Contributions
�[�AI/Question:�Q11/15�]��� |
�
|
Num�ro�
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 403 ]
�
� |
Requirements for passive Metro DWDM interfaces
�
� |
Deutsche Telekom AG
� |
Q6/15, Q11/15
� |
2013-06-18 |
|
[ 402 ]
�
� |
Requirements for Beyond 100G OTN
�
� |
Nippon Telegraph and Telephone Corporation (NTT)
� |
Q11/15
� |
2013-06-18 |
|
[ 401 ]
�
� |
Application scenarios using new Metro DWDM interfaces
�
� |
Deutsche Telekom AG
� |
Q6/15, Q11/15
� |
2013-06-18 |
|
[ 400 ]
�
� |
The difference of the trib and line side between the existing OTN and B100G OTN
�
� |
FiberHome Technologies Group
� |
Q11/15
� |
2013-06-18 |
|
[ 399 ]
�
� |
The requirement of optical overhead extend at IrDI
�
� |
China Unicom
,
FiberHome Technologies Group
� |
Q11/15
� |
2013-06-18 |
|
[ 397 ]
�
� |
The discussion about OTM- n.m IaDI interface of B100G
�
� |
China Mobile Communications Corporation
,
FiberHome Technologies Group
� |
Q11/15
� |
2013-06-18 |
|
[ 396 ]
�
� |
The suggestion about OTM-0.mvn IrDI interface of B100G
�
� |
China Mobile Communications Corporation
,
China Mobile Communications Corporation
� |
Q11/15
� |
2013-06-18 |
|
[ 386 ]
�
� |
Mapping specification of single channel OTU3 and OTU4 using coherent techniques
�
� |
Deutsche Telekom AG
� |
Q6/15, Q11/15
� |
2013-06-18 |
|
[ 385 ]
�
� |
Strong FEC for OTU4 and Beyond 100G
�
� |
Deutsche Telekom AG
� |
Q6/15, Q11/15
� |
2013-06-18 |
|
[ 352 ]
�
� |
Proposal to add OTU0 frame format into G.709
�
� |
Electronics and Telecommunications Research Institute (ETRI)
,
Ericsson-LG
,
SK Telecom
� |
Q11/15
� |
2013-06-18 |
|
[ 331 ]
�
� |
G.698.3 considerations to add OTU0 frame format into G.709
�
� |
Electronics and Telecommunications Research Institute (ETRI)
,
Ericsson-LG
,
SK Telecom
� |
Q11/15
� |
2013-06-18 |
|
[ 330 ]
�
� |
Signal format considerations for optical network media channels of OTN Beyond 100G
�
� |
PMC-Sierra, Inc.
� |
Q11/15
� |
2013-06-18 |
|
[ 328 ]
�
� |
"Beyond 100G" OTUCn to OTLCn adaptation and commonality with n x 100G OTU4/OTL4 implementations
�
� |
Cortina Systems, Inc.
� |
Q11/15
� |
2013-06-18 |
|
[ 327 ]
�
� |
Logical Lane vs. Physical Lane Granularity and Rate selection for "Beyond 100G" Multilane OTL OTUCn interfaces
�
� |
Cortina Systems, Inc.
� |
Q11/15
� |
2013-06-18 |
|
[ 326 ]
�
� |
Reuse of 100G FECs for B100G
�
� |
Cortina Systems, Inc.
� |
Q11/15
� |
2013-06-18 |
|
[ 323 ]
�
� |
Interaction between GFEC and OTL4.10/OTL4.4
�
� |
Cortina Systems, Inc.
� |
Q6/15, Q11/15
� |
2013-06-18 |
|
[ 320 ]
�
� |
Frame format considerations for OTN Beyond 100G
�
� |
PMC-Sierra, Inc.
� |
Q11/15
� |
2013-06-18 |
|
[ 318 ]
�
� |
Updates to the Stair-Case Forward-Error-Correction Code for OTU4 & Beyond 100G Multi-Vendor IaDI "Black Link" and Beyond 100G IrDI
�
� |
Cortina Systems, Inc.
� |
Q6/15, Q11/15
� |
2013-06-18 |
|
[ 317 ]
�
� |
Parallel 40G SDH client adaptation model in G.798 for mapping into LO OPU3
�
� |
Cortina Systems, Inc.
� |
Q11/15
� |
2013-06-18 |
|
[ 299 ]
�
� |
Network media channel filtering considerations
�
� |
Infinera Corporation
� |
Q6/15, Q12/15, Q11/15
� |
2013-06-17 |
|
[ 278 ]
�
� |
Beyond 100G OTN relationships to IEEE Standardization Schedule
�
� |
Alcatel-Lucent USA Inc.
� |
Q11/15
� |
2013-06-17 |
|
[ 277 ]
�
� |
ODUflex hitless resizing beyond 100G
�
� |
Alcatel-Lucent USA Inc.
� |
Q11/15
� |
2013-06-17 |
|
[ 276 ]
�
� |
Multi-vendor IaDI
�
� |
Alcatel-Lucent USA Inc.
� |
Q11/15
� |
2013-06-17 |
|
[ 273 ]
�
� |
Timing for standardization of OTN beyond 100G
�
� |
Alcatel-Lucent USA Inc.
� |
Q6/15, Q11/15
� |
2013-06-17 |
|
[ 255 ]
�
� |
OTUCn/ODUCn proposal after Q11/15's Feb 2013 meeting
�
� |
China Telecommunications Corporation
,
Huawei Technologies Co. Ltd.
� |
Q11/15
� |
2013-06-17 |
|
[ 254 ]
�
� |
N*100G flexible bit rate OTUCn proposal
�
� |
China Mobile Communications Corporation
,
China Telecommunications Corporation
,
Huawei Technologies Co. Ltd.
,
Infinera Corporation
� |
Q11/15
� |
2013-06-17 |
|
[ 228 ]
�
� |
Extension of OTN hybrid equipment
�
� |
China Mobile Communications Corporation
,
China Unicom
,
Huawei Technologies Co. Ltd.
� |
Q11/15
� |
2013-06-17 |
|
[ 227 ]
�
� |
Enhancements of OTN hybrid equipment
�
� |
China Mobile Communications Corporation
,
China Telecommunications Corporation
,
Huawei Technologies Co. Ltd.
� |
Q11/15, Q10/15
� |
2013-06-17 |
|
[ 226 ]
�
� |
Multilayer protocol stack of OTN interface
�
� |
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
� |
Q11/15
� |
2013-06-17 |
|
[ 225 ]
�
� |
Comparison of OTU4Cn vs OTUCn
�
� |
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
� |
Q11/15
� |
2013-06-17 |
|
[ 224 ]
�
� |
Beyond 100G use case and design considerations
�
� |
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
� |
Q11/15
� |
2013-06-17 |
|
[ 223 ]
�
� |
Answers to B100G questions from Q11/15 rapporteur (TD22/GEN)
�
� |
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
� |
Q9/15, Q6/15, Q14/15, Q12/15, Q11/15
� |
2013-06-17 |
|
[ 222 ]
�
� |
Multi-carrier OCh signal and connection behaviour under optical layer faults
�
� |
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
� |
Q11/15
� |
2013-06-17 |
|
[ 220 ]
�
� |
OTM-1 multi vendor IaDI management capability requirements
�
� |
Huawei Technologies Co. Ltd.
� |
Q11/15
� |
2013-06-17 |
|
[ 219 ]
�
� |
Proposal to add a description of a multi-carrier OCh for the transport of an OTUk
�
� |
Huawei Technologies Co. Ltd.
� |
Q14/15, Q11/15
� |
2013-06-17 |
|
[ 217 ]
�
� |
Use of BIP monitors behind a HD or SD FEC process
�
� |
Huawei Technologies Co. Ltd.
� |
Q11/15
� |
2013-06-17 |
|
[ 216 ]
�
� |
Block diagram example of n x OTU4 and OTUCn framer
�
� |
Huawei Technologies Co. Ltd.
� |
Q11/15
� |
2013-06-17 |
|
[ 215 ]
�
� |
Beyond 100G tributary slot structure considerations
�
� |
Huawei Technologies Co. Ltd.
� |
Q11/15
� |
2013-06-17 |
|
[ 214 ]
�
� |
Proposal to add HAO capable ODUflex to MPLS-TP adaptation function
�
� |
Huawei Technologies Co. Ltd.
� |
Q11/15, Q10/15
� |
2013-06-17 |
|
[ 189 ]
�
� |
Multilayer protocol stack of OTN interface
�
Withdrawn: Duplicate of C-0226
� |
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
,
Ministry of Industry and Information Technology (MIIT)
� |
Q11/15
� |
2013-06-17 |
|
[ 169 ]
�
� |
B100G bit interleaving
�
� |
ZTE Corporation
� |
Q11/15
� |
2013-06-17 |
|
[ 146 ]
�
� |
Consideration on per-OCh monitor function for OTN beyond 100G interface
�
� |
KDDI Corporation
� |
Q11/15
� |
2013-06-16 |
|
[ 126 ]
�
� |
Proposed approach for work on OTN beyond 100G
�
� |
ZTE Corporation
� |
Q6/15, Q14/15, Q12/15, Q11/15
� |
2013-06-15 |
|
[ 125 ]
�
� |
Proposed model for the OTUCn and OCh layer for OTN beyond 100G
�
� |
China Telecommunications Corporation
,
China Unicom
,
ZTE Corporation
� |
Q6/15, Q14/15, Q12/15, Q11/15
� |
2013-06-15 |
|
[ 110 ]
�
� |
OTN Sec : Security for OTN beyond 100 Gbit/s
�
� |
Applied Micro Circuits Corporation (AMCC)
� |
Q11/15
� |
2013-06-14 |
|
[ 98 ]
�
� |
Considerations on flexible ODU and OTU overhead [SP7]
�
� |
Fujitsu Limited
� |
Q11/15
� |
2013-06-14 |
|
[ 97 ]
�
� |
Comparisons between single and multi OTUCm/OCh signal approaches [SP4, SP5]
�
� |
Fujitsu Limited
� |
Q11/15
� |
2013-06-14 |
|
[ 96 ]
�
� |
Considerations on B100G OTN multiplexing hierarchy [SP23]
�
� |
Fujitsu Limited
� |
Q11/15
� |
2013-06-14 |
|
[ 95 ]
�
(Rev.1)� |
Consideration on B100G OTN multiplexing
�
� |
Fujitsu Limited
� |
Q11/15
� |
2013-06-14 |
|
[ 93 ]
�
� |
Consideration on 400GE signal transmission over B100G OTN
�
� |
Fujitsu Limited
� |
Q11/15
� |
2013-06-14 |
Resultats:58 documents R�sultats :�
1 -
2
�-�Suivant
� |
T�l�chargement de multiples documents:�Formats et langues � prendre en compte (si disponibles):