Union Internationale des T�l�communications UIT
EnglishEspa�ol
Plan du site Contactez-nous Copie Imprimable
Page d'accueil : UIT-T : SG 15 : R�union�2013-07-01�: Contributions� Ajout�s r�cemment�-� Recherche de documents de r�union
UIT-T�SG 15� C�(2013-07-01)�

UIT-T�SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

P�riode d'�tudes 2013

R�union� du 2013-07-01 au 2013-07-12

Lieu : Suisse [Gen�ve]

Autres r�unions : 2016-09-192016-02-152015-06-222014-11-242014-03-242013-12-062013-02-01

Resultats:34 documents
Contributions �[�Source:�FiberHome Technologies�]���Documents / Contributions

Num�ro
Titre Source AI/Question
Date
[ 400 ]
The difference of the trib and line side between the existing OTN and B100G OTN � FiberHome Technologies Group Q11/15 2013-06-18
[ 399 ]
The requirement of optical overhead extend at IrDI � China Unicom , FiberHome Technologies Group Q11/15 2013-06-18
[ 397 ]
The discussion about OTM- n.m IaDI interface of B100G � China Mobile Communications Corporation , FiberHome Technologies Group Q11/15 2013-06-18
[ 394 ]
Selection of protection transport entities in m1 SMP architecture � FiberHome Technologies Group Q9/15 2013-06-18
[ 393 ]
Editorial suggestions for G.8131.1 � FiberHome Technologies Group Q9/15 2013-06-18
[ 390 ]
Definition for Broadcast Bridge in G.8131.1 � FiberHome Technologies Group Q9/15 2013-06-18
[ 389 ]
(Rev.1)
Use cases for transport SDN � FiberHome Technologies Group Q14/15, Q12/15 2013-06-18
[ 365 ]
Propose to add 1dB and 3dB passband width parameters in G.680 � China Unicom , FiberHome Technologies Group Q6/15 2013-06-18
[ 363 ]
Requirement to clarify terms of the ripple and the passband width in G.680 � China Unicom , FiberHome Technologies Group Q6/15 2013-06-18
[ 356 ]
Modification of pre-emption principles in G.808.3 � FiberHome Technologies Group Q9/15 2013-06-18
[ 354 ]
some editorial suggestions for G.808.3 � FiberHome Technologies Group Q9/15 2013-06-18
[ 353 ]
proposal text about network objective of configuration inconsistance in G.808.3 � FiberHome Technologies Group Q9/15 2013-06-18
[ 351 ]
priority consideration for preemption in G.808.3 � FiberHome Technologies Group Q9/15 2013-06-18
[ 263 ]
proposal for study on requirements for wavelength selective reflector in in-service fibre test system application � China Telecommunications Corporation , FiberHome Technologies Group , Huawei Technologies Co. Ltd. , ZTE Corporation Q17/15 2013-06-17
[ 68 ]
(Rev.1-2)
Proposal of SDN-based transport network standardization � FiberHome Technologies Group Q14/15, Q12/15 2013-06-13
[ 67 ]
(Rev.1-3)
Proposal of research on NBI functionality of controller in SDN-based transport network � FiberHome Technologies Group Q14/15, Q12/15 2013-06-13
[ 66 ]
(Rev.1-2)
The research of the functions features of the transport network controller � China Unicom , FiberHome Technologies Group Q14/15, Q12/15 2013-06-13
[ 65 ]
(Rev.1-2)
Proposal of research on transport network resource virtualization or abstraction � FiberHome Technologies Group Q14/15, Q12/15 2013-06-13
[ 64 ]
(Rev.1-2)
Proposal of research resource partitioning of SDN-based transport network � FiberHome Technologies Group Q14/15, Q12/15 2013-06-13
[ 63 ]
(Rev.1-2)
Proposal of research on coexistence and interworking between current transport network and SDN-based network � FiberHome Technologies Group Q14/15, Q12/15 2013-06-13
[ 62 ]
(Rev.1-2)
Proposal of research Secure Channel in SDN-based transport network � FiberHome Technologies Group Q14/15, Q12/15 2013-06-13
[ 61 ]
(Rev.1-2)
Proposal of research architecture for network management, controller and transport plane � China Unicom , FiberHome Technologies Group Q14/15, Q12/15 2013-06-13
[ 60 ]
(Rev.1-3)
Comments on CCCV mode in G.8121.2 � FiberHome Technologies Group Q10/15 2013-06-13
[ 58 ]
(Rev.1-3)
Comments on Ring Protection Function in G.8052 � FiberHome Technologies Group Q14/15 2013-06-13
[ 44 ]
(Rev.1)
Proposal for revision of recommendation ITU-T L.60 � FiberHome Technologies Group Q16/15 2013-06-13
[ 42 ]
(Rev.1)
Proposal to add related description of PMDQ in ITU-T Recommendation G.650.2(2007) � FiberHome Technologies Group , Ministry of Information and Industry of China Q5/15 2013-06-13
[ 41 ]
Definition of serial data interface comunication ME in G.988 � FiberHome Technologies Group , Huawei Technologies Co. Ltd. , ZTE Corporation Q2/15 2013-06-13
[ 40 ]
Comments and modifications to ODN reference architecture in G.multi � FiberHome Technologies Group Q2/15 2013-06-13
[ 38 ]
The improvement of 8B10B line coding of CPRI in G.989.2 Annex A � FiberHome Technologies Group Q2/15 2013-06-13
[ 37 ]
The requirement of CPRI signal transmission over P2P WDM system in G.989.2 Annex A � FiberHome Technologies Group Q2/15 2013-06-13
[ 36 ]
Proposal for ONU Activation in dual rate NGPON2 � FiberHome Technologies Group Q2/15 2013-06-13
[ 35 ]
Proposal for dual-rate implementation on NGPON2 PMD � FiberHome Technologies Group Q2/15 2013-06-13
[ 34 ]
Proposal for administrate channel amendment for dual rate NGPON2 � FiberHome Technologies Group Q2/15 2013-06-13
[ 33 ]
Amendment for bandwidth map in dual rate NGPON2 � FiberHome Technologies Group Q2/15 2013-06-13
Resultats:34 documents
T�l�chargement de multiples documents:�Cocher les cases correspondant aux documents s�lectionn�s, puis appuyer sur "T�l�charger"

Pr�f�rences utilisateur:
T�l�chargement de multiples documents:�Formats et langues � prendre en compte (si disponibles):
Pages de navigation HTML
Formats �+�Autres formats
Langues (maximum 2) �+�Multilingue�
(E: Anglais - F: Fran�ais - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Testez ITU Translate pour la traduction automatique de documents
D�but de page�-� Commentaires�-� Contactez-nous�-� Droits d'auteur � UIT�2008�Tous droits r�serv�s
Contact pour cette page :� TSB EDH
Mis � jour le :�2025-2-5