Union Internationale des T�l�communications UIT
EnglishEspa�ol
Plan du site Contactez-nous Copie Imprimable
Page d'accueil : UIT-T : SG15 : R�union�2011-02-14�: Contributions� Ajout�s r�cemment�-� Recherche de documents de r�union
UIT-T�SG15� C�(2011-02-14)�

UIT-T�SG15

Transport network structures

P�riode d'�tudes 2009

R�union� du 2011-02-14 au 2011-02-25

Lieu : Suisse [Gen�ve]

Autres r�unions : 2012-09-102012-05-112011-12-052011-09-162010-10-222010-05-312010-01-152009-09-282009-05-152008-12-01

Resultats:66 documents
R�sultats :� 1 - 2 �-�Suivant Next
Contributions �[�AI/Question:�Q10/15�]���Documents / Contributions

Num�ro
Titre Source AI/Question
Date
[ 1518 ]
Structuring of MPLS-TP Recommendations � Telef�nica Investigaci�n y Desarrollo Q9/15, Q14/15, Q12/15, Q10/15 2011-02-11
[ 1508 ]
Proposal on adding bandwidth degradation message in Y.1731 � Huawei Q10/15 2011-02-02
[ 1499 ]
Requirement summary for adaptive bandwidth in packet network � Huawei Q9/15, Q10/15 2011-02-02
[ 1467 ]
(Rev.1)
Allocation and assignment of experimental and non-standard code points � United States of America Q10/15 2011-02-02
[ 1465 ]
(Rev.1)
USA on Consent of Draft Recommendation G.tpoam � United States of America Q10/15 2011-02-02
[ 1461 ]
Withdrawn by TSB (duplicate): See C-1439, "Comments on differentiation of MPLS-TP applications" � NSN Q9/15, Q14/15, Q12/15, Q10/15 2011-02-02
[ 1449 ]
Further consideration of requirements for on-demand segment monitoring in MPLS-TP � NTT , Telecom Italia Q12/15, Q10/15 2011-02-02
[ 1448 ]
Consideration and proposal for resolving issue of OAM solutions in MPLS-TP � NTT Q12/15, Q10/15 2011-02-02
[ 1447 ]
Proposal for additional delay measurement functions in MPLS-TP OAM � NTT Q9/15, Q14/15, Q10/15 2011-02-02
[ 1445 ]
Adherence to In-Force Cooperation Agreements for the Development of MPLS-TP OAM Solutions � ISOC Q9/15, Q14/15, Q12/15, Q10/15 2011-02-02
[ 1441 ]
Withdrawn: MPLS-TP Standards � BT Q9/15, Q14/15, Q12/15, Q10/15 2011-02-02
[ 1439 ]
Comments on differentiation of MPLS-TP environments � NSN Q9/15, Q14/15, Q12/15, Q10/15 2011-02-02
[ 1385 ]
Support for the consent of G.8110.1 and G.tpoam � Italy Q12/15, Q10/15 2011-02-01
[ 1384 ]
Structure and content of the MPLS-TP Recommendations � Telecom Italia Q9/15, Q14/15, Q12/15, Q10/15 2011-02-01
[ 1383 ]
Supporting consent of G.tpoam and choice of Associated Channel Type � Telecom Italia Q10/15 2011-02-01
[ 1377 ]
Proposed text for inclusion in G.8021 for Frame Loss Measurement � Huawei , China Mobile Communication Corporation Q9/15, Q10/15 2011-02-01
[ 1376 ]
Proposed text for defining "in-profile" frames in Y.1731 � NTT , NEC Q10/15 2011-02-01
[ 1372 ]
Withdrawn: Continued cooperation with IETF on MPLS for Transport Networks � Israel Q9/15, Q14/15, Q12/15, Q10/15 2011-02-01
[ 1370 ]
Comments on working assumption at Berlin meeting and TD377 (wd31r1) � NSN , BT , Cisco , Ericsson , Juniper , Qwest , Telenor , Verizon Q9/15, Q12/15, Q10/15 2011-02-01
[ 1365 ]
Status of IETF OAM tools for MPLS-TP � NSN , BT , Cisco , Ericsson , Juniper , Qwest , Telenor , Verizon Q10/15 2011-02-01
[ 1362 ]
Support for the consent of G.8110.1 and G.tpoam � SK Telecom , ETRI Q9/15, Q14/15, Q12/15, Q10/15 2011-02-01
[ 1361 ]
Structure of the MPLS-TP Recommendations � SK Telecom , ETRI Q9/15, Q14/15, Q12/15, Q10/15 2011-02-01
[ 1360 ]
Proposed text for channel type value in G.tpoam � SK Telecom , ETRI Q10/15 2011-02-01
[ 1339 ]
Fulfilling the OAM Requirements for MPLS-TP � NSN , BT , Cisco , Ericsson , Juniper , Qwest , Telenor , Verizon Q10/15 2011-02-01
[ 1329 ]
Rationale for support of 1SL in Y.1731 and G.8021 � AT&T , Verizon Q9/15, Q10/15 2011-02-01
[ 1327 ]
Proposal to define MI for G-Ach packets � Fujitsu , Hitachi , NEC Q9/15, Q14/15, Q10/15 2011-02-01
[ 1326 ]
Proposal to update the clause 9.3.2 in Y.1731 � Fujitsu Q10/15 2011-02-01
[ 1325 ]
Proposal to define Generic Notification message for ETH-OAM and Consideration on its application � Fujitsu Q9/15, Q10/15 2011-02-01
[ 1313 ]
Comments on GAL/G-Ach code points for MPLS-TP OAM operation � Hitachi Q10/15 2011-02-01
[ 1311 ]
Consideration of implementing both PTN-AOM and BFD-OAM � Hitachi Q10/15 2011-02-01
[ 1310 ]
Withdrawn by TSB (duplicate): See C-1292, "Validation and Versioning of Y.1731 PDUs" � Cisco Q10/15 2011-02-01
[ 1309 ]
Withdrawn by TSB (duplicate): See C-1291, "Opcodes for SLM" � Cisco Q10/15 2011-02-01
[ 1306 ]
Support for the consent of G.8110.1 and G.tpoam � Portugal Telecom Q12/15, Q10/15 2011-02-01
[ 1305 ]
Procedural issues on MPLS-TP � Cisco , AT&T , BT , Juniper , Qwest , Telenor , Telstra , Verizon Q9/15, Q3/15, Q14/15, Q12/15, Q11/15, Q10/15, Q1/15 2011-02-01
[ 1304 ]
Proposed text for G.tpoam � Cisco , BT , Ericsson , Juniper , NSN , Qwest , Telenor , Verizon Q10/15 2011-02-01
[ 1303 ]
Inter SDO Cooperation on MPLS-TP � Cisco , AT&T , BT , Juniper , Qwest , Telenor , Telstra , Verizon Q9/15, Q3/15, Q14/15, Q12/15, Q10/15, Q1/5 2011-02-01
[ 1302 ]
Technical issues with an OAM protocol based on draft-bhh-mpls-tp-oam-y1731 � Cisco , BT , Juniper , NSN , Qwest , Telenor , Telstra , Verizon Q10/15 2011-02-01
[ 1301 ]
Operator Requirements for MPLS-TP OAM � Verizon , BT , France Telecom Orange , Qwest , Telenor , Telstra Q9/15, Q14/15, Q12/15, Q10/15 2011-02-01
[ 1300 ]
Rationale to support Test ID in Delay Measurement in Y.1731 and G.8021 � Verizon , AT&T Q9/15, Q10/15 2011-02-01
[ 1299 ]
Comments on content of clauses 8 and 9 of G.tpoam � Cisco , Juniper , Verizon Q9/15, Q10/15 2011-02-01
[ 1298 ]
MPLS-TP OAM - issues with the proposed Y.1731 based OAM solution � Juniper Networks , Cisco , NSN , Verizon Q9/15, Q14/15, Q12/15, Q10/15 2011-02-01
[ 1292 ]
Validation and Versioning of Y.1731 PDUs � Cisco Q10/15 2011-02-01
[ 1291 ]
Opcodes for SLM � Cisco Q10/15 2011-02-01
[ 1269 ]
Proposed text for inclusion in Y.1731 for Frame Loss Measurement � Huawei Q9/15, Q10/15 2011-01-31
[ 1249 ]
PTN OAM upgrade from G.8114 to G-Ach+Y.1731 in China Mobile � CATR , China Mobile Q10/15 2011-01-31
[ 1248 ]
PTN GACh+Y.1731 OAM interoperability test activities and result � CATR , China Mobile Q9/15, Q14/15, Q12/15, Q10/15 2011-01-31
[ 1247 ]
Support for the consent of G.8110.1 and G.tpoam � China MIIT Q9/15, Q14/15, Q12/15, Q10/15 2011-01-31
[ 1243 ]
Comments on the extension of proactive loss measurement in Y.1731/G.8021 � NEC , Hitatchi Q9/15, Q10/15 2011-01-31
[ 1239 ]
Proposed clarification of ETH-CSF specification in Y.1731 � NEC Q9/15, Q10/15 2011-01-31
[ 1207 ]
Support for consent of G.tpoam � ZTE , Alcatel-Lucent Shanghai Bell , Fiberhome , Huawei Q9/15, Q14/15, Q12/15, Q10/15 2011-01-31
Resultats:66 documents
R�sultats :� 1 - 2 �-�Suivant Next
T�l�chargement de multiples documents:�Cocher les cases correspondant aux documents s�lectionn�s, puis appuyer sur "T�l�charger"

Pr�f�rences utilisateur:
T�l�chargement de multiples documents:�Formats et langues � prendre en compte (si disponibles):
Pages de navigation HTML
Formats �+�Autres formats
Langues (maximum 2) �+�Multilingue�
(E: Anglais - F: Fran�ais - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Testez ITU Translate pour la traduction automatique de documents
D�but de page�-� Commentaires�-� Contactez-nous�-� Droits d'auteur � UIT�2008�Tous droits r�serv�s
Contact pour cette page :� TSB EDH
Mis � jour le :�2025-1-25