Contributions
�[�AI/Question:�Q13/15�]��� |
�
|
Num�ro�
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 2384 ]
�
(Rev.1)� |
Boundary clock in networks and simulations
�
� |
Tellabs Oy
� |
Q13/15
� |
2012-08-28 |
|
[ 2383 ]
�
(Rev.1)� |
Boundary clock simulation model
�
� |
Tellabs Oy
� |
Q13/15
� |
2012-08-28 |
|
[ 2381 ]
�
(Rev.1)� |
G.8265.1 supported duration of negotiated service
�
� |
Tellabs Oy
� |
Q13/15
� |
2012-08-28 |
|
[ 2375 ]
�
� |
Cooperation of G.781 and BMCA in telecom profile for time
�
� |
Nokia Siemens Networks GmbH & Co. KG
� |
Q13/15
� |
2012-08-28 |
|
[ 2374 ]
�
� |
PDV test pattern for G.8263
�
� |
Nokia Siemens Networks GmbH & Co. KG
� |
Q13/15
� |
2012-08-28 |
|
[ 2362 ]
�
� |
Scope of G.8275.1
�
� |
France T�l�com Orange
� |
Q13/15
� |
2012-08-28 |
|
[ 2361 ]
�
� |
Review of G.8272 latest draft
�
� |
France T�l�com Orange
� |
Q13/15
� |
2012-08-28 |
|
[ 2360 ]
�
� |
G.8272: New Appendix describing possible PRTC locations
�
� |
France T�l�com Orange
� |
Q13/15
� |
2012-08-28 |
|
[ 2359 ]
�
� |
Results of PDV tolerance testing using sinusoidal patterns as defined in G.8263-Testing
�
� |
France T�l�com Orange
� |
Q13/15
� |
2012-08-28 |
|
[ 2358 ]
�
� |
G.8263: revised text for Appendix II dealing with Packet Delay Variation Noise Tolerance testing
�
� |
France T�l�com Orange
� |
Q13/15
� |
2012-08-28 |
|
[ 2357 ]
�
� |
Development of a new Appendix of G.8261.1 on PDV generation testing
�
� |
France T�l�com Orange
� |
Q13/15
� |
2012-08-28 |
|
[ 2344 ]
�
� |
Consequence of floor delay changes under tight PLL bandwidth
�
� |
RAD Data Communications, Ltd.
� |
Q13/15
� |
2012-08-28 |
|
[ 2343 ]
�
� |
The TVL of Signaling message
�
� |
Huawei Technologies Co. Ltd.
� |
Q13/15
� |
2012-08-28 |
|
[ 2341 ]
�
� |
The effect of MAC control pause operation for PTP synchronization
�
� |
Huawei Technologies Co. Ltd.
� |
Q13/15
� |
2012-08-28 |
|
[ 2340 ]
�
� |
Test error of PRTC
�
� |
Huawei Technologies Co. Ltd.
� |
Q13/15
� |
2012-08-28 |
|
[ 2339 ]
�
� |
PHY and intra-node noise error
�
� |
China Mobile Communications Corporation
,
France T�l�com Orange
,
Huawei Technologies Co. Ltd.
� |
Q13/15
� |
2012-08-28 |
|
[ 2338 ]
�
� |
Analysis about SyncE rearrangement for different message delays of G.781
�
� |
China Mobile Communications Corporation
,
France T�l�com Orange
,
Huawei Technologies Co. Ltd.
� |
Q13/15
� |
2012-08-28 |
|
[ 2276 ]
�
� |
Concerns regarding the packet selection methods for the PEC
�
� |
China Unicom
� |
Q13/15
� |
2012-08-28 |
|
[ 2275 ]
�
� |
Proposals for specifying relative aspects of T-BC recommended in G.8273.2
�
� |
China Unicom
� |
Q13/15
� |
2012-08-28 |
|
[ 2274 ]
�
� |
G.8273.3: Proposals about the functions of T-TC devices based on experimental results
�
� |
China Unicom
� |
Q13/15
� |
2012-08-28 |
|
[ 2245 ]
�
� |
DVB_ASI Jitter Accumulation over OTN Islands
�
� |
Huawei Technologies Co. Ltd.
,
Huawei Technologies Co. Ltd.
� |
Q9/15, Q13/15
� |
2012-08-28 |
|
[ 2244 ]
�
� |
Criterion for Minimum Detectable Floor Delay Step using minMATIE
�
� |
Huawei Technologies Co. Ltd.
,
Huawei Technologies Co. Ltd.
� |
Q13/15
� |
2012-08-28 |
|
[ 2243 ]
�
� |
Effect of Turnaround on Time Transport Performance using PTP
�
� |
China Mobile Communications Corporation
,
France T�l�com Orange
,
Huawei Technologies Co. Ltd.
� |
Q13/15
� |
2012-08-28 |
|
[ 2242 ]
�
� |
Advantages of the Pdelay Mechanism in Time Transport using PTP for the case where SyncE is not Used for Frequency Transport
�
� |
China Mobile Communications Corporation
,
France T�l�com Orange
,
Huawei Technologies Co. Ltd.
� |
Q13/15
� |
2012-08-28 |
|
[ 2241 ]
�
� |
Discussion of T-BC/T-TSC Noise Generation for Phase/Time Synchronization using PTP without SyncE Support
�
� |
China Mobile Communications Corporation
,
France T�l�com Orange
,
Huawei Technologies Co. Ltd.
� |
Q13/15
� |
2012-08-28 |
|
[ 2240 ]
�
� |
Analysis of Protection Scenario 1 for Phase/Time Synchronization, for the Case of a Shorter SyncE Reference Chain
�
� |
China Mobile Communications Corporation
,
France T�l�com Orange
,
Huawei Technologies Co. Ltd.
� |
Q13/15
� |
2012-08-28 |
|
[ 2239 ]
�
� |
Further Discussion of BMCA Requirements for the Phase/Time PTP Telecom Profile, and Example Alternate BMCAs
�
� |
China Mobile Communications Corporation
,
France T�l�com Orange
,
Huawei Technologies Co. Ltd.
� |
Q13/15
� |
2012-08-28 |
|
[ 2238 ]
�
� |
Analysis of HRM2b SyncE Rearrangement for Various T-TSC Bandwidths, with SyncE Transients Slowed Down by T-BCs and T-TSC, and Conclusions on Mitigation of Effect of the Rearrangement
�
� |
China Mobile Communications Corporation
,
France T�l�com Orange
,
Huawei Technologies Co. Ltd.
� |
Q13/15
� |
2012-08-28 |
|
[ 2237 ]
�
� |
Analysis of HRM2b SyncE Rearrangement with SyncE Transients Slowed Down by T-BCs
�
� |
China Mobile Communications Corporation
,
France T�l�com Orange
,
Huawei Technologies Co. Ltd.
� |
Q13/15
� |
2012-08-28 |
|
[ 2235 ]
�
� |
Analysis of HRM2b SyncE Rearrangement for Various T-TSC Bandwidths
�
� |
China Mobile Communications Corporation
,
France T�l�com Orange
,
Huawei Technologies Co. Ltd.
,
Iometrix
� |
Q13/15
� |
2012-08-28 |
|
[ 2212 ]
�
� |
Transparent Clocks and Issues Around Perceived Layer Violations [G.8275.1]
�
� |
Aviat Networks
,
Calnex Solutions Limited
,
Juniper Networks
,
Sprint
,
Vitesse Semiconductor Corporation
� |
Q13/15
� |
2012-08-28 |
|
[ 2195 ]
�
� |
Variable temperature test regime
�
� |
Rakon Limited
� |
Q13/15
� |
2012-08-27 |
|
[ 2194 ]
�
� |
G.8263 Clarification
�
� |
Rakon Limited
� |
Q13/15
� |
2012-08-27 |
|
[ 2172 ]
�
� |
Time sync architecture based on multiple PTP domains
�
� |
China Mobile Communications Corporation
,
ZTE Corporation
� |
Q13/15
� |
2012-08-27 |
|
[ 2171 ]
�
� |
Hold-off time and interactions between frequency and phase-time planes
�
� |
China Mobile Communications Corporation
,
ZTE Corporation
� |
Q13/15
� |
2012-08-27 |
|
[ 2170 ]
�
� |
A possible solution for multiple GMs and operator intervention
�
� |
China Mobile Communications Corporation
,
ZTE Corporation
� |
Q13/15
� |
2012-08-27 |
|
[ 2169 ]
�
� |
Sync OAM architecture and requirements
�
� |
China Mobile Communications Corporation
,
ZTE Corporation
� |
Q13/15
� |
2012-08-27 |
|
[ 2168 ]
�
� |
Further analysis about BMCA of time profile
�
� |
ZTE Corporation
� |
Q13/15
� |
2012-08-27 |
|
[ 2167 ]
�
� |
The mapping between ToD and PTP
�
� |
ZTE Corporation
� |
Q13/15
� |
2012-08-27 |
|
[ 2155 ]
�
� |
Analysis of interactive mechanism between two layers
�
� |
ZTE Corporation
� |
Q13/15
� |
2012-08-27 |
|
[ 2143 ]
�
� |
G.8273: Test methodology annex/appendix
�
� |
Calnex Solutions Limited
,
Deutsche Telekom AG
� |
Q13/15
� |
2012-08-27 |
|
[ 2106 ]
�
� |
Architecture Considerations for Time Distribution
�
� |
ADVA Optical Networking
� |
Q13/15
� |
2012-08-26 |
|
[ 2105 ]
�
� |
G.8261.1 Network limits
�
� |
ADVA Optical Networking
� |
Q13/15
� |
2012-08-26 |
|
[ 2104 ]
�
� |
PTP Network Probe and PTP Clock Probe
�
� |
ADVA Optical Networking
� |
Q13/15
� |
2012-08-26 |
|
[ 2103 ]
�
� |
Exact PTP clockclass values in application
�
� |
China Mobile Communications Corporation
� |
Q13/15
� |
2012-08-26 |
|
[ 2102 ]
�
� |
Proposal on PTP multicast MAC address in 8275.1
�
� |
China Mobile Communications Corporation
� |
Q13/15
� |
2012-08-26 |
|
[ 2101 ]
�
� |
Test and analysis of time synchronization using 1588v2 in 100G OTN long haul transport network
�
� |
China Mobile Communications Corporation
� |
Q13/15
� |
2012-08-26 |
|
[ 2100 ]
�
� |
Coordinate mechanism for SyncE and PTP
�
� |
China Mobile Communications Corporation
� |
Q13/15
� |
2012-08-26 |
|
[ 2095 ]
�
� |
PRTC Timing Signal Variation for a Particular Design
�
� |
SymmetriCom, Inc.
� |
Q13/15
� |
2012-08-25 |
|
[ 2087 ]
�
� |
Comments on the proposal to start work on OTN Performance Monitoring of Timing Adaptation processes
�
� |
PMC-Sierra, Inc.
� |
Q9/15, Q14/15, Q13/15, Q11/15
� |
2012-08-25 |
Resultats:92 documents R�sultats :�
1 -
2
�-�Suivant
� |
T�l�chargement de multiples documents:�Formats et langues � prendre en compte (si disponibles):