Union Internationale des T�l�communications UIT
EnglishEspa�ol
Plan du site Contactez-nous Copie Imprimable
Page d'accueil : UIT-T : SG05 : R�union�2012-04-11�: Contributions� Ajout�s r�cemment�-� Recherche de documents de r�union
UIT-T�SG05� C�(2012-04-11)�

UIT-T�SG05

ICT and climate change

P�riode d'�tudes 2009

R�union� du 2012-04-11 au 2012-04-19

Lieu : Suisse [Gen�ve]

Autres r�unions : 2012-10-082011-09-202011-04-272010-11-232010-10-012010-04-122010-01-192009-10-122009-05-252008-11-24

Resultats:23 documents
Contributions �[�AI/Question:�Q21/5�]���Documents / Contributions

Num�ro
Titre Source AI/Question
Date
[ 472 ]
Proposals towards Q21/5 Recommendation on L.adapter phase2 � A1 Telekom Austria AG , Alcatel-Lucent France , Belgacom , British Telecommunications Public Ltd. Co. (BT Plc) , Deutsche Telekom AG , France T�l�com Orange , Freescale Semiconductor , Huawei Technologies Co. Ltd. Q21/5 2012-03-30
[ 471 ]
L.adapter phase2 - proposals for electrical and mechanical characteristics � Telecom Italia S.p.A. Q21/5 2012-03-30
[ 470 ]
L.adapter phase2 - why World needs a Common Power Supply standard now � Telecom Italia S.p.A. Q21/5 2012-03-30
[ 464 ]
Structure of the Study on Due Diligence Guidelines for Metals Supply � Dem. Rep. of the Congo Q21/5 2012-03-30
[ 463 ]
Contribution on L.adapter Phase2 Draft Recommendation � France T�l�com Orange Q21/5 2012-03-30
[ 460 ]
L.adapter phase2 - energy efficiency and no-load proposals � Telecom Italia S.p.A. Q21/5 2012-03-30
[ 459 ]
L.adapter phase2 - efficiency versus load and equipment behaviour � Telecom Italia S.p.A. Q21/5 2012-03-30
[ 458 ]
L.adapter phase2 - considerations on failures on present power supplies � Telecom Italia S.p.A. Q21/5 2012-03-30
[ 446 ]
Prospective work items for recycling management of rare metals of ICT goods � Korea (Rep. of) Q21/5 2012-03-30
[ 445 ]
Proposal for the initial draft Recommendation of L.rareMetals-measurement, "Measurement method to characterize rare metals of ICT goods" � Korea (Rep. of) Q21/5 2012-03-30
[ 444 ]
Proposed requirements in L.adapter phase 2 � Nippon Telegraph and Telephone Corporation (NTT) Q21/5 2012-03-30
[ 443 ]
Proposed arrangement of scope and classifications for L.adapter Phase 2 � Nippon Telegraph and Telephone Corporation (NTT) Q21/5 2012-03-30
[ 442 ]
Proposed metrics for Power supply unit in L.M&M � Nippon Telegraph and Telephone Corporation (NTT) Q21/5, Q17/5 2012-03-30
[ 433 ]
Contribution to L.adapter phase 2 - Power supply interface standardisation for portable devices � Nokia Siemens Networks GmbH & Co. KG Q21/5 2012-03-29
[ 421 ]
Proposed structure of study report of lithium battery and proposal for a new work recommendation � China Mobile Communications Corporation , China Telecommunications Corporation , Ministry of Industry and Information Technology (MIIT) , ZTE Corporation Q21/5 2012-03-29
[ 415 ]
No Load Power and Ripple Voltage Test and Analysis for L.adapterPhase2 � China Mobile Communications Corporation , China Telecommunications Corporation , Huawei Technologies Co. Ltd. , Ministry of Industry and Information Technology (MIIT) , ZTE Corporation Q21/5 2012-03-29
[ 412 ]
(Rev.1)
JOINT INDUSTRY INPUT TO ITU-T SG5 Q21/5 BATTERY SIZE STANDARDISATION STUDY � Intel Corporation Q21/5 2012-03-28
[ 410 ]
(Rev.1)
Scope of L.adapter Phase 2 � United States Q21/5 2012-03-28
[ 409 ]
Scope of L.1000 phase 2 � Canada Q21/5 2012-03-28
[ 405 ]
Leveraging and enhancing the ICT Environmental sustainability � Alcatel-Lucent France , France T�l�com Orange , Huawei Technologies Co. Ltd. , Nokia Siemens Networks GmbH & Co. KG , Telecom Italia S.p.A. Q23/5, Q22/5, Q21/5, Q19/5, Q18/5, Q17/5 2012-03-28
[ 402 ]
Proposed new work item on life-cycle approach for ICT equipment � United Nations Environment Programme Q21/5 2012-03-28
[ 385 ]
Comments on CATR ID05 Ripple Voltage and No Load Power Test and Investigation for Adapters of ICT Devices � Research in Motion Q21/5 2012-03-23
[ 384 ]
Comments on CATR Contribution ID02 Study on common mode noise immunity test for touch screen ICT devices � Research in Motion Q21/5 2012-03-23
Resultats:23 documents
T�l�chargement de multiples documents:�Cocher les cases correspondant aux documents s�lectionn�s, puis appuyer sur "T�l�charger"

Pr�f�rences utilisateur:
T�l�chargement de multiples documents:�Formats et langues � prendre en compte (si disponibles):
Pages de navigation HTML
Formats �+�Autres formats
Langues (maximum 2) �+�Multilingue�
(E: Anglais - F: Fran�ais - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Testez ITU Translate pour la traduction automatique de documents
D�but de page�-� Commentaires�-� Contactez-nous�-� Droits d'auteur � UIT�2008�Tous droits r�serv�s
Contact pour cette page :� TSB EDH
Mis � jour le :�2025-2-19