Contributions
�[�Source:�Broadcom�]��� |
�
|
Num�ro�
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 2125 ]
�
� |
G.fast: FEC resilience tests results.
�
� |
Broadcom Corporation
� |
Q4A/15
� |
2012-08-27 |
|
[ 2124 ]
�
� |
G.vector: VCE vendor and version information in O-SIGNATURE
�
� |
Broadcom Corporation
� |
Q4A/15
� |
2012-08-27 |
|
[ 1658 ]
�
(Rev.1)� |
G.inp: Proposed text for intra-DTU interleaver
�
� |
Broadcom Corporation
,
Metanoia Technologies, Inc.
� |
Q4/15
� |
2011-11-21 |
|
[ 1656 ]
�
(Rev.1)� |
G.fast: Vectoring complexity assessment
�
� |
Broadcom Corporation
� |
Q4/15
� |
2011-11-21 |
|
[ 1631 ]
�
(Rev.1)� |
G.inp, G.vector, VDSL2: Proposed Updated Framework for Extended Memory Operation
�
� |
Broadcom Corporation
,
Ikanos Communications
,
Lantiq Beteiligungs-GmbH & Co. KG
� |
Q4/15
� |
2011-11-21 |
|
[ 1149 ]
�
� |
G.INP: Proposed messages for SRA in ADSL mode
�
� |
Broadcom
,
Ikanos
� |
Q4/15
� |
2011-01-30 |
|
[ 856 ]
�
� |
G.INP: SRA Proposal for G.998.4
�
� |
Broadcom
� |
Q4/15
� |
2010-05-18 |
|
[ 855 ]
�
� |
G.vdsl: Proposed Text for Distribution of Time-of-Day over VDSL2 Links
�
� |
Broadcom
� |
Q4/15
� |
2010-05-18 |
|
[ 854 ]
�
� |
G.vdsl: G.adsl: Comments and way forward on INM accuracy
�
� |
Broadcom
� |
Q4/15
� |
2010-05-18 |
|
[ 544 ]
�
� |
G.inp: Comments on draft text �9.5
�
� |
Infineon Technologies USA
,
Broadcom
� |
Q4/15
� |
2009-09-18 |
|
[ 543 ]
�
� |
G.vector: Proposed way forward on the issue of FDM pilots
�
� |
Infineon Technologies USA
,
Actelis Networks
,
Aware Inc.
,
Broadcom
� |
Q4/15
� |
2009-09-18 |
|
[ 379 ]
�
� |
Methods for Measuring Multipoint Services Availability
�
� |
Cisco Ciena; China Telecom
,
AT&T
,
Broadcom Corporation
,
Ciena Corporation
,
Verizon
� |
Q9/15, Q10/15
� |
2009-09-10 |
|
[ 377 ]
�
� |
G.vdsl: G.993.2 initialization and memory split
�
� |
Broadcom
� |
Q4/15
� |
2009-09-10 |
|
[ 376 ]
�
� |
G.INP: Exchange of RRC look-back value
�
� |
Broadcom
� |
Q4/15
� |
2009-09-10 |
|
[ 375 ]
�
� |
G.INP: Various comments on G.INP draft
�
� |
Broadcom
� |
Q4/15
� |
2009-09-10 |
|
[ 374 ]
�
� |
G.INP: Clarification on EOC and counters
�
� |
Broadcom
� |
Q4/15
� |
2009-09-10 |
|
[ 109 ]
�
� |
G.INP: Working text for PMS-TC ARQ for VDSL2
�
� |
Broadcom, Ericsson, Pirelli Broadband Solutions, Thomson
� |
Q4/15
� |
2008-11-20 |
|
[ 108 ]
�
� |
G.INP: Working text for PMS-TC ARQ for ADSL2
�
� |
Broadcom, Ericsson, Pirelli Broadband Solutions, Thomson
� |
Q4/15
� |
2008-11-20 |
|
[ 106 ]
�
� |
G.INP: Comments on management of retransmission
�
� |
Broadcom
� |
Q4/15
� |
2008-11-20 |
|
[ 91 ]
�
� |
G.vector: Quantification of normalized error samples
�
� |
Broadcom
� |
Q4/15
� |
2008-11-19 |
|
[ 90 ]
�
� |
G.vector: Further specification of the vectoring back-channel
�
� |
Broadcom
� |
Q4/15
� |
2008-11-19 |
Resultats:21 documents
� |
T�l�chargement de multiples documents:�Formats et langues � prendre en compte (si disponibles):