Union Internationale des T�l�communications UIT
EnglishEspa�ol
Plan du site Contactez-nous Copie Imprimable
Page d'accueil : UIT-T : SG15 : R�union�2011-02-14�: Documents Temporaires� Ajout�s r�cemment�-� Recherche de documents de r�union
UIT-T�SG15� TD-WP3�(2011-02-14)�

UIT-T�SG15

Transport network structures

P�riode d'�tudes 2009

R�union� du 2011-02-14 au 2011-02-25

Lieu : Suisse [Gen�ve]

Autres r�unions : 2012-09-10� 2012-05-11� 2011-12-052011-09-16� [ 2011-02-14 ]� 2010-10-222010-05-312010-01-152009-09-282009-05-152008-12-01

Resultats:57 documents
R�sultats :� 1 - 2 �-�Suivant Next
Documents Temporaires �(WP3) �[�AI/Question:�Q14/15�]���Documents / Contributions

Num�ro
Titre Source AI/Question
Date
[ 529-WP3 ]
Possible Paths Forward with MPLS-TP � Chairman WP3/15 Q9/15, Q3/15, Q15/15, Q14/15, Q13/15, Q12/15, Q11/15, Q10/15 2011-02-24
[ 528-WP3 ]
MPLS-TP status � Chairman WP3/15 Q9/15, Q3/15, Q15/15, Q14/15, Q13/15, Q12/15, Q11/15, Q10/15 2011-02-24
[ 527-WP3 ]
Provisional report of discussion in operators' meeting on MPLS-TP issues (For information) � Operators' meeting coordinator Q9/15, Q3/15, Q14/15, Q12/15, Q10/15 2011-02-24
[ 523-WP3 ]
iLS: The IETF MPLS working group request early review of two MPLS working group documents (ref #048.01) � IETF MPLS Q9/15, Q14/15, Q12/15, Q10/15 2011-02-22
[ 521-WP3 ]
Slides presented at the joint meeting of MPLS-TP, 21 February 2011 � Rapporteur Q12/15 Q9/15, Q3/15, Q14/15, Q12/15, Q10/15 2011-02-21
[ 520-WP3 ]
iLS: IETF PWE3 Working Group Last Call on draft-ietf-pwe3-mpls-tp-gal-in-pw-00 � IETF PWE3 Q9/15, Q14/15, Q12/15, Q10/15 2011-02-18
[ 515-WP3 ]
Q14/15 Agenda and Workplan � Rapporteur Q14/15 Q14/15 2011-02-14
[ 512-WP3 ]
Assignment of an Associated Channel Type for Packet Transport Network Applications - draft-tsb-mpls-tp-ach-ptn-00.txt � TSB Q9/15, Q14/15, Q12/15, Q10/15 2011-02-11
[ 511-WP3 ]
iLS: Response to Updated draft Recommendation G.8151 [Ref 045.03] � IETF MPLS Q9/15, Q14/15, Q12/15, Q10/15 2011-02-11
[ 508-WP3 ]
iLS: Status of the IETF MPLS-TP project documents 2011-02-11 (ref #052.01) � IETF MPLS Q9/15, Q14/15, Q12/15, Q10/15 2011-02-11
[ 507-WP3 ]
iLS: Response to Draft revised Recommendation G.8110.1 [Ref#044.03] � IETF Q9/15, Q14/15, Q12/15, Q10/15 2011-02-10
[ 506-WP3 ]
iLS: Response to Updated draft Recommendation G.8121 [Ref 042.03] � IETF Q9/15, Q14/15, Q12/15, Q10/15 2011-02-10
[ 504-WP3 ]
iLS: Recent IETF RFCs of Interest to SG15 � IETF Q9/15, Q3/15, Q14/15, Q12/15, Q10/15 2011-02-10
[ 497-WP3 ]
iLS: The IETF MPLS working group last call on "A Packet Loss and Delay Measurement Profile for MPLS-based Transport Networks" (ref #051.01) � IETF MPLS Q9/15, Q14/15, Q12/15, Q10/15 2011-02-07
[ 496-WP3 ]
Report of additional interim activities of Q14/15 on Recommendation ITU-T G.8052 � Rapporteur Q14/15 Q14/15 2011-02-07
[ 494-WP3 ]
Draft Recommendation ITU-T G.8052/Y.1346, "Protocol-neutral management information model for the Ethernet Transport network element", version 0.12 � Editor G.8052/Y.1346 Q14/15 2011-02-04
[ 492-WP3 ]
iLS: The IETF MPLS working group last call on "Proactive Connectivity Verification, Continuity Check and Remote Defect indication for MPLS Transport Profile" (ref #050.01) � IETF MPLS Q9/15, Q14/15, Q12/15, Q10/15 2011-02-03
[ 491-WP3 ]
iLS: The IETF MPLS working group last call on "MPLS-TP Linear Protection" (ref #049.01) � IETF MPLS Q9/15, Q14/15, Q12/15, Q10/15 2011-02-03
[ 490-WP3 ]
iLS: The IETF MPLS working group last call on "MPLS Fault Management OAM" (ref #047.01) � IETF MPLS Q9/15, Q14/15, Q12/15, Q1015 2011-02-03
[ 464-WP3 ]
CCSA Liaison to ITU-T SG15 on CCSA PTN standard status � CCSA Q9/15, Q3/15, Q14/15, Q12/15, Q10/15 2011-01-31
[ 463-WP3 ]
Editor version of G.8051/Y.1345 "Management aspects of the Ethernet-over-Transport (EoT) capable network element", version 2.04 � Editor G.8051/Y.1345 Q14/15 2011-01-31
[ 462-WP3 ]
(Rev.1)
Revised Recommendation ITU-T G.8080 � Editor G.8080 Q14/15, Q12/15 2011-01-31
[ 461-WP3 ]
(Rev.1)
Recommendation ITU-T G.8080 - Living list (v1.5) � Editor G.8080 Q14/15, Q12/15 2011-01-31
[ 449-WP3 ]
(Rev.1)
Draft revised Recommendation ITU-T G.800 � Editor G.800 Q14/15, Q12/15 2011-01-25
[ 447-WP3 ]
iLS: Response to Updated draft Recommendation G.tpoam [Ref 043.02] � IETF MPLS Q9/15, Q14/15, Q12/15, Q10/15 2011-01-21
[ 446-WP3 ]
iLS: Response to Updated draft Recommendation G.8151 [Ref 045.02] � IETF MPLS Q9/15, Q14/15, Q12/15, Q10/15 2011-01-21
[ 445-WP3 ]
iLS: Response to Draft revised Recommendation G.8110.1 [Ref#044.02] � IETF MPLS Q9/15, Q14/15, Q12/15, Q10/15 2011-01-21
[ 443-WP3 ]
iLS: Response to Review of MPLS Transport Profile User-to-Network and Network-to-Network Interfaces (ref #041.03) � IETF MPLS Q9/15, Q14/15, Q12/15, Q10/15 2011-01-21
[ 440-WP3 ]
Interim Meetings for WP3/15 � Chairman WP3/15 Q9/15, Q3/15, Q15/15, Q14/15, Q13/15, Q12/15, Q11/15, Q10/15 2011-02-24
[ 439-WP3 ]
Liaison Statements to/from WP3/15 � Chairman WP3/15 Q9/15, Q3/15, Q14/15, Q13/15, Q12/15, Q11/15, Q10/15 2011-02-24
[ 438-WP3 ]
WP3/15 status of Recommendations � Chairman WP3/15 Q9/15, Q3/15, Q15/15, Q14/15, Q13/15, Q12/15, Q11/15, Q10/15 2011-02-24
[ 437-WP3 ]
WP3/15 texts for consent and agreement � Chairman WP3/15 Q9/15, Q3/15, Q15/15, Q14/15, Q13/15, Q12/15, Q11/15, Q10/15 2011-02-24
[ 436-WP3 ]
Report of Working Party 3/15, Transport Network Structures (Geneva meeting, 14-25 February 2011) � Chairman WP3/15 Q9/15, Q3/15, Q14/15, Q13/15, Q12/15, Q11/15, Q10/15 2011-02-24
[ 435-WP3 ]
Agenda and Workplan for WP3/15 � Chairman WP3/15 Q9/15, Q3/15, Q15/15, Q14/15, Q13/15, Q12/15, Q11/15, Q10/15 2011-02-13
[ 433-WP3 ]
iLS: MPLS wg last call on draft-ietf-mpls-tp-identifiers-03 (Ref # 046.01) � IETF MPLS WG Q9/15, Q14/15, Q12/15, Q10/15 2010-12-15
[ 432-WP3 ]
iLS: Response to: LS231 - Comments on draft-ietf-ccamp-mpls-tp-cp-framework-02 (ref 040.03) � IETF MPLS WG Q9/15, Q14/15, Q12/15, Q10/15 2010-12-15
[ 431-WP3 ]
oLS: Comments on draft-ietf-ccamp-mpls-tp-cp-framework-02 [Ref # 040.02] � Rapporteur Q12/15, Q14/15 Q14/15, Q12/15 2010-12-10
[ 430-WP3 ]
oLS: Comments on draft-ietf-ccamp-mpls-tp-cp-framework-02 [Ref # 036.02] � Rapporteur Q12/15, Q14/15 Q14/15, Q12/15 2010-12-10
[ 429-WP3 ]
Report of Q14/15 Interim Meeting in Shanghai, 11 - 15 October 2010 � Rapporteur Q14/15 Q14/15 2010-12-09
[ 425-WP3 ]
Communication between TSB and IETF concerning G-ACh codepoints � TSB Q9/15, Q14/15, Q12/15, Q10/15 2010-11-24
[ 422-WP3 ]
Report of the Berlin experts meeting, 15-19 November 2010 � Rapporteur Q9/15, Q10/15, Q12/15, Q14/15 Q9/15, Q14/15, Q12/15, Q10/15 2010-11-19
[ 419-WP3 ]
iLS: Liaison announcing second approved draft of MEF 22.1 Mobile Backhaul Implementation Agreement Phase 2 � MEF Q9/15, Q3/15, Q15/15, Q14/15, Q13/15, Q12/15, Q11/15, Q10/15 2010-11-04
[ 417-WP3 ]
iLS: SOAM PM and SOAM FM SNMP MIB project status � MEF Q14/15 2010-11-04
[ 415-WP3 ]
iLS: Liaison Statement: MPLS working group last call on "MPLS Transport Profile User-to-Network and Network-to-Network Interfaces" (ref #041.01) � IETF MPLS WG Q9/15, Q14/15, Q12/15, Q10/15 2010-11-02
[ 411-WP3 ]
iLS: Liaison Statement: MPLS working group last call on "MPLS-TP OAM Analysis" (ref #041.01) � IETF MPLS WG Q9/15, Q14/15, Q12/15, Q10/15 2010-10-22
[ 409-WP3 ]
iLS: CCAMP working group last call on "MPLS-TP Control Plane Framework" (ref #040.01) � IETF CCAMP WG Q9/15, Q14/15, Q12/15, Q10/15 2010-10-20
[ 408-WP3 ]
iLS: Response to "LS163 - Comments on draft-ietf-mpls-tp-identifiers-01" Ref # 022.03 � IETF MPLS WG Q9/15, Q14/15, Q12/15, Q10/15 2010-10-15
[ 404-WP3 ]
iLS: Further WG Last Call on draft-ietf-mpls-tp-oam-framework-08.txt (ref # 039.01) � IETF MPLS WG Q9/15, Q14/15, Q12/15, Q10/15 2010-09-20
[ 401-WP3 ]
A.5 justification information for draft revised G.7714.1/Y.1705.1 covering three references added during AAP LC comment resolution in August 2010 � Rapporteur Q14/15 Q14/15 2010-08-13
[ 400-WP3 ]
iLS - CCSA Liaison to ITU-T SG15 on MPLS-TP OAM standard � CCSA Q9/15, Q3/15, Q14/15, Q12/15, Q10/15 2010-07-28
Resultats:57 documents
R�sultats :� 1 - 2 �-�Suivant Next
T�l�chargement de multiples documents:�Cocher les cases correspondant aux documents s�lectionn�s, puis appuyer sur "T�l�charger"

Pr�f�rences utilisateur:
T�l�chargement de multiples documents:�Formats et langues � prendre en compte (si disponibles):
Pages de navigation HTML
Formats �+�Autres formats
Langues (maximum 2) �+�Multilingue�
(E: Anglais - F: Fran�ais - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Testez ITU Translate pour la traduction automatique de documents
D�but de page�-� Commentaires�-� Contactez-nous�-� Droits d'auteur � UIT�2008�Tous droits r�serv�s
Contact pour cette page :� TSB EDH
Mis � jour le :�2025-1-25