Union Internationale des T�l�communications UIT
EnglishEspa�ol
Plan du site Contactez-nous Copie Imprimable
Page d'accueil : UIT-T : SG 16 : R�union�2009-07-10�: Documents Temporaires� Ajout�s r�cemment�-� Recherche de documents de r�union
UIT-T�SG 16� TD�(2009-07-10)�

UIT-T�SG 16

Terminaux, syst�mes et applications multim�dias

P�riode d'�tudes 2009

R�union� du 2009-07-10 au 2009-07-10

Lieu : Suisse [Gen�ve]

Autres r�unions : 2012-04-302011-11-212011-03-142010-07-192009-10-26� [ 2009-07-10 ]� 2009-06-262009-01-27

Resultats:25 documents
Documents Temporaires �(WP3) ��Documents / Contributions

Num�ro
Titre Source AI/Question
Date
[ 67-WP3 ]
(Rev.1)
Draft new G.711 Amendment 1 "Pulse code modulation (PCM) of voice frequencies: new Annex A 'Lossless encoding of PCM frames" (for Consent) � Editor G.711 Amd.1 Q10/16 2009-07-10
[ 66-WP3 ]
(Rev.1)
Liaison statements produced by Q6/16 � Rapporteur Q6/16 Q6/16 2009-07-10
[ 65-WP3 ]
Draft "Request for Video Test Sequences for Enhanced Performance Video Coding" Work (for approval) � Rapporteur Q6/16 Q6/16 2009-07-10
[ 64-WP3 ]
(Rev.1) +Add.1-2
Draft new ITU-T G.711.0 (ex G.711-LLC) "Lossless compression of G.711 pulse code modulation" (for Consent) � Editor G.711-LLC Q10/16 2009-07-10
[ 63-WP3 ]
Draft LSs from WP3/16 to IETF and to ETSI DECT, HGI � Chairman WP3/16 Q10/16, Q9/16, Q8/16, Q7/16, Q6/16 2009-07-09
[ 62-WP3 ]
(Rev.1)
LSs from Q10/16 � Rapporteurs Q10/16 Q10/16 2009-07-09
[ 61-WP3 ]
Draft Processing Test Plan for ITU-T G.711 post-processing module � Rapporteurs Q10/16 Q10/16 2009-07-09
[ 60-WP3 ]
Preparation of the STL Release 2009 � Rapporteurs Q10/16 Q10/16 2009-07-09
[ 59-WP3 ]
Processing Test Plan for the for the ITU-T Joint (G.718/G.729.1) SWB/Stereo extension Optimisation/Characterization phase � Rapporteurs Q10/16 Q10/16 2009-07-09
[ 58-WP3 ]
ITU-T characterization phase of the superwideband extension (SWB) to ITU-T G.722/G.711.1: List of conditions and stereo scenarios � Rapporteurs Q10/16 Q10/16 2009-07-09
[ 57-WP3 ]
+Add.1
Draft new ITU-T Rec.G.729.1 Corrigendum 1 "G.729-based embedded variable bit-rate coder: An 8-32 kbit/s scalable wideband coder bitstream interoperable with G.729: Corrections to source code" (for Consent) � Editor G.729.1 Q10/16 2009-07-09
[ 56-WP3 ]
Draft new Corrigendum 2 to Recommendation ITU-T G.718 (for Consent) � Editor G.718 Q9/16 2009-07-09
[ 55-WP3 ]
Draft revised Technical Paper HSTP-MCTB (ex HSTP-MCTA) "Media coding toolbox for IPTV: Audio and video codecs" (for Approval) � Rapporteur Q6/16 Q6/16 2009-07-09
[ 54-WP3 ]
(Rev.1)
LS prepared by Q8/16 at its meeting in Geneva, 6-9 July 2009 � Rapporteur Q8/16 Q8/16 2009-07-09
[ 53-WP3 ]
Processing plan (V1.0) for GSAD selection phase � Rapporteur Q8/16 Q8/16 2009-07-09
[ 52-WP3 ]
Performance evaluation plan (V1.0) for GSAD selection phase � Rapporteur Q8/16 Q8/16 2009-07-09
[ 51-WP3 ]
Draft Terms of Reference of the Enhanced Performance Video Coding Joint Collaborative Team (EPVC JCT) � Rapporteur Q6/16 Q6/16 2009-07-09
[ 50-WP3 ]
List of IPR information received between February and July 2009 for ITU-T WP3/16 Recommendations � TSB Q10/16, Q9/16, Q8/16, Q7/16, Q6/16 2009-07-09
[ 49-WP3 ]
List of Participants � TSB Q10/16, Q9/16, Q8/16, Q7/16, Q6/16 2009-07-06
[ 48-WP3 ]
(Rev.1)
Report of Q10/16 Rapp. Group meeting (Geneva, 6-9 July 2009) � Rapporteurs Q10/16 Q10/16 2009-07-06
[ 47-WP3 ]
(Rev.1) +Add.1
Report of Q9/16 Rapp. Group meeting (Geneva, 6-9 July 2009) � Rapporteur Q9/16 Q9/16 2009-07-06
[ 46-WP3 ]
(Rev.1) +Add.1
Report of Q8/16 Rapp.Group meeting (Geneva, 6-9 July 2009) � Rapporteur Q8/16 Q8/16 2009-07-06
[ 45-WP3 ]
(Rev.1)
Report of Q6/16 Rapp. Group meeting (London and Geneva, 1-3 and 6-8 July 2009) � Rapporteur Q6/16 Q6/16 2009-07-06
[ 44-WP3 ]
Report of Q6/16 Rapp. Group meeting (Yokohama, Japan, 15-18 April 2009) � Rapporteur Q6/16 Q6/16 2009-07-06
[ 43-WP3 ]
Draft agenda and work plan for WP 3/16 (Geneva, 10 July 2009) � Chairman WP 3/16 Q9/16, Q8/16, Q7/16, Q6/16, Q10/16 2009-04-17
Resultats:25 documents
T�l�chargement de multiples documents:�Cocher les cases correspondant aux documents s�lectionn�s, puis appuyer sur "T�l�charger"

Pr�f�rences utilisateur:
T�l�chargement de multiples documents:�Formats et langues � prendre en compte (si disponibles):
Pages de navigation HTML
Formats �+�Autres formats
Langues (maximum 2) �+�Multilingue�
(E: Anglais - F: Fran�ais - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Testez ITU Translate pour la traduction automatique de documents
D�but de page�-� Commentaires�-� Contactez-nous�-� Droits d'auteur � UIT�2008�Tous droits r�serv�s
Contact pour cette page :� TSB EDH
Mis � jour le :�2009-07-10