Contributions
�[�AI/Question:�Q9/15�]��� |
�
|
Num�ro�
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 338 ]
�
� |
G.8032 SF and FS
�
� |
Alcatel-Lucent, AimValley BV
� |
Q9/15
� |
2008-11-28 |
|
[ 335 ]
�
� |
Signal Degrade (SD) triggered protection switching
�
� |
Huawei Technologies Co., Ltd.
� |
Q9/15
� |
2008-11-26 |
|
[ 334 ]
�
� |
Proposal on the link recovery in case of multiple failures in G.8032
�
� |
Huawei Technologies Co., Ltd.
� |
Q9/15
� |
2008-11-26 |
|
[ 333 ]
�
� |
Proposal on the ring node initialization in G.8032
�
� |
Huawei Technologies Co., Ltd.
� |
Q9/15
� |
2008-11-26 |
|
[ 332 ]
�
� |
Proposal on flush optimization support in G.8032
�
� |
Huawei Technologies Co., Ltd.
� |
Q9/15
� |
2008-11-26 |
|
[ 331 ]
�
� |
Proposal on non-revertive mode in G.80323
�
� |
Huawei Technologies Co., Ltd.
� |
Q9/15
� |
2008-11-26 |
|
[ 307 ]
�
� |
G.8032 Flushing
�
� |
Alcatel-Lucent
� |
Q9/15
� |
2008-11-25 |
|
[ 306 ]
�
� |
G.8032 WTR and WTB comments
�
� |
Alcatel-Lucent, AimValley BV
� |
Q9/15
� |
2008-11-25 |
|
[ 305 ]
�
� |
G.8032 Statemachine
�
� |
Alcatel-Lucent, AimValley BV
� |
Q9/15
� |
2008-11-25 |
|
[ 304 ]
�
� |
G.8032 Priority Logic and Statemachine
�
� |
Alcatel-Lucent, AimValley BV
� |
Q9/15
� |
2008-11-25 |
|
[ 303 ]
�
� |
G.8032 Hidden Transitions
�
� |
Alcatel-Lucent, AimValley BV
� |
Q9/15
� |
2008-11-25 |
|
[ 294 ]
�
� |
Includes pending state to support flushing FDB in non_revertive mechanism (G.8032)
�
� |
ZTE Corporation, China
� |
Q9/15
� |
2008-11-23 |
|
[ 293 ]
�
� |
Flushing behaviour in interconnected ring protection (G.8032)
�
� |
ZTE Corporation, China
� |
Q9/15
� |
2008-11-23 |
|
[ 292 ]
�
� |
FDB Flush Problem in non_revertive operation
�
� |
ZTE Corporation, China
� |
Q9/15
� |
2008-11-23 |
|
[ 291 ]
�
� |
Difference between sub-ring and single ring protection (G.8032)
�
� |
ZTE Corporation, China
� |
Q9/15
� |
2008-11-23 |
|
[ 290 ]
�
� |
Comparison between shared-link and sub-ring models (G.8032)
�
� |
ZTE Corporation, China
� |
Q9/15
� |
2008-11-23 |
|
[ 279 ]
�
� |
G.8032 protection switching transient traffic performance requirement for next study period
�
� |
ETRI (Republic of Korea)
� |
Q9/15
� |
2008-11-23 |
|
[ 278 ]
�
� |
FDB-delete scheme for fast protection switching in G.8032 Ethernet ring protection
�
� |
ETRI (Korea, Republic of)
� |
Q9/15
� |
2008-11-23 |
|
[ 272 ]
�
� |
Naming Considerations regarding T-MPLS and MPLS-TP within ITU-T
�
� |
Alcatel-Lucent Italia, Alcatel Shanghai Bell, Ital
� |
Q9/15, Q3/15, Q11/15
� |
2008-11-23 |
|
[ 260 ]
�
� |
Proposal to specify Failure of Protocol defects for the R-APS protocol
�
� |
Lucent Technologies, Inc - AimValley BV
� |
Q9/15
� |
2008-11-21 |
|
[ 249 ]
�
� |
Corrigendum for G.709 correcting small mistake and inconsistency with G.798
�
� |
Alcatel Lucent Germany
� |
Q9/15, Q11/15
� |
2008-11-21 |
|
[ 233 ]
�
� |
Text proposal for clause 9.1.4/G.8021 ETH Split Horizon Flow Forwarding Function
�
� |
Huawei Technologies Co., Ltd.
� |
Q9/15
� |
2008-11-21 |
|
[ 226 ]
�
� |
Signal quality supervision functionality added into OCh and OMS layer (G.798)
�
� |
MII China
� |
Q9/15
� |
2008-11-21 |
|
[ 217 ]
�
� |
A couple of correction proposals to G.798
�
� |
MII, China
� |
Q9/15
� |
2008-11-21 |
|
[ 216 ]
�
� |
Proposal of various modifications to G.8032 version 2
�
� |
Lucent Technologies, Inc
� |
Q9/15
� |
2008-11-21 |
|
[ 180 ]
�
� |
Proposed text for G.supxx "Client services Sub ODU1 mapping into OTN using HO-VC mapping"
�
� |
Alcatel-Lucent
� |
Q9/15
� |
2008-11-21 |
|
[ 171 ]
�
� |
Comments on draft Recommendation G.8032 Version 2
�
� |
ETRI
� |
Q9/15
� |
2008-11-21 |
|
[ 162 ]
�
� |
Comments on the current text of G.808.2 and G.808.1
�
� |
Hitachi
� |
Q9/15
� |
2008-11-21 |
|
[ 161 ]
�
� |
Comments on RPL location in shared link case in G.8032v2
�
� |
Hitachi
� |
Q9/15
� |
2008-11-21 |
|
[ 156 ]
�
� |
State machine modification for forced switch in G.8032 Version 2
�
� |
ETRI, Korea (Republic of)
� |
Q9/15
� |
2008-11-21 |
|
[ 148 ]
�
� |
Proposal on the modification of the state machine initialization and some figures in G.8032v2
�
� |
ETRI
� |
Q9/15
� |
2008-11-21 |
|
[ 127 ]
�
� |
Ethernet Ring Topology Proposal
�
� |
ADTRAN
� |
Q9/15, Q14/15, Q12/15
� |
2008-11-20 |
|
[ 126 ]
�
� |
Proposed modification for the interoperability of ETH-LT in Y.1731
�
� |
Fujitsu
� |
Q9/15, Q10/15
� |
2008-11-20 |
|
[ 114 ]
�
� |
Reconsideration of topology restrictions on G.8032v2
�
� |
NEC Corporation and Fujitsu
� |
Q9/15
� |
2008-11-20 |
|
[ 105 ]
�
� |
G.8021 Appendix II Correction
�
� |
AT&T
� |
Q9/15
� |
2008-11-20 |
|
[ 102 ]
�
� |
Comments on G.8032 Version 2 - Ethernet ring protection switching
�
� |
Korea (Republic of)
� |
Q9/15
� |
2008-11-20 |
|
[ 94 ]
�
� |
G.8032 Efficient Flushing Mechanism
�
� |
Tejas Networks Ltd
� |
Q9/15
� |
2008-11-20 |
|
[ 93 ]
�
� |
G.8032 Dual Node Interconnect
�
� |
Tejas Networks Ltd
� |
Q9/15
� |
2008-11-20 |
|
[ 80 ]
�
(Rev.1)� |
Proposed modification of clearing FS/MS commands on G.8032
�
� |
NEC Corporation
� |
Q9/15
� |
2008-11-19 |
|
[ 63 ]
�
� |
Requirement for protected ring designation on shared link failure.
�
� |
NTT
� |
Q9/15
� |
2008-11-18 |
|
[ 61 ]
�
� |
A requirement of flexible interconnected rings construction for an ERP functional model
�
� |
NTT
� |
Q9/15
� |
2008-11-18 |
|
[ 57 ]
�
� |
Proposal of G.8032 Adaptation Function Description to G.8021
�
� |
NTT, Nokia Siemens Networks GmbH & Co. KG
� |
Q9/15
� |
2008-11-18 |
|
[ 55 ]
�
� |
Proposal of scope and order of priority for the second version of G.8032.
�
� |
NTT, Nokia Siemens Networks GmbH & Co. KG
� |
Q9/15
� |
2008-11-18 |
|
[ 45 ]
�
� |
G.8032 (ERP Version Control Protocol)
�
� |
Nortel Networks (Canada)
� |
Q9/15
� |
2008-11-18 |
|
[ 44 ]
�
� |
G.8032 (Multiple Failure Support)
�
� |
Nortel Networks (Canada)
� |
Q9/15
� |
2008-11-18 |
|
[ 43 ]
�
� |
G.8032 (Ring and Sub-Ring Proposal)
�
� |
Nortel Networks (Canada)
� |
Q9/15
� |
2008-11-18 |
|
[ 40 ]
�
� |
Proposed inclusion of a PBB model in G.8021
�
� |
Nortel Networks (Canada)
� |
Q9/15, Q12/15
� |
2008-11-18 |
|
[ 39 ]
�
� |
G.8032 (ERP Protocol Enhancements in Support of Backwards Compatibility)
�
� |
Nortel Networks (Canada)
� |
Q9/15
� |
2008-11-18 |
|
[ 37 ]
�
� |
Summary of WSON work
�
� |
Ciena Corporation
� |
Q9/15, Q14/15, Q12/15
� |
2008-11-18 |
|
[ 18 ]
�
� |
G.8021 Adaptation Function For PBB
�
� |
Nortel Networks (Canada)
� |
Q9/15
� |
2008-11-17 |
Resultats:57 documents R�sultats :�
1 -
2
�-�Suivant
� |
T�l�chargement de multiples documents:�Formats et langues � prendre en compte (si disponibles):