r�unions : 2016-09-192016-02-152015-06-222014-11-24� [ 2014-03-24 ]� 2013-12-062013-07-012013-02-01

Resultats:44 documents
Documents Temporaires �(WP2) ��Documents / Contributions

Num�ro
Titre Source AI/Question
Date
[ 80-WP2 ]
Report of the Q8/15 meeting (Geneva, March - April 2014) � Rapporteur Q8/15 Q8/15 2014-04-02
[ 79-WP2 ]
Report of the Q6/15 meeting (Geneva, March - April 2014) � Rapporteur Q6/15 Q6/15 2014-04-02
[ 78-WP2 ]
Report of the Q7/15 meeting (Geneva, March - April 2014) � Rapporteur Q7/15 Q7/15 2014-04-02
[ 77-WP2 ]
Scope and summary for template from ITU-T A.1 for requesting SG15 approval for new Recommendation ITU-T L.91 � Rapporteur Q16/15 Q16/15 2014-04-02
[ 76-WP2 ]
Draft revised Recommendation ITU-T L.36 (version 2.0.1) � Rapporteur Q7/15 Q7/15 2014-04-01
[ 75-WP2 ]
(Rev.1-2)
Report of the Q5/15 meeting (Geneva, March - April 2014) � Rapporteur Q5/15 Q5/15 2014-03-31
[ 74-WP2 ]
Report of the Q17/15 meeting (Geneva, March - April 2014) � Rapporteur Q17/15 Q17/15 2014-03-29
[ 73-WP2 ]
(Rev.1-3)
Report of the Q16/15 meeting (Geneva, March - April 2014) � Rapporteur Q16/15 Q16/15 2014-03-28
[ 72-WP2 ]
Questionnaire on "micro-ducts technology and its application in the access network" � Rapporteur Q16/15 Q16/15 2014-03-28
[ 71-WP2 ]
Agenda of the joint Q5, 17/15 meeting (Geneva, 26 March 2014): Attenuation coefficient at 1650 nm � Rapporteur Q5/15 , Rapporteur Q17/15 Q5/15, Q17/15 2014-03-25
[ 70-WP2 ]
Agenda of the joint Q5, 6/15 meeting (Geneva, 26 March 2014): G.652 zero-dispersion wavelength � Rapporteur Q5/15 , Rapporteur Q6/15 Q6/15, Q5/15 2014-03-25
[ 69-WP2 ]
(Rev.1)
Reliability supplement: Correspondence report � Correspondence leader on reliability supplement Q5/15 2014-03-24
[ 68-WP2 ]
L.25: Correspondence summary � Editor L.25 Q17/15 2014-03-23
[ 67-WP2 ]
LS/i on fibre optic cable shrinkage effects and proposal for test on multi fibre cables with central tube and loose tube construction [from ETSI TC ATTM] � ETSI TC ATTM Q16/15 2014-03-21
[ 66-WP2 ]
(Rev.1)
Agenda of the Q16/15 meeting (Geneva, March - April 2014) � Rapporteur Q16/15 Q16/15 2014-03-20
[ 65-WP2 ]
G.977: Correspondence summary � Editor G.977 Q8/15 2014-03-20
[ 64-WP2 ]
WP2/15 proposed interim activities (for Agreement, 4 April 2014) � Chairman WP2/15 Q8/15, Q7/15, Q6/15, Q5/15, Q17/15, Q16/15 2014-03-19
[ 63-WP2 ]
WP2/15 outgoing Liaison Statements (for Agreement, 4 April 2014) � Chairman WP2/15 Q8/15, Q7/15, Q6/15, Q5/15, Q17/15, Q16/15 2014-03-19
[ 62-WP2 ]
(Rev.1)
WP2/15 Work Programme updates � Chairman WP2/15 Q8/15, Q7/15, Q6/15, Q5/15, Q17/15, Q16/15 2014-03-19
[ 61-WP2 ]
WP2/15 texts for Approval, Determination, Consent and Agreement (Geneva, 24 March - 4 April 2014) � Chairman WP2/15 Q8/15, Q7/15, Q6/15, Q5/15, Q17/15, Q16/15 2014-03-19
[ 60-WP2 ]
WP2/15 meeting report (Geneva, 24 March - 4 April 2014) � Chairman WP2/15 Q8/15, Q7/15, Q6/15, Q5/15, Q17/15, Q16/15 2014-03-19
[ 59-WP2 ]
(Rev.1-3)
Agenda of the WP2/15 meeting (Geneva, March - April 2014) � Chairman WP1/15 Q8/15, Q7/15, Q6/15, Q5/15, Q17/15, Q16/15 2014-03-19
[ 58-WP2 ]
(Rev.1)
Agenda of the Q8/15 meeting (Geneva, March - April 2014) � Rapporteur Q8/15 Q8/15 2014-03-19
[ 57-WP2 ]
Q8/15: Status report � Rapporteur Q8/15 Q8/15 2014-03-19
[ 56-WP2 ]
(Rev.1-3)
Proposal of questionnaire related to new study item "Plant solutions for FTTdp (fibre-to-the-distribution point) architecture" � Rapporteur Q16/15 Q16/15 2014-03-19
[ 55-WP2 ]
(Rev.1)
Agenda of the Q17/15 meeting (Geneva, March - April 2014) � Rapporteur Q17/15 Q17/15 2014-03-19
[ 54-WP2 ]
(Rev.1)
L.36 (Rev): Correspondence summary � Editor L.36 Q7/15 2014-03-18
[ 53-WP2 ]
(Rev.1)
Agenda of the Q7/15 meeting (Geneva, March - April 2014) � Rapporteur Q7/15 Q7/15 2014-03-18
[ 52-WP2 ]
Agenda of the Q5/15 meeting (Geneva, March - April 2014) � Rapporteur Q5/15 Q5/15 2014-03-18
[ 51-WP2 ]
L.53 (Rev): Correspondence summary � Editor L.53 Q17/15 2014-03-17
[ 50-WP2 ]
G-Suppl.39: Latest draft (v5.0.2) � Editor G-Suppl.39 Q6/15 2014-03-17
[ 49-WP2 ]
(Rev.1)
G.698.2: Overview of contributions proposing parameters and related test methods for 40G and 100G modulation formats in G.698.2 Version 0.9.1 � Editor G.698.2 Q6/15 2014-03-14
[ 48-WP2 ]
(Rev.1)
Agenda of the Q6/15 meeting (Geneva, March - April 2014) � Rapporteur Q6/15 Q6/15 2014-03-14
[ 47-WP2 ]
Proposed application parameters for G.695 version 5.0.1 � Editor G.695 Q6/15 2014-03-14
[ 46-WP2 ]
Metro DWDM systems: Correspondence activity summary � Metro DWDM systems correspondence coordinator Q6/15 2014-03-13
[ 45-WP2 ]
L.10, 26 and 43: Correspondence summary � Editor L.10, 26 and 43 Q16/15 2014-03-13
[ 44-WP2 ]
Proposed application parameters for G.698.3 version 1.0.2 � Editor G.698.3 Q6/15 2014-03-12
[ 43-WP2 ]
G.959.1: Latest draft (v6.0.2) � Editor G.959.1 Q6/15 2014-03-11
[ 42-WP2 ]
Proposed application parameters for ITU-T G.959.1 version 6.0.2 � Editor G.959.1 Q6/15 2014-03-11
[ 41-WP2 ]
G.697: Editor's considerations on clauses that need modifications for 40 Gbit/s and 100 Gbit/s applications � Editor G.697 Q6/15 2014-03-10
[ 40-WP2 ]
G.672: Latest draft (v1.0.1) � Editor G.672 Q7/15 2014-03-10
[ 39-WP2 ]
G.650.2: Correspondence summary � Editor G.650.2 Q5/15 2014-03-09
[ 38-WP2 ]
G.652 and G.657: Correspondence activity (December 2013 to March 2014) � Editor G.652, G.657 Q5/15 2014-03-04
[ 37-WP2 ]
L.gpsm: Correspondence summary � Editor L.gpsm Q17/15 2014-03-03
Resultats:44 documents
T�l�chargement de multiples documents:�Cocher les cases correspondant aux documents s�lectionn�s, puis appuyer sur "T�l�charger"

Pr�f�rences utilisateur:
T�l�chargement de multiples documents:�Formats et langues � prendre en compte (si disponibles):
Pages de navigation HTML
Formats �+�Autres formats
Langues (maximum 2) �+�Multilingue�
(E: Anglais - F: Fran�ais - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Testez ITU Translate pour la traduction automatique de documents
D�but de page�-� Commentaires�-� Contactez-nous�-� Droits d'auteur � UIT�2008�Tous droits r�serv�s
Contact pour cette page :� TSB EDH
Mis � jour le :�2025-1-10