Contributions
�[�AI/Question:�Q13/15�]��� |
�
|
Num�ro�
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 771 ]
�
� |
Document describing migration from other PTP profiles to G.8275.1
�
� |
Nokia Solutions and Networks Gmbh & Co. KG
� |
Q13/15
� |
2014-03-11 |
|
[ 770 ]
�
� |
Updates to G.8263 Testing
�
� |
Nokia Solutions and Networks Gmbh & Co. KG
� |
Q13/15
� |
2014-03-11 |
|
[ 759 ]
�
� |
Access budget within E2E Time/phase HRM
�
� |
British Telecommunications Public Ltd. Co. (BT Plc)
� |
Q13/15
� |
2014-03-11 |
|
[ 747 ]
�
� |
Information on Upcoming New Work on B100G OTN
�
� |
Huawei Technologies Co. Ltd.
� |
Q13/15, Q11/15
� |
2014-03-11 |
|
[ 737 ]
�
� |
Synchronization over OTN: application scenarios and standardization requirements for different OTN interface structures
�
� |
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
,
Ministry of Industry and Information Technology (MIIT)
,
ZTE Corporation
� |
Q13/15, Q11/15
� |
2014-03-11 |
|
[ 736 ]
�
� |
Frequency and time synchronization over OTN: requirements, implementation, deployments and test performance
�
� |
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
,
Ministry of Industry and Information Technology (MIIT)
,
ZTE Corporation
� |
Q13/15, Q11/15
� |
2014-03-11 |
|
[ 735 ]
�
� |
Proposal on Synchronization OAM in packet networks
�
� |
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
,
Ministry of Industry and Information Technology (MIIT)
,
ZTE Corporation
� |
Q13/15, Q10/15
� |
2014-03-11 |
|
[ 734 ]
�
� |
Proposal for clockClass definition
�
� |
China
� |
Q13/15
� |
2014-03-11 |
|
[ 731 ]
�
� |
Update of the table listing the ITU-T Recommendations suitable for conformity/interoperability testing
�
� |
Iometrix, Inc.
� |
Q13/15
� |
2014-03-11 |
|
[ 730 ]
�
� |
C&I pilot project for Synchronous Ethernet technology
�
� |
Iometrix, Inc.
� |
Q13/15
� |
2014-03-11 |
|
[ 729 ]
�
� |
Clarification of PTP unicast communication for G.8275.2 and G.8265.1 - request for unicast transmission of multiple types of PTP messages using Signaling messages
�
� |
Iometrix, Inc.
� |
Q13/15
� |
2014-03-11 |
|
[ 728 ]
�
� |
Guidance on the usage of the methods for PDV tolerance testing in G.8263
�
� |
Iometrix, Inc.
,
Orange
� |
Q13/15
� |
2014-03-11 |
|
[ 727 ]
�
� |
PTP GM performance specification in ITU-T
�
� |
Iometrix, Inc.
,
Orange
� |
Q13/15
� |
2014-03-11 |
|
[ 726 ]
�
� |
Notion of Quality Level of local clock in G.8265.1 during master selection
�
� |
Iometrix, Inc.
� |
Q13/15
� |
2014-03-11 |
|
[ 725 ]
�
� |
Review of G.8275.1 Latest Draft
�
� |
Iometrix, Inc.
� |
Q13/15
� |
2014-03-11 |
|
[ 724 ]
�
� |
Use of G.8265.1 telecom profile for Assisted Partial Timing Support
�
� |
Iometrix, Inc.
� |
Q13/15
� |
2014-03-11 |
|
[ 722 ]
�
� |
Clarification of PTP unicast communication for G.8275.1, G.8275.2 and G.8265.1 - modification of frequencyTraceable flag, timeTraceable flag, and clockClass
�
� |
Iometrix, Inc.
� |
Q13/15
� |
2014-03-11 |
|
[ 721 ]
�
� |
Comments on methods 1 and 2 for PDV tolerance testing in G.8263
�
� |
Iometrix, Inc.
� |
Q13/15
� |
2014-03-11 |
|
[ 720 ]
�
� |
Clarification of PTP unicast communication for G.8275.2 and G.8265.1 - use of all 1's for targetPortIdentity
�
� |
Iometrix, Inc.
� |
Q13/15
� |
2014-03-11 |
|
[ 701 ]
�
� |
Transparent clock model of 1588 over OTN
�
� |
ZTE Corporation
,
Ministry of Industry and Information Technology (MIIT)
� |
Q13/15, Q11/15
� |
2014-03-11 |
|
[ 700 ]
�
� |
Requirement of 1588 Transparent Clock function in OTN
�
� |
China Mobile Communications Corporation
,
Ministry of Industry and Information Technology (MIIT)
,
ZTE Corporation
� |
Q13/15, Q11/15
� |
2014-03-11 |
|
[ 699 ]
�
� |
Withdrawn by submitter
�
� |
N/A
� |
Q13/15
� |
2014-03-11 |
|
[ 687 ]
�
� |
Consideration for 1588 over OTN by ESC
�
� |
Calnex Solutions Limited
,
China Unicom
,
Huawei Technologies Co. Ltd.
� |
Q13/15, Q11/15
� |
2014-03-11 |
|
[ 686 ]
�
� |
Suggestions for time interface connection between OTN and Package Switching / Transport Network
�
� |
Calnex Solutions Limited
,
China Unicom
� |
Q13/15, Q11/15
� |
2014-03-11 |
|
[ 685 ]
�
� |
Test and analysis about PTP over OTN by transparent mode
�
� |
Calnex Solutions Limited
,
China Unicom
,
Huawei Technologies Co. Ltd.
� |
Q13/15, Q11/15
� |
2014-03-11 |
|
[ 680 ]
�
� |
Considerations for PTP over OTN network
�
� |
Ministry of Industry and Information Technology (MIIT)
,
China Telecommunications Corporation
,
China Unicom
� |
Q13/15
� |
2014-03-11 |
|
[ 660 ]
�
� |
G.8275.1: Frequency based ClockClasses for Option II and III networks
�
� |
Alcatel-Lucent USA Inc.
� |
Q13/15
� |
2014-03-10 |
|
[ 647 ]
�
� |
PDV Templates for testing Partial-Timing Support
�
� |
Microsemi
� |
Q13/15
� |
2014-03-10 |
|
[ 646 ]
�
� |
Key Performance Indices for APTSC
�
� |
Microsemi
� |
Q13/15
� |
2014-03-10 |
|
[ 645 ]
�
� |
Explanations regarding Time-Stability Metrics
�
� |
Ixia
,
Microsemi
� |
Q13/15
� |
2014-03-10 |
|
[ 644 ]
�
� |
Use of MATIE on Time Error
�
� |
Ixia
,
Microsemi
� |
Q13/15
� |
2014-03-10 |
|
[ 643 ]
�
� |
G.8273.2: Measurement Appendix
�
� |
Calnex Solutions Limited
� |
Q13/15
� |
2014-03-10 |
|
[ 642 ]
�
� |
Time Error Deviation (TEDEV)
�
� |
Ixia
,
Microsemi
� |
Q13/15
� |
2014-03-10 |
|
[ 641 ]
�
� |
G.8273.2: Holdover
�
� |
Calnex Solutions Limited
� |
Q13/15
� |
2014-03-10 |
|
[ 640 ]
�
� |
Maximum Absolute Average Time Error (MAATE)
�
� |
Ixia
,
Microsemi
� |
Q13/15
� |
2014-03-10 |
|
[ 639 ]
�
(Rev.1)� |
Synchronization over OTN network
�
� |
Huawei Technologies Co. Ltd.
� |
Q13/15, Q11/15
� |
2014-03-10 |
|
[ 638 ]
�
� |
Test error of PRTC of G.8272
�
� |
Huawei Technologies Co. Ltd.
� |
Q13/15
� |
2014-03-10 |
|
[ 637 ]
�
� |
Proposals for G.8275.1
�
� |
Huawei Technologies Co. Ltd.
� |
Q13/15
� |
2014-03-10 |
|
[ 636 ]
�
(Rev.1)� |
Effect of lower network limit on PTP slave clock
�
� |
Huawei Technologies Co. Ltd.
,
Orange
� |
Q13/15
� |
2014-03-10 |
|
[ 635 ]
�
� |
SyncE transient measurement method for G.8273.2
�
� |
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
,
Orange
� |
Q13/15
� |
2014-03-10 |
|
[ 634 ]
�
� |
Consideration of second-order filtering of T-BC for output transient due to SyncE rearrangement, plus several corrections for Appendix II/G.8273.2
�
� |
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
,
Orange
� |
Q13/15
� |
2014-03-10 |
|
[ 633 ]
�
� |
Physical layer frequency to PTP noise transfer gain peaking in G.8273.2
�
� |
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
,
Orange
� |
Q13/15
� |
2014-03-10 |
|
[ 632 ]
�
� |
Initial Results for Dynamic Time Error MTIE and TDEV at G.8271.1 Reference Point C
�
� |
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
,
Orange
� |
Q13/15
� |
2014-03-10 |
|
[ 631 ]
�
� |
Proposal on 21 hops of G.8271.1
�
� |
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
� |
Q13/15
� |
2014-03-10 |
|
[ 627 ]
�
� |
G.8263 Appendix I - Flicker/gamma equation formatting fixes
�
� |
Microsemi
� |
Q13/15
� |
2014-03-10 |
|
[ 626 ]
�
� |
G8263 Appendix I - TDEV illustrating flicker load
�
� |
Microsemi
� |
Q13/15
� |
2014-03-10 |
|
[ 625 ]
�
� |
Two-way metric Offset Max
�
� |
Microsemi
� |
Q13/15
� |
2014-03-10 |
|
[ 624 ]
�
� |
Framework for Temperature Performance
�
� |
Microsemi
� |
Q13/15
� |
2014-03-10 |
|
[ 609 ]
�
� |
NE Phase/Time Synchronization Supply Management
�
� |
Deutsche Telekom AG
� |
Q14/15, Q13/15
� |
2014-03-10 |
|
[ 601 ]
�
� |
T-BC Performance with/without SyncE [G.8273.2]
�
� |
Vitesse Semiconductor Corporation
� |
Q13/15
� |
2014-03-10 |
Resultats:80 documents R�sultats :�
1 -
2
�-�Suivant
� |
T�l�chargement de multiples documents:�Formats et langues � prendre en compte (si disponibles):