Contributions
�[�AI/Question:�Q13/15�]��� |
�
|
Num�ro�
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 1070 ]
�
� |
1588v2 transmission by OSC over OTN
�
� |
FiberHome
,
CATR
,
ZTE
� |
Q13/15, Q11/15
� |
2010-05-21 |
|
[ 1068 ]
�
� |
Synchronization Requirement in OTN
�
� |
CMCC
� |
Q13/15, Q11/15
� |
2010-05-21 |
|
[ 1067 ]
�
� |
GPS timing receiver characterization
�
� |
Symmetricom
,
CATR
,
CMCC
� |
Q13/15, Q11/15
� |
2010-05-21 |
|
[ 1066 ]
�
� |
Analysis of time synchronization performance using PTP in hybrid transport network
�
� |
CMCC
,
CATR
,
ZTE
� |
Q13/15, Q11/15
� |
2010-05-21 |
|
[ 1065 ]
�
� |
Proposal of accelerating MTIE and TDEV mask study for time synchronization
�
� |
CMCC
,
CATR
,
Huawei
,
ZTE
� |
Q13/15
� |
2010-05-21 |
|
[ 1064 ]
�
� |
Proposal of research on link asymmetry compensation for PTP
�
� |
CMCC, ZTE, CATR
� |
Q13/15
� |
2010-05-21 |
|
[ 1063 ]
�
� |
Network limits reference model for time sync accuracy
�
� |
CMCC
,
ZTE
� |
Q13/15
� |
2010-05-21 |
|
[ 1061 ]
�
� |
Proposal of revising for SSM message delay description in G.8264
�
� |
CATR
� |
Q13/15
� |
2010-05-21 |
|
[ 1060 ]
�
� |
Objectives and Requirements for G.827x Recommendations
�
� |
CATR
,
Huawei
� |
Q13/15
� |
2010-05-21 |
|
[ 1042 ]
�
� |
Architecture of time synchronization using packet based method in G.8275
�
� |
ZTE
,
CMCC
� |
Q13/15
� |
2010-05-20 |
|
[ 1041 ]
�
� |
Issues about metrics of network limits for time synchronization
�
� |
ZTE
,
CATR
,
CMCC
� |
Q13/15
� |
2010-05-20 |
|
[ 1040 ]
�
� |
Field test of 1588v2 time sync based on physical layer frequency sync support
�
� |
ZTE
,
CATR
,
CMCC
� |
Q13/15
� |
2010-05-20 |
|
[ 1039 ]
�
� |
Definition related to time/phase sync in G.8260
�
� |
ZTE
,
CMCC
� |
Q13/15
� |
2010-05-20 |
|
[ 1038 ]
�
� |
Performance analysis of 1588v2 time/sync in field test
�
� |
ZTE
,
CMCC
� |
Q13/15
� |
2010-05-20 |
|
[ 1037 ]
�
� |
1588v2 test results with different clock mode and field network
�
� |
ZTE
,
CATR
,
CMCC
� |
Q13/15
� |
2010-05-20 |
|
[ 1036 ]
�
(Rev.1)� |
Consideration on Phase/Time synchronization over OTN
�
� |
ZTE
� |
Q13/15, Q11/15
� |
2010-05-20 |
|
[ 1025 ]
�
� |
Clarification on ODU Multiplexing
�
� |
AT&T
� |
Q13/15, Q12/15
� |
2010-05-20 |
|
[ 1019 ]
�
� |
G.8251: OTN timing aspects
�
� |
France T�l�com
� |
Q13/15, Q11/15
� |
2010-05-20 |
|
[ 1017 ]
�
� |
Network PDV accumulation study
�
� |
France T�l�com
� |
Q13/15
� |
2010-05-20 |
|
[ 1001 ]
�
� |
Equivalence of the IEEE 1588 Boundary Clock and Peer-to-Peer Transparent Clock for Synchronization Transport
�
� |
Huawei
� |
Q13/15
� |
2010-05-20 |
|
[ 995 ]
�
� |
Treatment of delay jumps in relation with MAFE/MATIE
�
� |
Nokia Siemens Networks
� |
Q13/15
� |
2010-05-20 |
|
[ 994 ]
�
� |
Packet metrics applied to two-way delay patterns
�
� |
Nokia Siemens Networks
� |
Q13/15
� |
2010-05-20 |
|
[ 993 ]
�
� |
Analysis of the floor delay window method
�
� |
Nokia Siemens Networks
� |
Q13/15
� |
2010-05-20 |
|
[ 992 ]
�
� |
Applicability of MATIE as a phase stability metric
�
� |
Nokia Siemens Networks
� |
Q13/15
� |
2010-05-20 |
|
[ 990 ]
�
� |
G.827x Slave Clock specification (for time)
�
� |
Deutsche Telekom
� |
Q13/15
� |
2010-05-20 |
|
[ 989 ]
�
� |
Q13 Requirements structure for time supply (G.827x)
�
� |
Deutsche Telekom
� |
Q13/15
� |
2010-05-20 |
|
[ 988 ]
�
� |
Input for G.827x Slave clock specification
�
� |
Deutsche Telekom
� |
Q13/15
� |
2010-05-20 |
|
[ 987 ]
�
� |
SyncE Jitter tolerance (high frequency)
�
� |
Deutsche Telekom
� |
Q13/15
� |
2010-05-20 |
|
[ 986 ]
�
� |
G.8265.1: Clarifications on the Telecom slave model with multiple slave-only OC instances
�
� |
France T�l�com
� |
Q13/15
� |
2010-05-20 |
|
[ 985 ]
�
� |
G.8265.1: Proposal for the PTP master selection process by a PTP slave in the PTPv2 telecom profile frequency-oriented
�
� |
France T�l�com
� |
Q13/15
� |
2010-05-20 |
|
[ 980 ]
�
� |
Proposal for Desynchronizer Bandwidths, GMP Mapping Granularities, and Mapper Buffer Hysteresis Values for new OTN clients and ODUs, for ITU-T Recommendations G.8251and G.798
�
� |
Huawei
,
Alcatel-Lucent Germany
� |
Q9/15, Q13/15
� |
2010-05-20 |
|
[ 978 ]
�
� |
Applicability of Jitter Requirements for SyncE interfaces
�
� |
Calnex Solutions
� |
Q13/15
� |
2010-05-20 |
|
[ 977 ]
�
� |
Transport of accurate Time Synchronization over access technologies
�
� |
Ericsson
� |
Q4/15, Q2/15, Q13/15
� |
2010-05-20 |
|
[ 976 ]
�
� |
Proposal for ODCb Transient Response for G.8251 Section A.8, to Reflect New CBR Clients having �100 ppm Frequency Tolerance
�
� |
Huawei
,
Alcatel-Lucent Germany
� |
Q13/15
� |
2010-05-19 |
|
[ 972 ]
�
� |
Further Analysis of RMS Frequency Offset for a CPRI Client Transported over OTN
�
� |
Huawei
� |
Q13/15
� |
2010-05-19 |
|
[ 970 ]
�
� |
Timing Transparency over OTN
�
� |
Alcatel-Lucent Germany
� |
Q13/15, Q11/15
� |
2010-05-19 |
|
[ 969 ]
�
� |
New Results for Serial Digital Interface Video Client Jitter and Wander Accumulation over OTN Islands
�
� |
Huawei
� |
Q13/15
� |
2010-05-19 |
|
[ 967 ]
�
� |
Additional Simulation Results for Peak-to-Peak Phase and RMS Frequency Offset for Transport of a CPRI Client over OTN
�
� |
Huawei
� |
Q13/15
� |
2010-05-19 |
|
[ 966 ]
�
� |
Proposed jitter tolerance specifications for G.8262
�
� |
JDSU
� |
Q13/15
� |
2010-05-19 |
|
[ 965 ]
�
� |
Further Simulation Results for syncE and STM-1 Jitter and Wander Accumulation over Networks of OTN Islands
�
� |
Huawei
� |
Q13/15
� |
2010-05-19 |
|
[ 963 ]
�
� |
Fibre Channel and Infiniband Jitter Accumulation over OTN Islands
�
� |
Huawei
� |
Q13/15, Q11/15
� |
2010-05-19 |
|
[ 959 ]
�
� |
Time and Phase Sync Interfaces (G.8271)
�
� |
Ericsson
� |
Q13/15
� |
2010-05-19 |
|
[ 949 ]
�
� |
Mapping method to support timing over OTN
�
� |
Huawei
� |
Q13/15, Q11/15
� |
2010-05-19 |
|
[ 948 ]
�
� |
Implementation analysis of timing over OTN
�
� |
Huawei
� |
Q13/15, Q11/15
� |
2010-05-19 |
|
[ 939 ]
�
� |
Time Synchronization Telecom Profiles
�
� |
Ericsson
� |
Q13/15
� |
2010-05-19 |
|
[ 905 ]
�
� |
Telecom Slave - State Machine Operations
�
� |
Huawei
� |
Q13/15
� |
2010-05-18 |
|
[ 904 ]
�
� |
G.827x Recommendations - High-Level Objectives
�
� |
Huawei
,
CATR
,
MII
� |
Q13/15
� |
2010-05-18 |
|
[ 903 ]
�
� |
Pulse-Per-Second Interface
�
� |
Huawei
,
CATR
,
China Mobile Communications Corporation
,
MII
� |
Q13/15
� |
2010-05-18 |
|
[ 902 ]
�
� |
PTP Profile Data Set Members
�
� |
Huawei
� |
Q13/15
� |
2010-05-18 |
|
[ 901 ]
�
� |
G.8264 ESMC Processing for G.8011.x Ethernet Services Types
�
� |
Huawei
� |
Q13/15, Q10/15
� |
2010-05-18 |
Resultats:109 documents R�sultats :�
1 -
2 -
3
�-�Suivant
� |
T�l�chargement de multiples documents:�Formats et langues � prendre en compte (si disponibles):