Contributions
�[�AI/Question:�Q4/15�]��� |
�
|
Num�ro�
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 775 ]
�
(Rev.1)� |
G.fast: BT TAP comments on G.9700 (ex G.fast-PSD)
�
� |
British Telecommunications Public Ltd. Co. (BT Plc)
� |
Q4/15
� |
2014-03-11 |
|
[ 774 ]
�
� |
Parameterization of L2.1 multi-step entry procedure
�
� |
Lantiq Beteiligungs-GmbH & Co. KG
� |
Q4/15
� |
2014-03-11 |
|
[ 773 ]
�
� |
G.997.1: On extending G.997.1 to support PMA functionality
�
� |
British Telecommunications Public Ltd. Co. (BT Plc)
� |
Q4/15
� |
2014-03-11 |
|
[ 772 ]
�
� |
G.fast: On Reverse Power Feeding system noise requirements
�
� |
British Telecommunications Public Ltd. Co. (BT Plc)
� |
Q4/15
� |
2014-03-11 |
|
[ 767 ]
�
� |
G.vdsl2, G.inp: Stability issues and mitigation of non-stationary noise in LPM
�
� |
Lantiq Beteiligungs-GmbH & Co. KG
� |
Q4/15
� |
2014-03-11 |
|
[ 766 ]
�
� |
G.fast: Additional requirements to address specifics of RPF noise
�
� |
Lantiq Beteiligungs-GmbH & Co. KG
� |
Q4/15
� |
2014-03-11 |
|
[ 764 ]
�
� |
G.vdsl: New 998ADE17 Band Plan for VDSL2
�
� |
China Telecommunications Corporation
,
China Unicom
,
Huawei Technologies Co. Ltd.
,
Ministry of Industry and Information Technology (MIIT)
� |
Q4/15
� |
2014-03-11 |
|
[ 763 ]
�
� |
G.fast: Means for Transmission of Sync Symbols and RMC Symbols in L2.2
�
� |
Huawei Technologies Co. Ltd.
,
Ministry of Industry and Information Technology (MIIT)
� |
Q4/15
� |
2014-03-11 |
|
[ 762 ]
�
� |
G.fast: On TIGA and SRA
�
� |
Huawei Technologies Co. Ltd.
,
Ministry of Industry and Information Technology (MIIT)
� |
Q4/15
� |
2014-03-11 |
|
[ 756 ]
�
� |
Proposal of a new study item: "Plant solutions for FTTdp (Fiber To The distribution point) architecture"
�
� |
Italy
� |
Q4/15, Q16/15
� |
2014-03-11 |
|
[ 751 ]
�
� |
G.fast: Proposed Liaison to ETSI TM6 on RPF Noise
�
� |
Alcatel-Lucent France
� |
Q4/15
� |
2014-03-11 |
|
[ 750 ]
�
(Rev.1)� |
VDSL2 and G.FAST need a flexible protection mechanism against time varying noise.
�
� |
British Telecommunications Public Ltd. Co. (BT Plc)
� |
Q4/15
� |
2014-03-11 |
|
[ 749 ]
�
� |
G.fast: Data rate impact and requirements of Reverse Power Feeding systems
�
� |
Alcatel-Lucent France
� |
Q4/15
� |
2014-03-11 |
|
[ 748 ]
�
� |
G.inp: G.vdsl: VDSL2 Low Power Mode: Mandatory support of Virtual Noise
�
� |
Alcatel-Lucent France
� |
Q4/15
� |
2014-03-11 |
|
[ 746 ]
�
� |
G.fast: DTU's mapping and ACK bit-map structure (section 9.5)
�
� |
Sckipio Technologies S.I. Ltd.
� |
Q4/15
� |
2014-03-11 |
|
[ 745 ]
�
� |
G.fast: Alcatel-Lucent TAP comments on G.9700 (ex G.fast-PSD)
�
� |
Alcatel-Lucent France
� |
Q4/15
� |
2014-03-11 |
|
[ 665 ]
�
� |
G.fast: On the scope of G.fast Amendment 1
�
� |
British Telecommunications Public Ltd. Co. (BT Plc)
� |
Q4/15
� |
2014-03-10 |
|
[ 664 ]
�
� |
G.fast: On standardisation of advanced UPBO methods for vectored G.fast
�
� |
British Telecommunications Public Ltd. Co. (BT Plc)
� |
Q4/15
� |
2014-03-10 |
|
[ 607 ]
�
� |
IPR statement.
�
� |
Sckipio Technologies S.I. Ltd.
� |
Q4/15
� |
2014-03-10 |
|
[ 578 ]
�
� |
G.fast: Comments on link-state transition
�
� |
ZTE Corporation
� |
Q4/15
� |
2014-03-10 |
|
[ 511 ]
�
� |
G.inp: Comparison of L2.1 power reduction methods
�
� |
TQ DELTA. LLC
� |
Q4/15
� |
2014-03-07 |
|
[ 509 ]
�
� |
G.hn, G.vdsl, G.fast : Objectives and Tools for PLC to DSL Interference Mitigation
�
� |
Metanoia Technologies, Inc.
� |
Q4/15, Q18/15
� |
2014-03-07 |
|
[ 490 ]
�
� |
IPR: Ikanos Communications on IPR declarations on G.9700 and G.9701.
�
� |
Ikanos Communications
� |
Q4/15
� |
2014-03-07 |
|
[ 480 ]
�
� |
G.inp: Proposed edits to help complete the VDSL LPM Amendment
�
� |
Adaptive Spectrum and Signal Alignment (ASSIA) Inc.
,
Ikanos Communications
� |
Q4/15
� |
2014-03-07 |
|
[ 466 ]
�
� |
Considerations on DS/US adjustment for the VDSL2
�
� |
China Unicom
,
Huawei Technologies Co. Ltd.
� |
Q4/15
� |
2014-03-07 |
Resultats:25 documents
� |
T�l�chargement de multiples documents:�Formats et langues � prendre en compte (si disponibles):