Union Internationale des T�l�communications UIT
EnglishEspa�ol
Plan du site Contactez-nous Copie Imprimable
Page d'accueil : UIT-T : SG15 : R�union�2008-12-01�: Contributions� Ajout�s r�cemment�-� Recherche de documents de r�union
UIT-T�SG15� C�(2008-12-01)�

UIT-T�SG15

Transport network structures

P�riode d'�tudes 2009

R�union� du 2008-12-01 au 2008-12-12

Lieu : Suisse [Gen�ve]

Autres r�unions : 2012-09-102012-05-112011-12-052011-09-162011-02-142010-10-222010-05-312010-01-152009-09-282009-05-15

Resultats:20 documents
Contributions �[�Source:�ZTE�]���Documents / Contributions

Num�ro
Titre Source AI/Question
Date
[ 314 ]
G.int: Proposal for Next-Generation LINK/PHY Interface � MII, China, Huawei, ZTE Q4/15 2008-11-25
[ 309 ]
G.int: Comments on LINK/PHY Interface � MII, China, Huawei, ZTE Q4/15 2008-11-25
[ 299 ]
Proposal on automatic discovery requirements in WDM network in G.7714.1 � ZTE Corporation Q14/15 2008-11-23
[ 298 ]
Clarifications on Key Management in GPON System � ZTE Corporation Q2/15 2008-11-23
[ 297 ]
BMC and SSM in 1588v2 Telecom Profiles for time/phase sync � ZTE Corporation Q13/15 2008-11-23
[ 296 ]
Considerations about 1588v2 Telecom Profiles classification for time sync in G.8265 � ZTE Corporation, CATR MII Q13/15 2008-11-23
[ 295 ]
(Rev.1)
Proposal to consider node resource management in G.8080 for WSON � ZTE Corporation Q12/15 2008-11-23
[ 294 ]
Includes pending state to support flushing FDB in non_revertive mechanism (G.8032) � ZTE Corporation, China Q9/15 2008-11-23
[ 293 ]
Flushing behaviour in interconnected ring protection (G.8032) � ZTE Corporation, China Q9/15 2008-11-23
[ 292 ]
FDB Flush Problem in non_revertive operation � ZTE Corporation, China Q9/15 2008-11-23
[ 291 ]
Difference between sub-ring and single ring protection (G.8032) � ZTE Corporation, China Q9/15 2008-11-23
[ 290 ]
Comparison between shared-link and sub-ring models (G.8032) � ZTE Corporation, China Q9/15 2008-11-23
[ 289 ]
Text Proposals in Appendix I for G.696.1 on mixed 10G/40G transmission � ZTE Corporation Q6/15 2008-11-23
[ 288 ]
Proposals on optical attenuator parameters in G.671 � ZTE Corporation, China Q7/15 2008-11-23
[ 287 ]
Proposal on PDL and PMD parameters in G.671 � ZTE Corporation, China Q7/15 2008-11-23
[ 286 ]
Proposals to Add Coordination Between Source and Destination to section 6.2 of G.7713 � ZTE Corporation Q14/15 2008-11-23
[ 285 ]
Comments to G.8152 � ZTE Corporation Q14/15 2008-11-23
[ 284 ]
Comments to G.8052 � ZTE Corporation Q14/15 2008-11-23
[ 283 ]
Add "central frequency deviation" parameter for transmitter in G.698.2 � ZTE Q6/15 2008-11-23
[ 271 ]
Restoration exercise � ZTE Corporation Q14/15, Q12/15 2008-11-23
Resultats:20 documents
T�l�chargement de multiples documents:�Cocher les cases correspondant aux documents s�lectionn�s, puis appuyer sur "T�l�charger"

Pr�f�rences utilisateur:
T�l�chargement de multiples documents:�Formats et langues � prendre en compte (si disponibles):
Pages de navigation HTML
Formats �+�Autres formats
Langues (maximum 2) �+�Multilingue�
(E: Anglais - F: Fran�ais - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Testez ITU Translate pour la traduction automatique de documents
D�but de page�-� Commentaires�-� Contactez-nous�-� Droits d'auteur � UIT�2008�Tous droits r�serv�s
Contact pour cette page :� TSB EDH
Mis � jour le :�2025-1-11